HomeMy WebLinkAbout6.e. Receive Feasibility Report/Order Project/Authorize Plans and Specifications – Greystone 1st Street and Utility Improvements, City Project 439 ROSEMOLINT EXECUTIVE SUMMARY CITY COUNCIL City Council Meeting: May 15, 2012 AGENDA ITEM: Receive Feasibility Report / Order Project / Authorize Plans and Specifications — AGENDA SECTION: Greystone 1 Street and Utility Consent Improvements, City Project 439 PREPARED BY: Andrew J. Brotzler, PE, Director of P blic AGENDA NO. �Q.�. Works/City Engineer ATTACHMENTS: Feasibility Report; Resolution, Map APPROVED BY: � RECOMMENDED ACTION: Motion to Adopt a Resolution Receiving the Feasibility Report, Ordering the Project, and Authorizing the Plans and Specifications for Greystone 1 Street and Utility Improvements, City Project 439. BACKGROUND: On April 3, 2012 the Rosemount Cin� Council authorized the preparation of an Engineering Feasibility Report for the Gre�-stone 1" Street and Utilit�� Impro�-ements, Cit�� Project 439. 1-� copy� of the Feasibilit�- Report is attached. This report addresses the construction of public streets and utilin- unpro�-ements necessary for the deaelopment of Greystone 1" residential de��elopment. The total estimated project cost for Gxe�-stone 1" is 51,129,198, �vhich includes a 10% contingency and 30% indirect costs. Of this amount, �1,040,G43 �vill be funded by the de�-eloper, The Ry�land Group, Inc. The remaining estimated costs associated with trunk utility over-sizing �vill be funded with City Core funds totaling �88,555 (�21,485 from the sanitary core; �67,070 from the storm core). SUMMARY: Staff recommends Council adoption of a resolution recei�-ing the feasibilin• report, ordering the project, and authorizing the preparation of plans and specifications for Gre�•stone 1" Street and LTtilin� ImpYOVements, City Project 439. G:A1?NGPRO�\43J\2012U515 CC Rccci� c I�R-Ord Pq-Authorizc Yl-Spcc.docs � � , ., , z. . .w.„� 4 . , - y r^ .°' .a" � / I ,.;� .. }' s "^ ��:'��"„� i + �."'+�� . <.< � ;�� �������� � ROSEMO MINNESOTA ,: ��,; - wsB — & A.+�soc(utes, /nc. FEASIBILITY REPORT GREYSTONE l ADDITION CITY PROJECT NO. 439 FOR THE CITY OF ROSEMOUNT, MINNESOTA May 15, 2012 Prepared By: WSB & Associates, Inc. 701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 763-541-4800 763-541-1700 (Fax) Fensihilit}� Report Grej�slone /" Addition Ci!}� of Rosen:aunt Projeet No. 439 WSB Project No. 1916-66 CERTIFICATION I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer �mder the laws of the State of Minnesota. Philip C. Olson, PE Date: May 15, 2012 Lic. No. 47999 Quality Control Review Completed By: ��� Joseph P. Koscielak Date: May 15, 2012 Lic. No. 49133 Fensibi[iry Report Creystone 1"Addition City of Rosenmunt Project No. 439 WSB Projecl No. /9/6-66 CERT/FICAT/ON TABLE OF CONTENTS 1. EXECUTIVE SUMMARY .....................................................................................................1 2. STREET IMPROVEMENT PROJECT ...............................................................................2 2.1 Introduction ................................................................................................................... 2 2.1.1 Authorization ....................................................................................................2 2.1.2 Scope ................................................................................................................ 2 2.1.3 Data Available ..................................................................................................2 2.2 General Background .....................................................................................................2 2.2.1 Project Location ................................................................................................2 2.3 Existing Conditions .......................................................................................................2 2.3.1 Surface ..............................................................................................................2 2.3.2 Sanitary Sewer ..................................................................................................3 2.33 Water Main .......................................................................................................3 2.3.4 Storm Sewer ..................................................................................................... 3 2.4 Proposed Improvements ................................................................................................3 2.4.1 Surface ..............................................................................................................3 2.4.2 Sanitary Sewer ..................................................................................................4 2.4.3 Water Main .......................................................................................................4 2.4.4 Storm Sewer ..................................................................................................... 4 2.4.5 Permits/Approvals ............................................................................................ 5 3. FINANCING ............................................................................................................................ 6 3.1 Opinion of Cost ............................................................................................................. 6 3.2 Funding ......................................................................................................................... 6 4. FEASIBILITY AND RECOMMENDATION ......................................................................7 Appendix A Project Location Map and Proposed Utilities Appendix B Opinion of Probable Cost Appendix C Collector Roadway Analysis Memo Appendix D Akron Avenue Trunk Sanitary Sewer Memo Fensibilit}� Report Gre}�stone 1"Addition Ciq� ofRoseittount Project No. 4J9 WSB Project No. /9/6-66 T,4BLE OFCONTENTS 1. EXECUTIVE SUMMARY The Greystone 1 S ` Addition Project, City Project No. 439, was initiated by Ryland Homes with a proposal to develop a 23 unit sinble family housing development. A second phase consisting of 31 single family homes is included on the preliminary plat. The site is located approximately 2700 feet north of 145`" Street W(County Road 42) and east of and adjacent to Akron Avenue (County Road 73) (Refer to Appendix A for a Project Location Map). As part of the improvements associated with the first phase, a minor collector roadway is proposed to extend east from Akron Avenue. This roadway is planned to be constructed to a 48- foot width which will allow adequate room for turn lanes. Trunk sanitary sewer is proposed to serve development to the north, south, and east of Greystone l Addition. An existing storm water pond will be relocated to the southeast corner of the property. It is estimated that the total costs associated with the construction of the first phase is $1,129,200. A detailed cost estimate for the project can be found in Appendix B of this report. It is proposed that the construction of Greystone 1 s` Addition be completed as outlined in this feasibility report. This project is feasible, necessary, and cost-effective from an engineering standpoint, and should be constructed as proposed herein. Fensibilit}° Report Creystone 1"Addition Cig� of Rose�nount Projeet No. 439 W'SB Projec� No. 1916-66 Page 1 2. STREET IMPROVEMENT PROJECT 2.1 Introduction 2.1.1 Authorization On April 3, 2012, the Rosemount City Council authorized the preparation of an Engineering Feasibility Report for the Greystone l Addition Improvements. This project has been designated as City Project No. 439. 21.2 Scope This report addresses the construction of street and utility improvements necessary for the Greystone ls` Addition residential development. The proposed improvements include the construction of public streets with concrete curb and gutter, an 8-foot bituminous trail, and 5-foot concrete sidewalks. Utility improvements include the construction of trunk and lateral sanitary sewer, water main, and trunk and lateral storm sewer. 2.1.3 Data Availahle Information and materials used in the preparation of this report include the fo(lowing: ■ City of Rosemount Utility Plans ■ City of Rosemount Record Plans ■ City of Rosemount Topography� Maps ■ Proposed Utility and Grading Plans prepared by Pioneer Engineering, dated February 13, 2012. ■ Preliminary Plat ■ Proposed Final Plat 2.2 General Background 2.2.1 Project Location The project area is located east of Akron Avenue and north of CSAH 42. This area is currently zoned MDR (Medium Density Residential) and is located within the Metropolitan Urban Service Area (MUSA). 2.3 Existing Conditions 2.3.1 Surfuce The area consists of agricultural land with existing road access from Akron Avenue. A map showing the project area can be found in Appendix A. Fensibiliry Report Gre}�stone /" Addition Cit�� of Rosemount Project No. 439 WSB Projecl No. l916-66 Page 2 2.3.2 Sanitary Sewer Trunk sanitary sewer is located along Akron Avenue. An existing 8-inch sanitary sewer stub is available to serve the Greystone l Addition. 2.3.3 Water Main The existing trunk water main is located along Akron Avenue. An existing 8-inch ductile iron pipe water main is stub is available to serve the Greystone ] Addition. 2.3.4 Storm Sewer The existing trunk storm sewer from Akron Avenue discharges at the northwest corner of the first phase of Greystone 1 St Addition. A stormwater pond is currently at this location. 2.4 Proposed Improvements 2.4.1 Surfuce A 48-foot-wide minor collector roadway connection to Akron Avenue is proposed as part of the Greystone 1 St Addition improvements. 32-foot-wide local streets will comprise the remaining roadways within Greystone 1 St Addition. A map showing the proposed roadways can be found in Appendix A. As part of the future roadway network east of Akron Avenue, the alignments and traffic volumes of the major and minor collector roadways were analyzed. This analysis can be found in the Collector Roudwuy Analysis memo attached in Appendix C. Intersection configurations at Akron Avenue and the intersection east of Akron Avenue will be as follows: Intersection at Akron Avenue � Westbound o Right-thru lane ■ 13 feet wide o Left turn lane ■ 13 feet wide ■ 220 feet turn lane length • Eastbound 0 14 feet wide Feasibilit}� Report Gre}�stone 1"Addition Cin� of Rosemount Projee� No. 439 N'SB Projecl No. !9/6-66 Pa�e 3 Intersection east of Akron Avenue • West leg o Eastbound ■ 13 foot wide left turn lane ■ 13 foot wide right turn lane o Westbound thru lane ■ 14 feet wide � South leg o Northbound ■ 12 feet wide left turn lane ■ 12 feet wide thru lane o Southbound ■ 12 feet wide thru lane • North leg o Northbound ■ 12 feet wide thru lane o Southbound ■ 12 feet wide right-thru lane The north leg of the intersection east of Akron Avenue is proposed to taper from a 36-foot-wide roadway to a 32-foot-wide roadway. A striped median on the north leg of the intersection is required to align the intersection north and south of the minor collector. 2.4.2 Sanitary Sewer A 10-inch sanitary sewer line will be connected to an existing 8-inch sanitary sewer stub from Akron Avenue. A memo outlining the sanitary sewer connection at Akron Avenue has been attached in Appendix D. This line will be extended north through the first phase of Greystone to provide capacity for future developments north and east of Greystone 1 St Addition. The capacity of the mainline sanitary sewer is designed to handle approximately 26 acres of inedium density residential development north of Greystone as guided with the City's 2030 Comprehensive Plan. In addition, the sanitary sewer has the capacity to serve the equivalent of approximately 1 10 additional single family homes east of the medium density residential land. A determination of the exact sewershed limits will need to be analyzed and approved with individual grading plans. 2.4.3 Wuter Main An 8-inch ductile iron pipe water main will be connected to the existing ductile iron stub from Akron Avenue. The water main will be routed along all streets throughout Greystone l Addition. Regiona(ly, a future 12-inch trunk water main is required to be installed south of the railroad tracks to loop the existing trunk water main. This connection will be required with the development of the property east of Akron Avenue and north of Greystone. Fensibiliry Report Grepslone 1"Addition Ciry ofRosemounl Project No. 439 k S8 Project No. 1916-66 Page � 2.4.4 Storm Sewer The existing stocmwater pond in the nortllwest corner of Greystone I S ` Addition is proposed to be relocated to the southeast corner of the development. The new stormwater pond at this location will handle the existing flow from Akron Avenue as well as runoff from the Greystone Additions. Trunk storm sewer will convey the 100-year runoff from Akron Avenue and will allow for a future connection to the City's trunk outlet. Easement for the existing stormwater pond was purchased from the property owner for the construction of Akron Avenue. The developer is responsible for the costs associated with the pond relocation. The City will be responsible for the equivalent cost of a trunk storm sewer system extended straight east. The developer will be responsible for the additional cost to extend the pipe to the southeast corner of the property and increased pipe size due to runoff from the development. 2.4.5 Permits/f1 pprovals The anticipated permits and approvais that will be required for this project and the respective agencies are listed below: • Minnesota Department of Health ................................................... Watermain • Minnesota Pollution Control Agency .........................................Sanitary Sewer • Metropolitan Council of Environmental Services ..........................Sanitary Sewer • Great River Energy......... .............................Permit/Letter ........................... • Xcel Energy.......... .............................Permit/Letter ................................... • Dakota County ............. .................Work Within Right-of-Way ...................... • Minnesota Pollution Control Agency......... National Pollution Discharge Elimination Systems (NPDES) General Stormwater Permit for Construction Activity (MNR 100001) Feasibiliry Repon Greystone 1"Addilion Cin� of Rosemount Project No. 439 N�SB Project No. 7916-66 Page 5 3. FINANCING 3.1 Opinion of Cost A detailed opinion of cost can be found in Apnendi.r B of this report. A summary of the opinion of cost incorporates estimated 2012 construction costs and includes a] 0% contingency and 30% for all related indirect costs (legal, administrative, engineering, and financing items). Trunk oversizing costs associated with increasing the sanitary sewer from 8-inch diameter to a 10-inch diameter and costs associated with extending trunk storm sewer to the east property line are included. O inion of Probable Cost Total Surface Improvements $472,800 Sanitary Sewer Improvements $259,400 Watermain Im rovements $172,600 Storm Sewer Improvements $224,400 Total $1,129,200 3.2 Funding Improvements associated with Greystone l Addition will be funded with developer funds, storm core funds, and water core funds. The developer has requested that the improvements and water and sewer area charges be funded through assessments to the benefiting lots. This will require a petition and waiver agreement with the City. Pro osed Fundin Developer Storm Core Sanitary Total Core Surface Improvements $472,800 $0 $0 $472,800 Sanitary Sewer Improvements $237,900 $0 $21,500 $259,400 Watermain Im rovements $172,600 $0 $0 $172,600 Storm Sewer Improvements $157,300 $67,100 $0 $224,400 Total $1,040,600 $67,100 $21,500 $1,129,200 Fensibilil}� Report Gre}'stone 1"Addition City of Rosentount Project No. 439 W SB Project No. 19/6-66 P:�ge 6 4. FEASIBILITY AND RECOMMENDATION The total estimated cost for the Greystone 1 S ` Addition improvements is �1,129,200. Proposed funding for this project is primarily from the developer, Ryland Homes, with some trunk utility funding provided by the City. The project is feasible, necessary, and cost-effective from an engineering standpoint. It is our recommendation that the improvements be implemented as outlined in this report. Fensibiliq� Report Grej�stone !" Addition Ci1y� of Rosemounr Projecl No. 439 WSB Project No. 1916-66 Page 7 APPENDIX A Project Location Map and Proposed Utilities Fensibilit}� Report Gre}�stone 1"Addition Cin• of Rosemount Project No. 439 WSB Project No. /9/6-66 APPENDIX A Document Path: K.\01916-660\GIS\Maps\ProposedUtilities.mxd Date Saved�. 4/12I2012 10�A4�A1 AM F �, i , `I � � � �+ � ' � ' � � � . � 3 � , � � Q ,� �* . ('N ., � � � �' 1 �� : ' � . / L L � � - N ` 7 ""�t 4 / C � � � (0 y g � �1�� �] � C (n O L 7 � .E. �� k 4 y!� �;-E� ,�r W a t � . '���3� �," y 'F . � �z � t �� � � � E a � � � _ _ - q . . � o m o � � � r �", �. . U in � v� C� LL O L.L � '` $ � , j. o � � � � ';�; ;. � � _ .: -�- v � '��� �r ;.:, � ,� �'�: ,� �' o `� , �. K _ � � ��� � � � � y �; �: � �, � � � g , o a� a� � � '.t � , . r;. � n � � � �, � �.: j � �' � � -- � o � �, �o �o > � o , � ,S'�.. , ¢, . � 3 c c � � � N � 1 � �� t -- .. . < K, � v> cn <n c� x � '`� ,y �y -� n . ` ; � • 1 � ? � I o � ., ^� :.i�� . .i : �� � , . ;3,+ t't. . , J � � �� �', ��� . "� t �' � � 0 ,.� .'; . � � � _. ' .�sYJ.- � �— , •� � � t: " � �: = 1. _ 4 ��� y �� t 3� A � f] J � � � } ` � Z �: o �n � ��'�` i= a � � - � << , �' Q a o . N °� a�i > - < � Q- N � - � � o �`` ��� �:4 , � o , � rt. A .7 N O O ♦ L � � � C� p U '�' J�.�a..x r-. � "��,_ � lt - _ ��"� � ,��' �-± �; �, ., �. � `�i ; ,�, . o . ' ` � L �� r� , '—___"_"__"—"_'__"� at..v v .. ...f , . / I � ..i.� tl �� a� � � �� I r—. � „. r. . , ' , , ' � . _ . � ; � _. � r ' � ;— �j . < . �� � � ' - � - ""^ , �� . � � � �, '� 7 �A /� � �T►����� � — � -- i i 'Y � � — \� 1r � � I j ��'� � r . , ' .. � � � ; ,, a � � : ` ' . � �--, . � I � Q f � I � .� , . � � � I � 4$ , _ , � � � � Z i ,.- ' d � � ; i ��: . . � ... .. ,,..,... �" . � Z " ... _ .. . :. . , ... . . . . � "S.� :� , �.. I � . . . . . . . . : �. ... � _ , O � 8At/ UOJ�t/ � I � ! ' I __ ... _— _ , � , : _ _ , ,. , c �`___ � �� - � o `° �' W i � ' � i � J � U I O d � a � L� '—_'�'`; _"— � _'J � -�----- � APPENDIX B Opinion of Probable Cost Fe�sibilit�• Reporl Gre��stone 1" Addition City� of Rosenrount Project No. 439 WSB Projec� No. /916-66 APPEND/X B Opinion of Probable Cost lI�SB Projecl: Greystone Ist Addition Design B�: JPK Project Loccrtio�r: City� of Rosetnount Checkc��l Bi�: KAK Cih� Project ;�'o.: 439 61�SB Pro�ect �"o: 1916-66 Dcue: 5/7/2012 MN/DOT Estimated Itetn Estimated �stimated "Total No. SpeciYica[ion Description Unit Total Unit Price Cost No. Quantih A. SURFACE IMPROVEMENTS 1 2021.501 MOBILIZATION (5% MAXIMUM) LUMP SUM t $15,000.00 $15,000.00 2 2104.501 REMOVE CURB AND GUTTER LIN FT 30 $4.00 $120.00 3 2104.503 REMOVE CONCRETE WALK SQ FT 200 $1.00 $200.00 4 2104.505 REMOVE BITUMINOUS PAVEMENT SQ YD 25 $2 00 $50.00 5 2104 511 SAWING CONCRETE PAVEMENT (FULL DEPTH) LIN FT 10 $4.50 $45.00 6 2104.513 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 50 $3.50 $175.00 7 2105.501 COMMON EXCAVATION CU YD 100 $4.00 $400.00 8 2105.522 SELECT GRANULAR BORROW (CV) CU YD 6500 $5.00 $32,500.00 9 2112.501 SUBGRADE PREPARATION ROAD STA 18.5 $120.00 $2,220.00 10 2211.501 AGGREGATE BASE CLASS 5 TON 3400 $10.00 $34,000.00 11 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALLON 450 $3.50 $1,575.00 12 2360.501 TYPE SP 12.5 WEARING COURSE MIXTURE (2,C) TON 1200 $57.00 $68,400.00 13 2360.502 TYPE SP 12.5 NON WEARING COURSE MIXTURE (2,C) TON 1050 $55.00 $57,750.00 14 2521.501 6" CONCRETE WALK SQ FT 7600 $4.00 $30,400.00 15 2521.511 2" BITUMINOUS WALK SQ FT 4000 $2.00 $8,000.00 16 2531.501 CONCRETE CURB & GUTTER DESIGN B618 LIN FT 900 $11.00 $9,900.00 17 2531.501 CONCRETE CURB 8 GUTTER DESIGN MODIFIED S LIN FT 2850 $11.00 $31,350.00 18 2531.618 TRUNCATED DOMES SQ FT 56 $40.00 $2,240.00 19 2535.501 BITUMINOUS CURB LIN FT 250 $6.50 $1,625.00 20 2545.523 4" NON-METALLIC CONDUIT LIN FT 300 $12.00 $3,600.00 21 2554.602 PERMANENT BARRICADES (TYPE III) EACH 6 $300.00 31,800.00 22 2563.601 TRAFFIC CONTROL LUMP SUM 1 $2,000.00 $2,000.00 23 2564.531 SIGN PANELS TYPE C SQ FT 20 $30.00 $600.00 24 2564.602 F&I SIGN PANEL TYPE D EACH 3 $300.00 $900.00 25 2573.502 SILT FENCE, TYPE PREASSEMBLED LIN FT 1000 $1.50 $1,500.00 26 2573.530 INLET PROTECTION EACH 21 $200.00 $4,200.00 ?7 2573.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 1 $375.00 $375.00 28 2575.502 SEED MIXTURE 260 POUND 200 $5.00 $1,000.00 29 2575.505 SODDING TYPE LAWN QNCL TOPSOIL & FERT) SQ YD 3200 $4.00 $12,800.00 30 2575.523 EROSION CONTROL BLANKETS CATEGORY 4 SQ YD 500 $1.50 $750.00 31 2575.605 SEEDING (INCL TOPSOIL & FERT) ACRE 2.5 $1,500.00 $3,750.00 3? 2582.501 PAVEMENT MESSAGE (LEFT ARROW) EPDXY EACH 2 $140.00 $280.00 33 2582.501 PAVEMENT MESSAGE (RIGHT ARROW) EPDXY EACH 1 $140.00 $140.00 3a 2582.501 PAVEMENT MESSAGE (RIGHT-THRU ARROW) EPDXY EACH 1 $175.00 $175.00 35 2582.502 4" SOLID LINE WHITE - EPDXY LIN FT 1,200 $0.40 $480.00 36 2582.502 4" DOUBLE SOLID LINE YELLOW - EPDXY LIN FT 450 $0.70 $315.00 Schedule .1 Subtotal - Surface Impro��ements S330,620A0 + 10%Contingencies $33,060.00 Subtotal S3G3,680.00 + 30% Indirect Cost $109.100.00 Schcdule A Total - Surface Impro��ements ��72,800.00 1 of 3 K:\01916-660Wdmin\Feasibility\Opinion of Probable Cost 3-7-12 Opinion of Probable Cost I!'SB Projecl: Gre��stone I st Addition Des�gn B,i': JPIt Pr�ojec� Locatron: City� of Rosemount ('hecked Bi�: KAK Citt' Project ,A"o.: d39 [VS6 Pi�o �ect ,No: I 916-66 Dn�e: 5/7/2012 Item MN/DOT Estimated Estimated Estimated Total No. Specification Descriptiun Unit l'otal Unit Price Cost No. Quantit� B. SANITARY SEWER IMPROVEMENTS 37 2451.602 GRANULAR FOUNDATION AND/OR BEDDING TON 10 $10.00 $100.00 38 2503.602 CONNECT TO EXISTING SANITARY SEWER EACH 1 $1,000.00 $1,000.00 39 2503.602 8"X4" PVC WYE EACH 10 $125.00 $1,250.00 40 2503.602 10"X4" PVC WYE EACH 13 $150.00 $1,950.00 41 2503.603 4" PVC PIPE SEWER - SDR 26 LIN FT 1050 $15.00 $15,750.00 42 2503.603 8" PVC PIPE SEWER - SDR 26 LIN FT 460 $35.00 $16,100.00 43 2503.603 10" PVC PIPE SEWER - SDR 26 LIN FT 1050 $45.00 $47,250.00 44 2503.603 10" PVC PIPE SEWER DR 18 LIN FT 420 $100.00 $42,000.00 45 2506.603 CONST 48" DIA SAN SEWER MANHOLE LIN FT 245 $175.00 $42,875.00 46 2503.603 TELEVISE SANITARY SEWER LIN FT 1930 $3.00 $5,790.00 47 2506.516 CASTING ASSEMBLY EACH 14 $525.00 $7,350.00 Schedule B Subtotal - Sanitar� Se��er Impro�emcnts S181,�13.00 + 10% Contingcncies $18,140.00 Subtotal 5199,SS3.00 + 30% Indirect Cost $J9,870.00 Schedule I3 Total - Sanitar�� Se��er Impro�emcnts 52�9,�J00.00 C. WATER MAIN IMPROVEMENTS 48 2451.602 GRANULAR FOUNDATION AND/OR BEDDING TON 10 $10.00 $100.00 49 2504.602 HYDRANT ASSEMBLY EACH 6 $2,500.00 $15,000.00 50 2504.602 1" CORPORATION STOP EACH 23 $100.00 $2,300.00 51 2504.602 1" CURB STOP 8 BOX EACH 23 $200.00 $4,600.00 52 2504.602 CONNECT TO EXISTING WATER MAIN EACH 1 3500.00 $500.00 53 2504.602 6" GATE VALVE AND BOX EACH 5 $1,000.00 $5,000.00 54 2504.602 8" GATE VALVE AND BOX EACH 7 $1,250.00 $8,750.00 55 2504.603 1" TYPE K COPPER PIPE LIN FT 950 $20.00 $19,000.00 56 2504.603 6" WATER MAIN-DUCT IRON CL 52 LIN FT 100 $35.00 $3,500.00 57 2504.603 8" WATER MAIN-DUCT IRON CL 52 LIN FT 1500 $37.00 $55,500.00 58 2504.604 4" POLYSTYRENE INSULATION SQ YD 20 $25 00 $500.00 59 2504.608 DUCTILE IRON FITTINGS POUND 1700 83 50 $5,950.00 Schcdulc C Subtotal - 1L'atcr 11ain Improvements S120,700.00 + 10% Contingencies $12.070.00 Subtotal S132,770A0 + 30% Indirect Cost $39.830.00 Schedule C "1'otal - ��ater �fain Impro�ements 5172,G00.00 2 of 3 K:\01916-660�Admin\Feasibility\Opinion of Probable Cost 3-7-12 Opinion of Probable Cost 1l�SB Project: Grey�stone 1 st Addition Desig�t 6v: JPK Projecl Locatiora: City of Rosemount Checked Bv: KAK Cilt' Project .A�o.: d39 [G:SB Project J"o: 1916-66 Dn�e: >/7/2012 Item MN/DOT Estimated Estim�ted Estimated Total No. Specif�ication Description Unit Total Unit Price Cost No. Quantih' D. STORM SEWER IMPROVEMENTS 60 2104.501 REMOVE STORM SEWER PIPE LIN FT 40 $6.00 $240.00 61 2104.507 REMOVE RIPRAP CU YD 30 $5.00 $150.00 62 2501.515 15" RC PIPE APRON WITH TRASH GUARD EACH 1 $500.00 $500.00 63 2501.515 18" RC PIPE APRON WITH TRASH GUARD EACH 6 $650.00 $3,900.00 64 2501.602 42" RC PIPE APRON W/PILING EACH 1 $3,000.00 $3,000.00 65 2501.602 TRASH GUARD FOR 42" PIPE APRON EACH 1 $1,200.00 $1,200.00 66 2502.541 4" PERF PE PIPE DRAIN LIN FT 200 $6.00 $1,200.00 67 2503.541 15" RC PIPE SEWER DESIGN 3006 CLASS V LIN FT 890 $30.00 $26,700.00 68 2503.541 18" RC PIPE SEWER DESIGN 3006 CLASS III LIN FT 140 $35.00 $4,900.00 69 2503.541 27" RC PIPE SEWER DESIGN 3006 CLASS III LIN FT 410 $45.00 $18,450.00 70 2503.541 30" RC PIPE SEWER DESIGN 3006 CLASS III LIN FT 810 $50.00 $40,500.00 71 2503.541 42" RC PIPE SEWER DESIGN 3006 CLASS III LIN FT 50 $60.00 $3,000.00 72 2506.501 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 LIN FT 150 $220.00 $33,000.00 73 2506.502 CONST DRAINAGE STRUCTURE DESIGN G EACH 1 $1,000.00 $1,000.00 74 2506.502 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1 EACH 7 $1,250.00 $8,750.00 75 2506.516 CASTING ASSEMBLY EACH 15 $525.00 $7,875.00 76 2506.602 CONNECT INTO EXISTING STORM SEWER EACH 1 $500.00 $500.00 77 2511.501 RANDOM RIPRAP CLASS IV CU YD 20 $100.00 $2,000.00 78 2511.515 GEOTEXTILE FILTER FABRIC TYPE IV SQ YD 20 $3.00 $60.00 Schedule D Subtotal - Storm Sewer Impro�ements 51i6,92S.00 + 10%Contingencies $15.690.00 Subtotal S172,615.00 + 30% I�direct Cost $51.'780.00 Schedulc D 7 otal - Storm Se��cr Impro�ements S224,�00.00 Grand Total Gre�stone:�ddition S1,129,200.00 3 of 3 K:\01916-660Wdmin\Feasibility\Opinion of Probable Cost 3-7-12 Opinion of Probable Cost AS/3Projeci: Greystone Desi�nl3t�: JPK Projecl l ocalion: Cit�� of Rosemount Checked L3r: ItiAIt Ci�r Project ;A�o.: {i'SB Project ��"o: Dn�e: �/7/ZO l 2 Item MN/DOT F.stimated Estimated Estimared Total Specitication Description Unit Total � . No. Unit f nce Cost No. Quantity SANITARY SEWER IMPROVEMENTS (8" Cost) 1 2451.602 GRANULAR FOUNDATION AND/OR BEDDING TON 10 $10.00 $100.00 2 2503.602 CONNECT TO EXISTING SANITARY SEWER EACH 1 $1,000.00 $1,000.00 3 2503.602 8"X4" PVC WYE EACH 23 $125.00 $2,875.00 4 2503.603 4" PVC PIPE SEWER - SDR 26 LIN FT 1050 $15.00 $15,750.00 5 2503.603 8" PVC PIPE SEWER - SDR 26 LIN FT 1510 $35.00 $52,850.00 6 2503.603 S" PVC PIPE SEWER DR 18 LIN FT 420 $90.00 $37,800.00 7 2506.603 CONST 48" DIA SAN SEWER MANHOLE LIN FT 245 $175.00 $42,875.00 8 2503.603 TELEVISE SANITARY SEWER LIN FT 1930 $3.00 $5,790.00 9 2506.516 CASTING ASSEMBLY EACH 14 $525.00 $7,350.00 Subtotal - Sanitary Se��er Impro�ements 5166,388.00 + 10% Contingencies $16.640.00 Subtotal S183,028.00 + 30% Indirect Cost $�4,910.00 Tutal - Sanitarv Se���er Impro��ements 5237,900.00 SANITARY SEWER IMPROVEMENTS (Oversized Cost) 1 2451.602 GRANULAR FOUNDATION AND/OR BEDDING TON 10 $10.00 $100.00 2 2503.602 CONNECT TO EXISTING SANITARY SEWER EACH 1 $1,000.00 $1,000.00 3 2503.602 8"X4" PVC WYE EACH 11 $125.00 $1,375.00 4 2503.602 10"X4" PVC WYE EACH 13 $150.00 $1,950.00 5 2503.603 4" PVC PIPE SEWER - SDR 26 LIN FT 1050 $15.00 $15,750.00 6 2503.603 8" PVC PIPE SEWER - SDR 26 LIN FT 460 $35.00 $16,100.00 7 2503.603 10" PVC PIPE SEWER - SDR 26 LIN FT 1050 $45.00 $47,250.00 8 2503.603 10" PVC PIPE SEWER DR 18 LIN FT 420 $100.00 $42,000.00 9 2506.603 CONST 48" DIA SAN SEWER MANHOLE LIN FT 245 $175.00 $42,875.00 10 2503.603 TELEVISE SANITARY SEWER LIN FT 1930 $3.00 $5,790.00 11 2506.516 CASTING ASSEMBLY EACH 14 $525.00 $7,350.00 Subtotal - Sanitarv Sewer Impru�ements S181,538.00 + 10% Contingencies $18. l �0.00 Subtotal S199,688.00 + 30 %� Indirect Cost $�9910.00 Total - Sanitar� Sc�cer Impro�ements S2�9,GOOAO SA\IT:U21 SI�;��'ER O�'ERSI"I.I\G COST S21.700.00 1 of 2 K:101916-660\Quantity\Preliminary\Opinion of Probable Cost 5-7-12.x1s Opinion of Probable Cost 11�'.S13 Project Grcystone Dc�sign Bi�: JPK Projecl l ocution: City of�Rosemount Checkec173r: 1i�11k ('rt}� Project [�"o.: 11 SB Project .�"o: Dute: �/7/2012 MN/DOT Gstimated Item I{stimated Estimated Toinl Specitication Description Unit Total No. Unit Price Cost No. Quanti[} STORM SEWER IMPROVEMENTS (100-year Overflow Extension) 1 2501.515 21" RC PIPE APRON WITH TRASH GUARD EACH 1 $750.00 $750.00 2 2503.541 21" RC PIPE SEWER DESIGN 3006 CLASS III LIN FT 950 $40.00 $38,000.00 3 2506.501 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 LIN FT 30 $220.00 36,600.00 4 2506.516 CASTING ASSEMBLY EACH 2 $525.00 $1,050.00 5 2506.602 CONNECT INTO EXISTING STORM SEWER EACH 1 $500.00 $500.00 Subtotal - Storm Sewer Impro� ements Sa6,900.00 + 10% Contingencies $4,690.00 Subtotal S�1,S90.00 + 30% Indirect Cost $1 �.480.00 Total - Storm Sewer [mprovements (100-�ear O�erFlow Extension) S67,100.00 2 of 2 K:\01916-660\Quantity\Preliminary\Opinion of Probable Cost 5-7-12.x1s APPENDIX C Collector Roadway Analysis Memo Fensibifin• Report Gre��stone 1"Adrlition Ciry of /tosemount Project No. 439 W'SBProjectNo. /9l6-66 APPENDLXC - Engineering ■ Planning ■ Environmentai ■ Construction 701 Xenia Avenue South W [�Q Suite 300 J� Minneapolis, MN 55416 - Tel: 763-541-4800 ,� i,.��, ;,,;��� �,:� Fax: 763-541-1700 Memorandum To: Andy Brotzler, P.E. Director of Public Works/ City Engineer City of Rosemount From: Charles Rickart, PE, PTOE Transportation Engineer Date: March 28, 2012 Re: Collector Road Analysis Akron Avenue to Blaine Avenue B��CI�GROUND In 2007 the Ciry of Rosemount completed an �1lternative L�rban rlrea�vide Re��ie�v (r1L' �R) that analyzed the de�-elopment of land in Rosemount east of do�vnto�vn. The land reaie�ved extends from approximatel� 2600 feet �vest of �kron �1�-enue to approximately 5200 feet east of r�kron Avenue. This land is bounded on the north by I�onaire Path and on the south by 145`� Street. The AUAR details the location of future minor and major collector road�vays throughout this corridor. The projected traffic volumes of the major collector road�va�-s �vere also determined �vith the �U�R. Traffic volumes for the minor collector road�va��s �vere not determined. AI�RON 1-�VENLTE CORRIDOR In the last fe�v 5�ears, development along the I�kron ��venue corridor has started taking place. Development west of Akron Avenue began in 2011. I Iousing demand is no�v proposed east of Akron Avcnue. r� �vell planned net�vork requires determining the traffic � olumes of the minor collector road�va}�s. This information along with a closer re�-ie�v of the land use helps de�relop a comprehensi�-e road�va�� plan �vith intersection needs plan to assist �vith right-of-�va�• dedication. The attached map shows the recommended road�vay alignments foY the majoY and minor collector road�vays bounded by the Akron Avenue, Blaine l�venue, Bonaire Path, and CS �H 42. The road�va�- alignments are similar to the proposed alignments in the 2030 Comprehensi�-e Plan �vith the follo�ving eYCeptions: Minneapolis ■ St. Cloud Equal Opportunity Employer � 1�linor collector road�va�� eYtending north from l�udrey l�venue has gradual cun�e that shifts the Yoad�vay alignment appYOximately 700 feet west of rludrey rlvenue a b�� the rime the road reaches Bonaire Path. • Alinor east-�vest collector approtimatel}� ?600 feet north of 1��`� Street is planned for construction �vith a tee intersecuon east oElll;ron ��-enue. The tee intersection �vould be located approximately 500 feet east of r�kron rl�renue. The alignment changes of the minor collector road�va��s �vere made for the follo�ving reasons: • Better align �vith anticipated land use of the current propern- o�vners along this corridor. Due to Flint Hills pro�imit�� to the area and their current land o�vnership it is likel�- that the minor collector road�va`- eYtending north from �udrey rlvenue �vill be constructed closer to the alignment shown on the attached map. • East-west collector 2600 feet north of 145`" Street was modified to a tee intersection due to physical constraints. There is an existing transmission line running east-�vest just south of the collector road�vay. The spacing of the transmission poles �vill not allo�v for the collector roadway alignment to cur�re bet�veen them �vhile allo�ving an access road to the north and adequate turn lane lengths at r�kron r�venue. The anticipated traffic ��olumes of the minor collector, major collector, and arterial roadwa�-s ha�-e also been pro�-ided on the attached map. These traffic �-olumes represent full de�-elopment of land in the area �vith consideration to the land use of the land o�vned by Flint Hills. A minimum right-of-�va�� of �vidth of 80 feet is recommended for all minor collector road�va��s and 100 feet for all major collector road�va}�s. �dditional right-of-�va�- �vidth ma�� be needed at intersections to allo�v for turn lane construction. �-�ll intersecuons �vill require a minimum of t�vo lanes of approach and one lane of departure for traffic. The intersection of Connemara Trail and Akron rlvenue and the intersection of Connemara Trail and Blaine r�venue will require three lanes of approach and one lane of departure. The right-of-�va�- �vidth needed at these locations �vill likely be 120 feet. r1s land de�-elops around future intersections, analysis �vill need to be completed to define turn lane lengths and �vidths along �vith subsequent right-of-�va�� �vidths needed at these locations. cc: Phil Olson, Assistant City Fngineer Collector Roadway Analysis Page 2 Akron Avenue to Blaine Avenue March 28, 2012 APPENDIX D Akron Avenue Trunk Sanitary Sewer Memo . Fensibilit}• Report Gre�•stone 1"Addition Ciq� of Rosemoun! Project No. 439 N SB Projecl No. ! 916-66 APPENDIh' D - W JB ,, �,,,,�- Engineering ■ Planning ■ Environmental ■ Construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 Memorandum To: P/iil Olson, PE Assistant City Engineer City of Rosemount From: Joe Wnrd, PE WSB & Associates, Inc. Date: Februnr�� 22, 2012 Re: Akron Avenue Trunk Sewer — 8" Lateral Sewers City of Rosemount, MN WSB Project No. 1005-00 BACKGROUND The City's Comprehensive Sanitary Sewer System Plan (CSSSP) indicates wastewater in the North Central Sewer District and west of Akron is designed to flow to the 24-inch Akron Avenue trunk sewer through 8-inch and 10-inch sewer laterals constructed at minimum grade (0.4% and 0.28%) in accordance with 10-State Standards. The attached Figure 6-2 from the CSSSP shows the later tr�ink sewers planned. As part of the Akron Avenue trunk sewer installation project, an 8-inch lateral sewer was extended 114 feet east from the future intersection of Akron Avenue and Connemara Trail at a slope of 0.35%. EVALUATION Although the 8-inch sewer lateral was not constructed in accordance with the CSSSP, an 8-inch sewer can provide the same capacity as a 10-inch sanitary sewer when the invert is surcharged, causing the sewer to flow under pressure. Based on our calculations, a surcharge of 0.5 feet above the top of the 8-inch sewer would result in capacity equivalent to a 10-inch sewer constructed at 0.28% which is the minimum grade of installation in accordance with 10-State Standards. The surcharge required above the top of the 8-inch sewer to provide equivalent flow of a 10-inch sewer at minimum grade may increase to 1.5 feet should sediment build up, roots intrude, or other obstructions in the sewer increase pipe roughness over time. RECOMMENDATION [t is our recommendation that sewers extended from the existing 8-inch sewer pipe stub at the intersection of Akron Avenue and Connemara Trail provide adequate slope to allow surcharging of greater than 1.5 feet above the top of the 8-inch sewer pipe. The City keeps sewers in good condition through their maintenance programs, therefore it is anticipated that the surcharge required for flow equivalent to a 10-inch sewer at minimwn grade would remain around 0.5 feet. If Il�..irrll�umu�un-rR�,r�i�io��r�i1/LI/t�.l'rNcurnll_.?l:-_Ikrnri.l����vinchcurchur,i�r.Jr,c _ - _; - __ __ ,.._.._.._.._.._.._.._.._..�. _.._.._:. _ �, � � ' � I � �� z ^( ° � N N � �i a � f �v, � � o I t� � = ' (n � i i � , y � � ^ � � � i � i � N � � � i � � :� � N � J •'` 10 \ •�� L c � / O 1 � � � o j m � I c ' � / - a �� � N �� � ` � I � ( A 1 I U ' � �"�"_ « � � t � � � n � � N w � _ � L , , � in , 1 Z — \ 1 .__. � _ I 1 c E � � .� ' C d l�i � � � aI � N N N " � I ` � �n I � U � , � � � I _ �/ � � � = cn f Ic � i a j � � � � � � i 1'w in ; �— i .��" � � � i I " � . .. -_�` � I � � � � i � � ___ .__ � c ,c ; � f _ � � � �y U o \ I U � `° m ° �\ � � � _ U � �� -------- t Q � v� �� 5 £ � J C o - N � � o � � v � � Z �� V - � ; N' ` � " LL " , = w ° a � _--�-, � � I I a 'O J � � J I I I A m —� � N N _ —� 3 L - � � N � (A � L C a�� c m A � Y � � 0 � m A a�i � m p, o � m i y h o 1 c y co � p � C y U J '� � J J � \ m z A v s ° - � q O C � IO C� U e� L y o Y � o - Z � - t/7 0 J � L S O � J � y � ' o •C � � N ,�/� ' `�..1� � � � CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2012- A RESOLUTION RECEIVING THE FEASIBILITY REPORT, ORDERING PROJECT AND AUTHORIZING THE PREPARATION OF THE PLANS AND SPECIFICATIONS FOR GREYSTONE 1 STREET AND UTILITY IMPROVEMENTS CITY PROJECT 439 WHEREAS, the CiryCouncil deemed it necessaryand expedient that the Cityof Rosemount, Minnesota, construct certain improvements, to-wit: City Project 439, Greystone 1S` Street and Utility Improvements as described in and in accordance with the feasibility report prepared by the Ciry Engineer; and WHEREAS, the City Council has been advised bythe City Engineer that said street and utility improvements are feasible and should best be made as proposed, and the CityEngineer's report to this effect has heretofore been received by Council, and filed with the City Clerk on May 15, 2012. WHEREAS, the City Council received Petition and Waiver Agreements for said project. NOW THEREFORE BE IT RESOLVED, the CityCouncil of the Cityof Rosemount accepts the feasibility report for City Project 439 and places it on file. BE IT FURTHER RESOLVED, that the CityCouncil of the Cityof Rosemount herebyorders the improvements of the Greystone 1 Street and Utility Improvements, City Project 439. BE IT FURTHER RESOLVED the Ciry Engineer is hereby ordered to prepare plans and specifications for the making of such improvements within the Greystone 1 Addition. ADOPTED this 15` dayof May, 2012. William �L Droste, Mayor ATTEST: Amy Domeier, City Clerk .: � :� , � . � _ � _ 3 , _ _ . ROSEMOLINT P I RK E NT i! AIRE P ATH W �� BONAIR PAT� � - _ `� �._ __ _ _ � _ _� - ---- � � � _ , y ' :. r� -�,, , r" ; - ; , � , ��. � � �v� ` � � �, ��� � ��� ���!t,�, . ��� - ��� P J ; � .�����i �� l!�� �` ��i � �'� ��� ���F � � ,� � C �� v S -('N .-. � M � � � �o-� H T w � �.�.---..-----, �-� �''G ! `� W �_ ���i� �/ / � �_ t �N��� �,��� ���'�,. GF �a a � ., �> Q �� "' � Z �' ���� -.�.��- ��� qe �' ' ; ��� _. _..-----.,.. � � Fr,�� ��, ��� � ��Fo y � �< ! � � ;� ° � � � Y �-� �''.--� Q ' ;� c.�, _� `���,, C�'_ �—� � Q �� . ', '1� i `Q. _ �,>.: Q ' � ,._J �-- G'�;. 142Np � ;a - ;----__�___� --� s r v� ' ' � � �\. „ o �,� , � ��•�'F E D _ - l..J� v `" , :H- :s� . � � �� �y.� � �'�� ;�ir T _` __ 145TH ST W(CSAH 42) ' o ld City Hall Park i --- _ __� _� _ __ _ _ _ _ _ __ __. _ __ ____---- -- - 0 420 840 1,680 2.520 3.360 � Feet April 2012 T:/GIS/City/Maps/Departmental Maps/Engineering/Chris/Location Map - 439