Loading...
HomeMy WebLinkAbout6.f. Authorize Preparation of Feasibility Report for 2013-2015 Street Improvements Project, City Project 445 ROSEv1OUNT EXECUTIVE SUMMARY CITY COUNCIL City Council Meeting: October 2, 2012 AGENDA ITEM: Authorize Preparation of Feasibility AGENDA SECTION: Report for 2013 - 2015 Street Consent Improvements Project, City Project 445 PREPARED BY: Andrew J. Brotzler, PE, Director of j r AGENDA NO. Public Works / City Engineer '4 ATTACHMENTS: Resolution; Map APPROVED BY: Dili RECOMMENDED ACTION: Motion to Adopt a Resolution Authorizing the Preparation of a Feasibility Report for the 2013 - 2015 Street Improvements Project, City Project 445. BACKGROUND: Beginning in 2010, the City initiated a plan to prepare multi-year feasibility reports with the intention of providing a longer range look at upcoming projects and allowing for more advance notice to property owners. As a result,each year's feasibility study will review and update the current project,as well as provide information about the proposed improvements for the following two years. The attached map identifies the roadways proposed to be evaluated in the 2013 -2015 feasibility report. The following information will be included in the report: • Existing conditions with detailed information on the existing materials • Proposed improvements • Detailed cost estimates and proposed funding sources • Estimated assessments The estimated engineering fee is $13,000. This includes the following activities: • Preparation of feasibility report • Conducting one public informational meeting • Public coordination including the preparation of informational letters,invitations,web page updates, and response to resident questions and inquiries • Presentation of final report to City Council at the Public Hearing Based on the preliminary estimated construction cost of$680,000 this represents an estimated fee percentage of 1.9%. SUMMARY: Staff recommends Council approval of the attached resolution to authorize the preparation of a feasibility report for the 2013 -2015 Street Improvements Project. G:\ENGPROJ\445\20121002 CC Authorize FR2013-2015 SIP.docx CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2012 — A RESOLUTION AUTHORIZING THE PREPARATION OF A FEASIBLITY REPORT FOR THE 2013 - 2015 STREET IMPROVEMENTS PROJECT WHEREAS,the City Council of the City of Rosemount deems it necessary to investigate the feasibility of the 2013 - 2015 Street Improvements Project. NOW THEREFORE BE IT RESOLVED,The City Engineer is directed to have the necessary feasibility report prepared for the 2013 - 2015 Street Improvements Project. ADOPTED this 2nd day of October, 2012. William H. Droste,Mayor ATTEST: Amy Domeier, City Clerk 1 LT 1 T ,_____, 0 y r 7CONNEMARA li N e7 8 Q CON :IT w a 0 Z L ° 1 < 11111141111111111 S/' u) I ca c 1 \ a 145TH ST W U \\ 45TH 145TH ST W__1 , armi L___, _ . III 0 6 [ii )--- ,, r'� d s WI.,----'4 .rsimi c_________H____. ille am .tos, (4,49tt, ,Q El. . : M I,) ‘1,... ,.„, >, re Mill 111111111j WI _ ► a Ql Zr- 3 W, Clizi /tip 1:11 Z 0 of 0 ilifir / ‘,c3I• Ed ! ,16; ill ' ON la r \ ,iW 1 I ' 160TH ST W (CSAH 46) , 160TH ST W(CSAH 46) Proposed 3-Year CIP • 4 ROSEMOUN'T Improvements 2013, 2014& Beyond N MINNESOTA "to 2013 Mill&Overlay'+2014 Reconstruction'No Beyond 2015