HomeMy WebLinkAbout6.g. Payment #8 & Final – 2010 Street Improvements Project, City Project 428nO JE1r OU r 1 EXEC UTIVE"SUMMARY
CITY COUNCIL
a
City Council Meeting: September 20, 2011
13
AGENDA ITEM: Payment #8 & Final —2010 Street
AGENDA SECTION:
Improvements Project, City Project 428
Consent
PREPARED BY: Andrew J. Brotzler, PE, Director of Pub
AGENDA NO.
Works / City Engineer
ATTACHMENTS: Payment Voucher; Map
APPROVED BY:
RECOMMENDED ACTION: Motion to Approve Payment #8 and Final for the 2010 Street
Improvements Project, City Project 428, to McNamara Contracting, Inc., and Accept it for
Perpetual Maintenance.
BACKGROUND:
This item is on the agenda to request Payment #8 and Final in the amount of $24,389.81 to McNamara
Contracting, Inc. for the 2010 Street Improvements Project, City Project 428.
This project involved surface improvements (mill and overlay) to approximately 9 miles of urban local
streets in the Country Hills neighborhoods, and 1.56 miles of Shannon Parkway. This project also
included the replacement of existing trails and addition of trails in accordance with the City's adopted trail
and sidewalk plan.
The final construction amount of $2,024,488.08 is 6.5% below the contract amount of $2,165,832.81'.
SUMMARY:
Staff recommends that Council approve Payment #8 and final for the project and accept the project for
perpetual maintenance subject to the following conditions.
1. Satisfactorily showing that the contractor has complied with the provisions of Minnesota Statutes
290.92 requiring withholding state income tax.
2. Evidence in the form of an affidavit that all claims against the contractor by reasons of- the
contract have been fully paid or satisfactorily secured..
3. Consent of Surety to Final Payment certification from the contractor's surety.
4. Two -year maintenance bond.
G:ABNGPROJ \428 \20110920 CC Payment 8 &Tinal.doc
A
WSB
& Assoc- ,. Infrastructure ■ Engineering ■ Planning ■ Construction
701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
Tel: 763 -541 -4800
Fax: 763 -541 -1700
September 9, 2011
Mr. Andy Brotzler
City Engineer
City of Rosemount
2875 — 145 Street West
Rosemount, MN 55068
Attn: Cindy Dorniden, City of Rosemount
Re: Construction Pay Voucher No. 8 (Final)
2010 Street Improvements Project
S.A.P. 208 -104 -005 and S.A.P. 208 -106 -008'
City of Rosemount Project No. 428
WSB Project No. 1668 -93
Dear Mr. Brotzler:
Please find enclosed the final Construction Pay Voucher No. 8 for the above - referenced project in the
amount of $24,389.81.
' Also enclosed are the following documents required for processing final payment for the above -
referenced project:
I . Satisfactory showing that the contractor has complied with the provisions of Minnesota
Statutes 290.92 requiring withholding state income tax.
2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the
contract have been fully paid or satisfactorily secured.
3. Consent of Surety to Final Payment certification from the contractor's surety.
4. Two -year Maintenance Bond (warranty start date`to coincide with the date Council approves
final payment).
We recommend that you make final payment in the amount of $24,389.81 for McNamara
Contracting, Inc. at your earliest convenience. `Please contact me at 651- 322 -2015 if you have any
questions or comments regarding the attached information. Thank you.
Sincerely, '
WS p & Associates, Inc.
P son,
Project Engineer
Enclosures
cc: Mike McNamara, McNamara Contracting, Inc.
Joe Koscielak, WSB & Associates, Inc. isf
I
Date: 8/1 912 01 1
Request No.: 8 & FINAL
Project
Owner: City of Rosemount
1
2875 145th Street West
Rosemount, MN 55068 -4941
WSB
For Period: 8/1/2011 to 8/31/2011
$117,918.78
Contractor: McNamara Contracting, Inc.
3
16700 Chippendale Avenue
c ;fssocic+rce, trrc'.
Rosemount, MN 55068
4
Pay Voucher
"RSMT -2010 Street Improvement Project
5
Client Contract No.:
Project No.: 01668 -93
6
Client Project No.: 428
Date: 8/1 912 01 1
Request No.: 8 & FINAL
Project
Summary
1
Original Contract Amount
$2,047,914.03
2
Contract Changes - Addition
$117,918.78
3
Contract Changes - Deduction
$0.00
4
Revised Contract Amount
$2,165,832.81
5
Value Completed to Date
$2,024,4 88.08
6
Material on Hand
$0.00
7
Amount Earned
$2,024,488.08
8
Less Retainage
$0.00
9
Subtotal
$2,024,488.08
10 r12
Less Amount Paid Previously
$2,000,098.27
Liquidated Damages
$0.00
AMOUNT DUE THIS PAY VOUCHER NO. 8 & FINAL
$24,389.81
I HEREBY CERTIFY THAT A FINAL EXAMINATION HAS BEEN MADE OF THE ABOVE NOTED CONTRACT, THAT THE
CONTRACT HAS BEEN COMPLETED, THAT THE ENTIRE AMOUNT OF WORK SHOWN IN THE FINAL VOUCHER HAS BEEN
PERFORMED AND THE TOTAL VALUE OF THE WORK PERFORMED IN ACCORDANCE WITH, AND PURSUANT TO, THE
TERMS OF THE CONTRACT IS AS SHOWN IN THIS FINAL VOUCHER.
Recommended for Approval by: Construction Observer:
WSB & Associates, Inc.
C
Approved by Contractor: Approved by Owner:
McNamara Contracting, Inc. City of Rosemount
I
a
Specified Contract Completion Date: Date:
11/1/2010
Comment:
Page 1 of 7
i ANDREWS ) I \ ! "N AD A cT \
\\�
�:
J
ZZ
2 W
\ z
C;0
\ r//
131S ST w
NON FA J`� Y WIDENI`'
LANE IMPROVEMENTS
z >
H
6
C"
I
G
IY15T - ST ct w
DAVEN p � . ..
Ia}RD 5T w �
^ -- - I43RD S1
I
0 550 1100
LEGEND
OVERLAY IMPROVEMENTS
REHABILITATION IMPROVEMENTS
SIDEWALK/TRAIL IMPROVEMENTS
- �"
Minneapolis, MN 55416
SB 701 Xenia Avenue South, SuRe 300
W www.wsbang.com
2010 STREET IMPROVEMENT
PROJECT
PROPOSED IMPROVEMENTS
WSB Project No 01668-93 December 15 200
Figure Number
*ROSEMOUNT
1
MINNESOTA
\ INFftI�STRUCiURE ENGINEERING PLANNING CONSTRUCTIGN
/
K ^,01668 93'�Cad,F:hibns \PIG_1 Counnl.d vg, Layoutl