Loading...
HomeMy WebLinkAbout6.i. Receive Bids/Award Contract – Brazil Avenue Improvements Project, City Project 442 ROSEN4OUN EXECUTIVE SUMMARY CITY COUNCIL City Council Meeting: August 6, 2012 AGENDA ITEM: Receive Bids / Award Contract — Brazil AGENDA SECTION: Avenue Improvements Project, City Consent Project 442 PREPARED BY: Andrew J. Brotzler, PE, Director of ' • 'c Works / City Engineer ; ` A NO. , ATTACHMENTS: Resolutions; Bid Summary; Letter of APPROVED BY: Recommendation; Map; Doi RECOMMENDED ACTION: Motion to Adopt a Resolution Receiving Bids and Awarding Contract for the Brazil Avenue Improvements Project, City Project 442 BACKGROUND: On Friday, July 27, 2012, six bids were received for the Brazil Avenue Improvements Project and read aloud publicly. The low bidder is Northwest Asphalt, Inc. who submitted a base bid in the amount of $662,094.30, which is 6.8% lower than the engineering estimated construction cost of $710,774.50. This project will be funded with a combination of Street GIP funds and other City reserve funds. SUMMARY: Staff recommends Council adopt the resolution to receive bids and award the contract for the Brazil Avenue Improvements Project, City Project 442. G: \ENGPROJ \442 \20120806 CC Receive Bids - Award Contract.docx CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2012 — A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR THE BRAZIL AVENUE IMPROVEMENT PROJECT CITY PROJECT 442 BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1. All bids on construction of the Brazil Avenue Improvement Project are hereby received and tabulated. 2. The bid of Northwest Asphalt, Inc., in the amount of $662,094.30 for the construction of said improvements is in accordance with the plans and specifications and advertisement for bids, and is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowest bidders shall be retained until a contract has been executed. ADOPTED this 6th day of August, 2012. William H. Droste, Mayor A1"1EST: Amy Domeier, City Clerk WSB tette, 1,74 Engineering • Planning ■ Environmental • Construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763 -541 -4800 Fax: 763- 541 -1700 July 27, 2012 Honorable Mayor and City Council City of Rosemount 2875 - 145 Street West Rosemount, MN 55068 Attn: Cindy Dorniden, Public Works Secretary Re: Brazil Avenue Improvement Project City of Rosemount Project No. 442 WSB Project No. 1916 -65 Dear Mayor and Council Members: Bids were received for the above - referenced project on Friday, July 27, 2012, and were opened and read aloud. Six bids were received. The bids were checked for mathematical accuracy and tabulated. Please find enclosed the bid tabulation indicating the low bid as submitted by Northwest Asphalt, Inc., of Shakopee, Minnesota, in the amount of $662,094.30. The Engineer's Estimate was $710,774.50. We recommend that the City Council consider these bids and award a contract in the amount of $662,094.30 to Northwest Asphalt, Inc. based on the results of the bids received. Sincerely, WSB & Associates, Inc. c Phil Olson, PE Project Manager Enclosures cc: Lance Guentzel, Northwest Asphalt Andy Brotzler, City of Rosemount of PROJECT: Brazil Avenue Improvements City Project No. 442 OWNER: City of Rosemount, MN WSB PROJECT NO.: 1916 -65 BIDS OPENED: Friday, Jul 27, 2012, 1 day, y , at 10:00 a.m. Bid Bond Addendum No. 1 Contractor (5 %) Received Grand Total Bid 1 Northwest Asphalt, Inc. X X ` 2 Minnesota Dirt Works, Inc. X X $692,377.00 3 Max Steininger, Inc. X X $774,570.43 4 McNamara Contracting, In.c X X $754,582.00 5 Bituminous Roadways, Inc. X X $777,958.20 6 Frattalone Companies, Inc. X X $789,101.65 Engineer's Opinion of Probable Cost $710,774.50 I hereby certify that this is a true and correct tabulation of the bids as received on July 27, 2012. c42061Agfr Philip C. Olson, PE, Project Manager Denotes corrected figure K:101 91 6- 6 5 01AdminlConstruction Admin11916 -65 Bid Tab Summary- 072712 Brazil Avenue Improvements " ROSEMOUNT p , .:..._1 lI l BRONZE , _ISS TRL o : Brockway PKWY rn to; °' _ Park ,, ._ . tr L. 138TH ST 0 Schwarz Pond Park 1 sT , � , ,, z /. v im. i 0 >- U. 138TH ST H 139TH ST W a Q w w w "' z Q d z Li,4 = 4 4/ CO < a , _ : d 140TH S 0 • ,� C __, �, 140TH Cl < m = . 4 � fib_ . . _ Erickson Park 1 - 3 T Park N/ Q i , Central ._ Park ., c harlie's Park ~ _. ac d / BLACK BLACKBERRY 4 / , ° C v m . , 146TH ST 00 _ ,_ -° LOWER 147TH ST W, J L , } ,T : , .;: i / CT \.\.- ;0 Z / BOYSENBERRY CT iO3� Ho BOSTON . / - r 0 362.5 725 1,450 2,175 2,900 N I I Feet Path: T: \GIS \City \Maps \Departmental Maps \Engineering \Chris \Location Map - 442.mxd May 2012