Loading...
HomeMy WebLinkAbout7.a. 2013 Street Improvements Project Public Hearing, City Project #445 1 ROSEN4EIUNT EXECUTIVE SUMMARY CITY COUNCIL City Council Meeting: December 4, 2012 AGENDA ITEM: 2013 Street Improvements Project Public AGENDA SECTION: Hearing, City Project 445 Public Hearing PREPARED BY: Andrew J. Brotzler, PE, Director of P lic AGENDA NO. Works/City Engineer ATTACHMENTS: Resolutions; APPROVED BY: Location Map RECOMMENDED ACTION: 1. Motion to Adopt a Resolution Ordering the 2013 Street Improvements Project, City Project 445. 2. Motion to Adopt a Resolution Authorizing the Preparation of Plans and Specifications for the 2013 Street Improvements Project, City Project 445. ISSUE: Consider ordering the 2013 Street Improvements Project and authorizing the preparation of plans and specifications. The estimated engineering fee for final design is $23,300. This includes the following activities: • Preparation of plans and specifications • Estimates of construction cost • Including City striping with project contract • Preparation of bidding documents, advertisement for bids, and recommendations on award of bids The preliminary estimated construction cost is $617,100. City striping is roughly estimated at$40,000. Based on the preliminary estimated construction cost of$657,100, this represents an estimated fee percentage of 3.5%. This fee percentage is less than the average design fee based on the project being a mill and overlay with no street reconstruction, trail or sidewalk construction, or utility replacement. The estimated engineering fee for additional project administration services is $9,800. This includes the following activities: • Utility coordination • Staff reports, declaration of costs and presentation • Assessment calculations, assessment roll, and assessment hearing with presentation Based on the preliminary estimated construction cost of$657,100, the additional project administration represents an estimated fee percentage of 1.5%. G:AF.NGPROJ\445\20121204 CC Pf fOrdPrjPlsp.docx BACKGROUND: On November 20, 2012, the Rosemount City Council received the Feasibility Report for the 2013 Street Improvements Project,City Project 445. Staff will present a brief overview of the project and respond to questions that Council members or the public may have regarding the proposed improvements or assessments. A summary of the proposed improvements and estimated project cost and funding is provided below. Proposed Improvements The 2013 Street Improvement Project includes mill and overlay of the following streets: • Carrollton Addition and Carrollton 5th Addition (0.83 miles) • 155th Street West between Shannon Parkway and Chippendale Avenue (0.49 miles) • Danville Avenue between 160`h Street West and Upper 156th Street West (0.26 miles) Schedule It is proposed that construction begin in June 2013 and is anticipated to be completed,including all restoration items,by the fall of 2013. Public Informational Meeting Prior to the public hearing, staff hosted a public informational meeting for property owners on Tuesday, November 13,2012 to address questions and comments regarding the project and proposed assessments. Public comments were recorded and are included in the feasibility report. Cost and Funding A summary of estimated project costs and proposed funding is provided below: Table 1 - Summary of Cos t Carrollton and Carrollton 5th Addition $259,800 155th Street West $283,900 Danville Avenue $197,000 2013 Sealcoat $200,970 Total $941,670 Table 2— Proposed Assessments Calculated Assessment Units Total Assessment Carrollton and Carrollton 5th Addition $1,260 79 $99,540 155th Street West $1,260 55 $69,300 Danville Avenue $1,260 4 $5,040 Total $173,880 2 Table 3 -Proposed Funding Street CIP Assessments Total Carrollton and Carrollton 5th Addition $160,260 $99,540 $259,800 155th Street West $214,600 $69,300 $283,900 Danville Avenue $191,960 $5,040 $197,000 2013 Sealcoat $200,970 $200,970 Total $767,790 $173,880 $941,670 SUMMARY: Staff is requesting that the City Council adopt the attached resolutions ordering the project and authorizing the preparation of plans and specifications for the 2013 Street Improvements Project,City Project 445. 3 CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2012 - A RESOLUTION ORDERING THE PROJECT 2013 STREET IMPROVEMENTS PROJECT CITY PROJECT 445 WHEREAS, the City Council has received and accepted the Feasibility Report on November 20, 2012 for City Project 445,and WHEREAS, the City Council held a Public Hearing on December 4,2012. NOW THEREFORE BE IT RESOLVED, that the City Council of the City of Rosemount hereby orders the improvements of the 2013 Street Improvements Project, City Project 445. ADOPTED this 4th day of December,2012. William H.Droste,Mayor ATTEST: Amy Domeier, City Clerk CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2012 - A RESOLUTION AUTHORIZING THE PREPARATION OF THE PLANS AND SPECIFICATIONS FOR THE 2013 STREET IMPROVEMENTS PROJECT CITY PROJECT 445 WHEREAS, the City Council has received and accepted the Feasibility Report on November 20, 2012 for City Project 445, and WHEREAS,the City Council held a Public Hearing on December 4, 2012 and ordered the project. NOW THEREFORE BE IT RESOLVED, that the City Council of the City of Rosemount orders the preparation of plans and specifications for said improvements of City Project 445. ADOPTED this 4th day of December, 2012. William FL Droste,Mayor ATTEST: Amy Domeier, City Clerk ■:7'.- . 14-CT1,2-) g 1"-- ,. „.„..„ ,,A -, ,,, , -, ,,,,,.. . L-1 S';'. jte 142ND ST W Q-P , Z DAV NPORT CT w 0 C \r M i„,.., , ,v,,,,-.',4 P..),'P■.:si 4 > ,,c 00° 143RD ST W ./143R0 ST N, ? 143R$ ST W < 143:11 ' ,-. WAY L...9 <> my= 143RD < I - , 0 _ „ - -4 CD , i a I 4 r„, ) 1 0 tr” MillillORIST W 1 8 4. 0'1 .2 ° 114,H-, ,A, '5 - 2 L 1 • Q i 145TH ST W -- N-:-'' -63 45TH ST 1, , 0 g U 145TH ST , 9, i- Y.:1 .,..' < 146TH ST W 17 rir A 1,1(11 ST V L.147TH +4.1 LOWER 147TH ST VV 4 / 146TH ST W I L 1.1.'71.9 S T VV O' U. 1-, .44 1-1.4 I147TH ST W ---.■-. ., 'S o o L-F,. 14/TH 9 i x-,„P < < / • U 147TH ST W ! „ . 0 z 148TH ST W • < .. < 0.° '..- ,, -: * ' • 3 0- -.1 ''A % -----1‘,.., 1487H ST W .. .2. z../ ... <5 . § U 148TH ST . a '.. 1 x _.■ a tr, ' U.1487 ,'"' ' I.- 0 0 . <‹: w Z • 111.. > LIJ < 5 149TH -.' -----')/.. ST W • 149TH ST ' _ ST W :_. = 0, , LI ---N CT > ,,cc 143H ST W < m --, () C.) C, 2 U 149TH 1,r a ,-4 = al UP• - 49TH T IN 149TH ST ' . L 150TH ST W / II al ILI 4J &' 1 1 DECEMBER 2 > WAY 0 < < CIR ■- cn F- l11 757s.., Cr 1/ 1 0 ..., 7. Ds ' DECEMBER TRy f s' DA• OOR .'„„ co UMBAR 042.iti oertitV'1.° 152ND ST W CIR CI :r 1S,U CY) MOW I C) 153RD S W AR 54TH CT 153RD ST VV C:: ce 0 E. 11111P c_ ca 15 ONE= .0 - CHU 1 CT 44 ).., -4 - it 0 1 • 111 1 i a -- • F- 1551H ST W Al C .1 3 5 .... a U- CORNELL TRL 7 DARLING PATH ' III CP , 0 1 156TH ST W - Z 4.1N. 1110M • I tN S 7 Ro U' E , 1-.ELL TRL 4.. . c % _• • ,-;-,-, a . • , ; 0 _ ,....„ p, - , , c? CT 0 ., . ., , cO• LL . - C'C' • ,- W x -- CT S c, 90\4'. 158TH ST • , 4.1>. DARLING PAT R, 4,,, .'''' 444 C.,\?' Lk', _.1 1.L..T W 157TH ST '4:4 .1 T 5 4, -- .......... .... o e- z- ) (.1) 1')0T1-i CT W 158TH ST W (4 410■••••••• 7. 7) 7 I 144—+444 1 1)17H CT Vti C' - -7R ..r '' , $7,..4 4‘,, 1....) 411•••••■••• - ,", 160T1 —1 - . ROSEMOUN-1" . 2013 Street Improvement Project • N _ MINNESOTA Mill & Overlay