Loading...
HomeMy WebLinkAbout6.g. Receive Bids/Award Contract - Flint Hills Ravine Stabilization Project, City Project 0055 EXECUTIVE SUMMARY CITY COUNCIL City Council Meeting: September 18, 2012 AGENDA ITEM: Receive Bids / Award Contract - Flint Hills AGENDA SECTION: Ravine Stabilization Project, ENG 0055 Consent PREPARED BY: Andrew J. Brotzler, PE, Director of Public AGENDA NO Works / City Engineer ATTACHMENTS: Resolution; Bid Tab Summary; Letter of APPROVED BY: Recommendation; Map D Di RECOMMENDED ACTION: Motion to Adopt a Resolution Receiving Bids and Awarding the Contract for the Flint Hills Ravine Stabilization Project, ENG 0055. -AND- Motion to Approve Change Order #1 for the Flint Hills Ravine Stabilization Project, ENG 0055 and Authorize Necessary Signatures. BACKGROUND: On Friday, September 7,2012,bids for this project were received and read aloud publicly. After verification of bids received,the low bidder is Dahn Construction in the amount of$164,501. The Engineer's estimate was $220,120. The Flint Hills Ravine Stabilization Project is intended to address erosion issues along TH 52 on the east side of the railroad tracks located on Flint Hills Resources property. The City has executed Joint Power Agreements with the Vermillion River Watershed Joint Powers Organization and MnDOT to commence with the necessary improvements. Change Order#1 is also recommended to be approved with the award of this project. Items within this change order include: • Adding a new bid item for working within the Union Pacific Railroad right-of-way. This bid item compensates the contractor for the cost of permitting,insurance,and flagging required for working within the Union Pacific Railroad right-of-way. • Changing the units of measurement for the concrete footing item from square yards to square feet. • Adding a new bid item for a clay liner. This is an additional requirement by the Vermillion River Watershed Joint Powers Organization that was received after the bid. This project will be funded by a Clean Waters Fund Competitive Grant from the State of Minnesota,the Vermillion River Watershed Joint Powers Organization,Dakota County and Mn/DOT. In July,Council approved the Joint Powers Agreement that defines the funding responsibilities of each organization. SUMMARY: Staff recommends that Council adopt the attached resolution receiving the bids and awarding the contract for the Flint Hills Ravine Stabilization Project,ENG 0055 and also a second motion approving Change Order 1 authorizing the necessary signatures. G:\ENGPROJ\ENG 0055-Flint Hill Resources\20120918 CC RecBid-AwardContract.docx CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2012 — A RESOLUTION RECEIVING BIDS AND AWARDING THE CONTRACT FOR THE FLINT HILLS RAVINE STABILIZATION PROJECT ENG 0055 WHEREAS, the City Council authorized the City Engineer to advertise for bids. BE IT RESOLVED, by the City Council of the City of Rosemount,Minnesota, as follows: All bids on construction of Flint Hills Ravine Stabilization Project have been received and tabulated. 1. The bid of Dahn Construction from Rosemount,Minnesota, in the amount of$164,501 for the construction of said improvements is in accordance with the plans and specifications and advertisement for bids, and is the lowest responsible bid and shall be and hereby is accepted. 2. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount conditioned upon receipt of an executed easement from the property owner in a form approved by the City Attorney. 3. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids,except that the deposit of the successful bidder and the next two lowest bidders shall be retained until a contract has been executed. ADOPTED this 18th day of September, 2012. William FL Droste,Mayor ATTEST: Amy Domeier, City Clerk WSB BID TABULATION SUMMARY Project: Flint Hills Resource Center Ravine Stabilization Project Location: City of Rosemount, MN City Project No. ENG 0055 WSB Project No. 1668-94 Date: September 7, 2012, 10:00 a.m. Addendum Contractor Bid Security No. 1 Total Bid 1 Dahn Construction Co. X X $164,501.00 2 Veit& Company, Inc. X X $235,979.00 3 Rachel Contracting X X $257,588.00 4 New Look Contracting X X $269,013.50 5 Sunram Construction X X $345,258.50 6 Frattalone Companies X X $410,495.00 Engineer's Estimate $220,120.00 I hereby certify that this is a true and correct tabulation of the bids as received on September 7, 2012. Peter R. Willenbring, PE, Project Manager Denotes corrected figure WSB &&Assoc- engineering•planning•environmental•construction 701 Xenia Avenue South Suite 300 Minneapolis,MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 September 10, 2012 Honorable Mayor and City Council City of Rosemount 2875 — 145th Street West Rosemount, MN 55068 Attn: Cindy Dorniden, Public Works Secretary Re: Flint Hills Resource Center Ravine Stabilization Project City of Rosemount Project No. ENG 0055 WSB Project No. 1668-94 Dear Mayor and Council Members: Bids were received for the above-referenced project on Friday, September 7,2012,and were opened and read aloud. Six bids were received. The bids were checked for mathematical accuracy and tabulated. Please find enclosed the bid tabulation indicating the low bid as submitted by Dahn Construction Co, Rosemount, MN, in the amount of$164,501.00. The Engineer's Estimate was$220,120.00. Also, please be advised that since the bids were received,as part of a permit that has just recently received from the Union Pacific Railroad, an insurance policy will be required to be taken out by the Contractor that will add$7,500 to the project cost,and additional permit conditions included in the Vermillion River Watershed JPO will add project costs in the amount of$3,000. This will create the need for a change order in the amount of$10,500. We recommend that the City Council consider these bids and award a contract in the amount of $164,501.00 to Dahn Construction Co. based on the results of the bids received. Furthermore, we recommend approval of change order No 1 in the amount of$10,500. Sincerely, WSB&Associates,Inc. -44c7 Peter R. Willenbring, PE Project Manager St.Cloud• Minneapolis•St.Paul Equal Opportunity Employer wsbeng corn K:W166-95UdmiatCaaetruuio,Ad•d•\LTR RECMMDTN-bmcc-Fliaf Ildls 090712.doc Page 2 Enclosures cc: Keith Dahn, President, Dahn Construction Co. Andy Brotzler, City of Rosemount Ed Youngquist, WSB &Associates, Inc. Morgan Dawley, WSB&Associates, Inc. sm A:01668-94.4thnot Con.tructlon:Edam 11 LTR REG!.IDTN-hmcc-Flint 1LHs 0907!2 dk .l I Vermillion River w a t e r s h e d reflecting life September 11, 2012 Andy Brotzler, Director of Public Works, City Engineer City of Rosemount 2875 145th St. W. Rosemount, MN 55068-4997 Re: Flint Hills Ravine Stabilization Project Bid Award Dear Mr. Brotzler: Vermillion River Watershed Joint Powers Organization (VRWJPO) staff has reviewed the bid tabulation and bid summary for the Flint Hills Ravine Stabilization Project. We support city staff's recommendation to award the contract to Dahn Construction Co, Rosemount, MN, in the amount of$164,501.00. Sincerely, Travis Thiel Vermillion River Watershed Specialist Cc: Mark Zabel,VRWJPO Administrator Ed Youngquist, WSB&Associates, Inc. Pete Willenbring, WSB &Associates, Inc. Jim Davidson, Dakota County Soil and Water Conservation District Vermillion River Watershed Joint Powers Organization 14955 Galaxie Avenue,Apple Valley, MN 55124,952.891.7000, Fax 952.891.7588 CHANGE ORDER NO. 1 FLINT HILLS RESOURCES CENTER RAVINE STABILIZATION PROJECT SEPTEMBER 11,2012 CITY PROJECT NO.ENG 0055 WSB PROJECT NUMBER: 1668-94 OWNER: CONTRACTOR: CITY OF ROSEMOUNT DARN CONSTRUCTION COMPANY 2875 145TH STREET WEST 13135 DOYLE PATH EAST ROSEMOUNT, MN 55068 ROSEMOUNT,MN 55068 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: DESCRIPTION OF CHANGE ORDER. ADDING CLAY BORROW,RR INSURANCE, UNIT ADJUSTMENT IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY,SHAPE,OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: ORIGINAL CONTRACT PRICE: $164,501.00 ORIGINAL CONTRACT TIME: 10/31/2012 PREVIOUS CHANGE ORDERS: $0.00 NET CHANGE FROM PREVIOUS CHANGE ORDERS: N/A CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: $164,501.00 CONTRACT TIME PRIOR TO THIS CHANGE ORDER: 10/31/2012 NET INCREASE/DECREASE OF THIS CHANGE ORDER: $10,500.00 NET INCREASE OF CHANGE ORDER: N/A CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: $175,001.00 CONTRACT TIME WITH APPROVED CHANGE ORDERS 10/31/2012 ,RECOMMENDED BY: APPROVED BY: PETER WILLENBRING,PE, PROJECT MA1yAGER KEITH DARN,PRESIDENT WSB&ASSOCIATES, INC. DARN CONSTRUCTION ENGINEER CONTRACTOR APPROVED BY: CITY ENGINEER CITY ADMINISTRATOR DATE OF COUNCIL ACTION Change Order No. 1 Detail FLINT HILLS RESOURCES CENTER RAVINE STABILIZATION PROJECT September 11,2012 CITY PROJECT NO. ENG 0055 WSB PROJECT NUMBER: 1668-94 DELETED ITEMS Item No. Description Qty Unit Price Extended Amount 2411.503 CONCRETE FOOTING 140 SQ YD $27.00 $3,780.00 $0.00 TOTAL DECREASE CHANGE ORDER NO. 1 $3,780.00 ADDED ITEMS Item No. Description Qty Unit Price Extended Amount 2021.601 RAILROAD PROTECTIVE LIABILITY INSURANCE 1 LS $7,500.00 $7,500.00 2411.503 CONCRETE FOOTING 140 SQ FT $27.00 $3,780.00 2105.603 IMPORTED CLAY BORROW MATERIAL 100 CU YD $30.00 $3,000.00 $0.00 $0.00 TOTAL INCREASE CHANGE ORDER NO. 1 $14,280.00 ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT $10,500.00 K:10 1 6 68-941AdminlConstruc lion AdminlPay VoucherslCopy of Change Order No.1 RV2 . r i 4 ' , , ',,,4„ , D., . . Project Site Map it , ,,,,,, ,, I ,- " Ili - :=,"*.I.':',":.t.ov-,t..-1"1„.-•,p.'4,,,, -),(.;;;,;„„ '; '••;; ; '1, , • -1 4111.*V6Z ;;..'..•1-' 4 f''f'• ' ,;',....,,,, . i Railroau „k.,": '' ^-•„, i,,,L,, .,.. ,.4 C. , '4. ' • , -.'. , .,., t, .. 0 1 ,f 1 , ,„ - , , - , ‘,„...„,,,,,,...,".,,, 'A t, . • *--, " 1, ** '"' •t;, ".-1”t0. ' ' 1 41:,„t1 ,- • ,-,11,,. , , - „ ;,,,,,,,,,,- A ° '"'.. #,,I,*i ,Z'....• ...,,, f,iv. ;..t., 1 ./V.•; 7 f 4 1 !IP • • iS...,. , ,. ..lo "'87,44.., 1‘ ';; ' •.., ' :' e-`f,xi;X:■4.# 1:,:.; . .;;Vt4 •...k. : -;...ee\`';;' .. . . V . . It,., ,_1. .,„ _ .,... , 4 t . .,. .... .,...,.,_ ., - , - , ...........,... ,, .... . . - I ° im '''''l ' \ 4-* . *,'•It„ '' „ •' ^-* ,;„ •7 et '•,,,, '? ,':;a . - ''''''r: ";* ' . *,i,'Ii 'kto. *i'' s t,- 4, .I Is, , , w ' Sediment Outwash - „ 4 f-, -v° • tt,,T1101‘ ...„ 4,..f.it...,..,• .. 1. ...._ ...,f1. 1 /41 ' .AlliLiaii.7,':- •,i'. , .•. A,„..&- '''F.r f!..f.', '' ' f''• f•, ' . 511/I"V 'A''': ''' . °' l'A'7 f , ., 101, „ - -,,,,,;• - P'3, '' '-- . . . ' , .141,,,Afik■.;;14xt ,.. 4 4.=-.S1,1,,-..,,,o; -, -,ki.,,,!-A, . ---? '; , 'F.?, AIL,-« . .1', .-‘1F7, ,., ,,,i'',,, -4''' •It;iir i` ;.' , .._-•- *' ' - • ' ,,* .t.,• . --' ,,,.,,,,:i., •arriiiit,.. pfb`*, ii, ,', ttt..,•41AVI „., i..,..r.,._ir,..„, .,.. .. ,...--.7„. ,..„1,- ,.., 1.,-. 14- !-.._ ... •-•:-.,f,.:441,.,70,ww....f,-,s,...„,:,,,..4., ,... .,74- , tz. ,,,, iirfdr,;" .4 -#-°. ,t..,.:t,--I „Of° :` .,,, 11 D''' 4 ...,,,,-; 4241 „ ,..,,,.` .. 4i,- \,..! . . ,,,,, :,, ,,,i:.4,, ,,,,,.:44e:"„''',e, ,.,,:,.',.,,,c75 ik. s,..1..-.,,,,,;1kifii'llt,„:„ r,- - -,,, :,4,;r.„.,,..;:iii....,":', D D AD Mississippi ,..., r"...., :* „:,.. :-.,, 3t,c5, i 11,,*,;.tt.Wik.'e.,,,„ ;.: ,...,;;''Y• •','f. * I ‘ River Trail i , .... :7, 4'-1. •""" - ':, , , t , ,t ltt t ,t, IC ' ' ' .' - '. i4 r ■ i ' ,, ,•4' . `,•.".r,,,,„'r y ', ," i',i,,,„,••- '' 4. 1,',k ) " 4 '' .. .6 • ;'.. , i.' t'''#' - •- ..4., _ . or-':'-'''' . . . , . ' 3 , ,... . . .d& , ---. TH 55 ' "-. ",.. ' 0 50 100 200 01-* 01-.- .... I I I I I -'.-.1' , ,.. 4,4 Feet „