Loading...
HomeMy WebLinkAbout6.h. UMore Ball Field Project Phase 1 – Receive Bids and Award Contract ROSEN4OUNT EXECUTIVE SUMMARY CITY COUNCIL City Council Regular Meeting: June 5, 2012 AGENDA ITEM: UMore Ball Field Project Phase 1 — AGENDA SECTION: Receive Bids and Award Contract Consent PREPARED BY: Dan Schultz, Parks & Recreation Director AGENDA NO. (p .ft ATTACHMENTS: Letter of Recommendation and Bid APPROVED BY: Tabulation Summary 94) RECOMMENDED ACTION: Motion to accept the bids and award the contract to the low bidder, Friedges Contracting, for the base bid amount and alternate #1, in the amount of $719,028.10 for the UMORE Ballfield Project — Phase 1. ISSUE The City recently received bids for phase one of the UMore ball field project. There were fourteen companies on the plan holders list. The City received two bids for the project. The two bids are listed on the attached bid tabulation summary sheet. Also attached is a letter from the project manager recommending the City receive the bids and award the contract. The Parks and Recreation Commission has reviewed the bids and along with staff, recommends the City Council consider accepting the bids and awarding the contract to the low bidder, Friedges Contracting, for the base bid amount and alternate #1, which is the turf between the two fields instead of asphalt, in the amount of $719,028.10. BID. TABULATION SUMMARY PROJECT: UMore Athletic Complex Phase 1 Improvements City Project No. ENG 0138 OWNER: City of Rosemount, MN WSB PROJECT NO.: 1916 -25 BIDS OPENED: Thursday, May 10, 2012, at 10:00 a.m. Grand Total Bid Bid Bond Add. Nos. 1 -3 Base Bid (All Schedules and Contractor (5 %) Rec'd. (Schedules A -D) Alternates) 1 Friedges Contracting Co., LLC X X $714,328.10 $844,967.15 2 Max Steininger, Inc. X X $789,906.83 $866,858.71 I hereby certify that this is a true and correct tabulation of the bids as received on May 10, 2012. Morgan Dawley, PE, Project Manager Denotes corrected figure K:101916- 251AdminlConstruction AdminlSW Lot Construction11916 -25 Bid Tab Summary - 051012 YYSB itu .ft,:c�., tn«. Engineering • Planning • Environmental • Construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763 -541 -4800 Fax: 763 - 541 -1700 May 22, 2012 Honorable Mayor and City Council City of Rosemount 2875 — 145 Street West Rosemount, MN 55068 Attn: Cindy Dorniden, Public Works Secretary Re: UMore Athletic Complex Phase 1 Improvements City of Rosemount Project No. ENG 0138 WSB Project No. 1916 -25 Dear Mayor and Council Members: Bids were received for the above - referenced project on Thursday, May 10, 2012, 10:00 a.m., and were opened and read aloud. Two bids were received. The bids were checked for mathematical accuracy and tabulated. Please find enclosed the bid tabulation indicating the low bidder as Friedges Contracting Co.,L LC,La keville, Minnesota, in the amount of $719,028.10: Bidder Base Bid Alternate 1 Base Bid + Alternate Friedges Contracting Co., LLC $714,328.10 $4,700.00 $719,028.10 We recommend that the City Council consider these bids and award a contract comprised of the Base Bid + Alternate 1 to Friedges Contracting Co., LLC, based on the results of the bids received. Sincerely, WSB & Associates, Inc. Morg , n Daw , Projec 1,4 ana_ or Enclosures cc: Andy Brotzler, City of Rosemount Phil Olson, City of Rosemount Doug Ims,F riedges Contracting Co., LLC srb K:101916- 251AdminlConvinwhon AdminLSW Lot ConSnnalonlLTR RECALVDTN- hmcc- 052212 .doc