HomeMy WebLinkAbout6.n. Award Abatement Bill 4 ROSEtv1OUNT EXECUTIVE SUMMARY
CITY COUNCIL
City Council Regular Meeting: August 6, 2012
AGENDA ITEM: Award Abatement Bid AGENDA SECTION:
Consent
PREPARED BY: Kim Lindquist, Community Development AGENDA NO. (0.0,
Director
ATTACHMENTS: Draft Resolution, Bid Sheets APPROVED BY:
00)_
RECOMMENDED ACTION: Approve the Resolution awarding the abatement contract to
Robinson Environmental for not more than $66,006.00.
BACKGROUND
The City acquired the St. Joseph's church property in 2004 to provide land for a new Dakota County
Library. After much discussion, the Council is working to fill the remainder of the site with a new
private senior housing facility and public senior center. To accommodate the new development on
site, the existing school structure must be removed. Hazardous material abatement is needed prior
to demolition. The hazardous material analysis and inventory of the site was conducted by Dakota
County and their contractor and was used as the basis for the quote.
DISCUSSION
In order to prepare the school portion of the building for demolition, the first step is to assess the
property for hazardous materials and then solicit bids for the clean -up. The assessment has been
completed and based upon that, the City received six bids for the required abatement. The bids
received are as follows:
Robinson Environmental, Inc. $66,006.00
Pladson Environmental, Inc. $68,745.00
Red Pine Industries Inc. $78,480.00
Lindstrom Environmental, Inc. $84,050.00
Titan Environmental, Inc. $138,582.00
Sheltertech Corporation $104,885.00
Based on the staff's review, the services needed for abatement of the hazardous materials in the
school portion of the St. Joseph's property should not exceed $66,006.00 using the estimates
provided by Robinson Environmental. Staff is recommending approval of the low bid by Robinson
Environmental for not more than $66,006.00.
Staff is currently obtaining quotes for demolition on the site. Depending upon the demolition
contractor chosen, the abatement costs may decrease. This is because some of the hazardous
material could be removed by the demolition contractor depending upon their certifications.
Additionally, approximately one -third of the cost of abatement will be covered by the
Redevelopment Investment Grant approved by the Dakota County Community Development
Agency in 2011.
RECOMMENDATION
Staff is recommending approval of the attached resolution.
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2012 -
RESOLUTION AWARDING THE HAZARDOUS MATERIAL ABATEMENT
CONTRACT TO ROBINSON ENVIRONMENTAL FOR $66,006.00
WHEREAS, the City Council for the City of Rosemount acquired the St. Joseph's church property
in 2004 to provide land for a new Dakota County Library;
WHEREAS, the school portion of the St. Joseph's church property has been slated for demolition
to allow for development of a senior housing facility;
WHEREAS, the City of Rosemount's Building Official received six quotes relating to the
abatement of hazardous material at the demolition site; and
WHEREAS, the City Council reviewed the proposals submitted by six vendors and Robinson
Environmental had the lowest quote for the project.
NOW THEREFORE BE IT RESOLVED the City Council has chosen Robinson
Environmental and awarded the contract not to exceed $66,006.00.
ADOPTED this 6th day of August, 2012.
William H. Droste, Mayor
ATTEST:
Amy Domeier, City Clerk
Red Pine Industries Inc.
1946 West County Road C
Roseville, MN 55113
Phone (651) 645-8600
Fax (651) 845-8617
August 1, 2012
Mr. Alan Strand
City of Rosemount
2875 145 Street
Rosemount MN 55068
Subject: Asbestos and Hazardous Waste Removal
Re: Old St. Josephs School
14375 South Robert Trail
Rosemount MN 55068
Dear Mr. Strand
We propose to remove and dispose of the asbestos containing materials as listed in the
inspection report by Legend Technical Services dated June 22, 2012.
Friable & Category 11 Non-friable Asbestos: $40,490.00
Pipe & fitting insulation, Ceiling tile adhesive
Linoleum flooring, Vermiculite, Light liners
Non-friable ACM: $33,290.00
Floor tile & floor tile adhesive, Waterproofing,
Window caulking, Roofing flashing & seam cement
Haz-mat materials: $ 4,700.00
Total $78,480.00
Our price includes all labor, materials, insurance, disposal, air testing and permits
required by State and Federal regulations. Price does not include electrical panels and
other material not tested.
Our price is valid for 60 days past bid date
Sincerely
Ron Trudeau
President
Acceptance: Date:
City of Rosemount
rq ty Frrt,tooy
Aug 01 12 06:43a Robinson Enviro. 7635664681 p.2
Robinson Environmental Inc.
4716 67 Ave. North, Brooklyn Center
Phone: (763) 566 -4242
Fax: (763) 566 -4681
Proposal for; City of Rosemount
ATTN; Alan Strand
Date 08 -01 -12
Thank you for having Robinson Environmental submit a proposal for the asbestos removal at St. Joseph's
School 14375 S. Robert Trail Rosemount MN. Robinson Environmental will furnish all labor, materials,
equipment, disposal and Insurance for the asbestos and Hazardous materials
Scope of Work: Removal of asbestos and hazardous items from Legend survey
Abatement Methods: Following Minnesota Department of Health and MPCA rules and regulations. Air
monitoring: will be done during project and samples will be analyzed by an accredited testing firm.
Utilities and Site Conditions: Robinson Environmental will be using water, electricity a throughout this
project. We assume all utilities will be available throughout the abatement processes.
Price to remove all asbestos: 63,382.80 Price to remove hazardous materials- 2,482.35
I am sending a price list if there are items •ou don't want abated you can deduct from total rice and there
y you P
would need to be an allowance for foundation water proofing of 3.00 A L. F.
Timothy Robinson
Aug 02 12 11:45a Robinson Enviro. 7635664681 p.2
Robinson Environmental Inc.
4716 67 Ave. N
Brooklyn Center, MN 55429 EXECUTIVE SUMMARY
14375 S. ROBERT TRAIL
ROSEMOUNT, MN
The following is the final report of the regulated hazardous materials survey conducted at the former St.
Joseph's School located at 14375 S. Robert Trail located in Rosemount, MN. The survey was performed
between June 4 and June 22, 2012 with analysis of suspect bulk asbestos materials completed on June 7,
12, and 13, 2012.
A. ASBESTOS CONTAINING MATERIALS
ASBESTOS APPROXIMATE (7 r t c C .
MATERIAL LOCATION CONTENT QUANTITY
9 "x 9" Floor Tile Throughout 3 -5% Chrysotile 4,370 Sq. Ft/ 1 i Z I Os S C
Maroon, Tan, Green
Residua! Flooring Throughout 3 -10 % Chrysotile 5,3G0Sq. Fttie 118 .so
Adhesive (Black)
Shectflooring Kitchen Area 60 -70% Chrysotile 670 Sq. Ft/ 4 0 20.06
Tan
Ceiling Tile, Wall Tile, Throughout 2 -5% Chrysotile 5,850 Sq. Ft/ Ig O la. 5
Ceiling Board Adhesive
(Brown)
Pipe Run, Fitting, Throughout 15 -80% Chrysotile 1,253 L.F.!i a 1 as, o
m
Ilanger Insulation 10% Aosite `
Window Frame Caulk Exterior Only 5% Chrysotile 1,530 L. F./ 4 i I U 0
(Grey)
Light Liners Throughout Assumed 3 Lights / rf 5, 0 0
Foundation
Waterproofing (Black) Lunchroom 10 % Chrysotile Unknown Loo L
Roof/Curb Flashing Old Roof 20% Chrysotile 640 L. F. > i .q z0.00
Roof Flashine Seam Old Roofs 10% Chrysotile Included Above
Cement
Roof /Curb Flashing New Roofs 10% Chrysotile 30 Sq. Ft. / 90,00
Seam Cement
Vermiculite insulation was observed within two walls located on the 2i level in room 16 and in /
the same outside wall below this room. This material was found to contain <1% l
tremolite/actinolite asbestos. The Minnesota Department of Health (MDH) and Minnesota c "
Pollution Control Agency (MPCA) strongly reconunends that all vermiculite be considered i
asbestos containing.
Electrical panel housings were not sampled for asbestos at this time due to the power to tho
building was still live.
For regulated material sample and material locations sue Diagram #1- #12 in the appendix.
LEGEND No. 1202400 June 22, 2012
Page 1 of 2
PROPOSAL & AGREEMENT
Proposal To: City of Rosemount
2875 145 St. W.
Rosemount, MN 55068
Attn : Mr. Alan Strand
RE : Asbestos Abatement — St. Josephs School, Rosemount, MN
Pladson Environmental, Inc. hereby submits this proposal for the work described as:
The Removal and Disposal of Asbestos Containing Materials from the Legend survey dated
June 22, 2012. All quantities and Materials are from the "Executive Summary" dated June
22,2012 — pages 1 -3.
Work is to include: All Labor, Equipment, Materials, Insurance, OSHA Air
Monitoring, & Disposal
Work NOT included: Any quantities or materials NOT listed Above/Below
Proposal Price's
Friable /Cat. II Abatement $ 30,135.00 ( must be removed
before Demo. )
Add Alternates
Non Friable Cat. I ( can stay in place for Demo )
Floor Tile and or Mastic ADD $ 21,900.00
Window Frame Caulk .ADD $ 7,650.00
Roofing ADD $ 3,500.00
Total Friable and Non Friables $ 63,185.00 **
** Excludes Non ACM Vermiculite and ACM Foundation Waterproofing
Non ACM Vermiculite in Room 16 and the outside wall below 16 ADD $ 2,720.00
Foundation Waterproofing $ 7.00 ft2 ( Excavation by others )
Regulated Waste Removal $ 2,840.00 ( Excludes Elevators and MSW )
Per Sec. D of Legend Spec.
Power and Water to be supplied by Owner.
2715 4th Street SE #20, Minneapolis, MN 55414 (612) 238 -0620
Ted Pladson Date
ACCEPTANCE OF PROPOSAL- The above quote is accepted and authorizes Pladson
Environmental, Inc. to do the work as specified above. The proposal is valid for 30 days from the
date of submittal. Payment for the above work is due upon completion.
By:
Signature & Title Date
2715 4 Street SE #20, Minneapolis, MN 55414 (612) 238 -0620
LINDSTROM 9621 Tenth Avenue North Plymouth, MN 55441
Phone (763) 545 -9740 Fax. (763) 545 -8356
ENVIRONMENTAL wwwlindstromenvironmental.com
i121'iro!2 nelital 1?einecPatiHi
PROPOSAL / CONTRACT
Lindstrom Environmental, Inc. Rosemount City Hall
( "Lindstrom's ") ( "Client ")
9621 Tenth Avenue North 2875 —145` Street West
Plymouth, Minnesota 55441 -5016 Rosemount, Minnesota 55068
Main Phone: (763) 545 -9740 Phone: 651- 322 -2036
Fax: (763) 545 -8356 Fax: 651 - 423 -5203
E -Mail: roger @lindstromenvironmental.com E- Mail: alan.strand @ci.rosemount.mn.us
Attn: Roger P. Rymer Attn: Mr. Alan Strand
Lindstrom's and Client agree as follows: Pursuant to the terms and conditions of this Contract,
Lindstrom's shall provide the labor and materials described in the "Scope of Work" set forth below, at the
following location: St. Joseph's School —14375 South Robert Trail, Rosemount, Minnesota 55068 (the
"Work Site").
"Contract" shall mean this page and the "Terms and Conditions" attached hereto or otherwise provided by
Lindstrom's to Client, along with any documents or schedules referenced either on this page or in the
Terms and Conditions. This page and the Terms and Conditions shall control over any conflicting
provisions in the documents or schedules referenced therein.
SCOPE OF WORK! CONTRACT PRICE
The "Work" to be performed under this Contract and Contract Price shall be:
Pre- demolition removal and disposal of asbestos containing building materials.
Friable and Category II Non- Friable: $39,200,00
Removal and disposal of asbestos containing building materials,
Category I Non- Friable. $42,000.00
Note: asbestos floor tile and mastic, along with ceiling tile mastic pucks can remain during demolition
Removal, disposal and recycling of hazardous materials as listed in pre- demolition survey:
$2,850.00
Foundation waterproofing (unknown quantity). Lindstrom can poly line dump trucks for the demolition
contractor. $60.00 per hour + $65.00 materials per truck
Lindstrom Environmental will invoice for completed work as it deems appropriate; invoices shall be paid
by Client on a net thirty -day basis at Lindstrom's address shown above.
Authori d Lindstrom' Signature Authorized Client Signature
AO
By: € - y: , � By:
Roger P. mer
Its: Estimator /Proje Manager Its:
Date: August 1, 2012 Date:
Toll Free: Phone (877) 545 -9740 Fax (877) 545 -8356
I
TITAN ENVIRONMENTAL INC.
� ,.� P.O. Box 668 • Forest Lake, MN 55025 -0668
Office 651.464.0948 • Fax 651.464.0982
Proposal
August 1s 2012
Mr. Alan Strand, Building Official
City of Rosemount
2875 145 Street West
Rosemount, MN 55068 -5203
RE: St. Josephs School Asbestos Abatement
Dear Ms. Hudgens:
Thank you for the opportunity to give you a quote on the above - referenced project.
We propose to remove the asbestos containing materials as discussed with you and identified in the
building survey by Legend Technical Services dated 6/22/2012. We also have proposed an alternative
price to just remove the friable materials and asbestos containing floor tile from the site. Both price
include air monitoring and disposal of miscellaneous regulated materials as identified in the survey.
Our quote to remove all identified materials $138,582.00
Our quote to remove all friable materials and tile $62,802.00
We shall furnish all labor, materials, services and equipment necessary for abatement decontamination
and waste disposal services. All work will be performed in accordance with OHSA regulations, the
Minnesota Department of Health asbestos abatement rules and all other applicable federal and state
regulations.
If you require any additional information please give me a call at 612- 369 -6351
Sincerely
ilk
Chris Freudenberg
President
ACCEPTANCE oPTRQposA
The above prices, specifications and Signature Name (Please Print)
Conditions are satisfactory and are herby
Accepted. You are hereby authorized to
The work as specified Title Date
ASBESTOS REMOVAL • ENCAPSULATION • ASSESSMENTS
SHELTERTECH"
CORPORATION
Environmental Consulting & Contracting
2605 Seppala Blvd. www.sheltertechcorp.com
St. Paul, MN 55109 FAX 651.773.8908
651.770.2405
HAZARDOUS MATERIALS REMOVAL PROPOSAL /CONTRACT #00712 -GR -T
SUBMITTED TO:
City of Rosemount
ATTN: Alan Strand
2875 145 Street West
Rosemount, MN 55068
Re: Hazardous Materials Removal/Disposal
Former St. Joseph's School Building, Rosemount, Minnesota
SHELTERTECH CORPORATION, Licensed and Insured Asbestos Abatement Contractor, proposes to
perform work at the above referenced property per the Pre - demolition Asbestos Inspection provided.
DESCRIPTION
1. Remove from the site and properly dispose or encapsulate the following hazardous materials:
• Listed asbestos materials (roofing excluded) $ 96,330.00
• Listed asbestos roofing materials $ 4,080.00
• Listed hazardous materials $ 4,475.00
• All labor, materials, insurance, required permits, air monitoring, and disposal costs included; non-
attached fixtures, furniture, equipment, associated chemicals, and elevator excluded.
• All ACBM removed from this project will be transported to an approved landfill for disposal.
• All other hazardous materials will be transported and processed per applicable regulations.
PRICE: All of the work described above to be completed in a substantial and workmanlike manner
according to standard practices for the sum of One hundred four thousand eight hundred
eighty -five and 00 /100 Dollars ($ 104,885.00)
SUBMITTED on 07/31/12 by t_ ms-- --
ACCEPTED on 20 by
• SHELTERTECH CORPORATION is licensed by the State of Minnesota to perform asbestos abatement work under license #401.
• SHELTERTECH CORPORATION is insured by Arch Specialty Insurance companies for general and pollution liability.