HomeMy WebLinkAbout6.j. Payment 10 & Final – Connemara Trail Improvements, City Project 4314DIN(C".11SEMOLINT EXECUTIVE SUMMARY
CITY COUNCIL
City Council Meeting: February 5, 2013
AGENDA ITEM: Payment #10 & Final —Connemara Trail
AGENDA SECTION:
Improvements, City Project 431
Consent
PREPARED BY: Andrew J. Brotzler, PE, Director of blic
AGENDA NO.
Works / City Engineer
ATTACHMENTS: Payment Voucher, Map
APPROVED BY:
RECOMMENDED ACTION: Motion to Approve Payment #10 and Final for the Connemara
Trail Improvements, City Project 431, to Minger Construction, Inc. and Accepting it for
Perpetual Maintenance.
BACKGROUND:
This item is on the agenda to request Payment #10 and Final to Minger Construction, Inc. for the
Connemara Trail Improvements, City Project 431.
The final construction amount of $2,307,972.48 is 1.44% below the contract amount of $2,341,683.51.
SUMMARY:
Staff recommends that Council approve Payment #10 and final for the project and accept the project for
perpetual maintenance subject to the following conditions.
1. Satisfactorily showing that the contractor has complied with the provisions of Minnesota Statutes
290.92 requiring withholding state income tax.
2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the
contract have been fully paid or satisfactorily secured.
3. Consent of Surety to Final Payment certification from the contractor's surety.
4. Two -year maintenance bond.
G: \ENGPROJ \431 \20130205 CC Payment 10 & Final.docx
WSB
& Assoc- engineering • planning • environmental • construction
January 29, 2013
Mr. Luke Minger
Minger Construction, Inc.
P.O. Box 236
Chanhassen, MN 55317
Re: Construction Pay Voucher No. 10 (Final)
Connemara Trail Improvements
City of Rosemount Project No. 431
S.A.P. 208 - 104 -006
WSB Project No. 1916 -18
Dear Mr. Minger:
701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
Tel: 763-5414800
Fax: 763 -541 -1700
Please find enclosed Construction Pay Voucher No. 10 and final (in triplicate) for the above - referenced
project for your review and signature. Please sign all three originals and return to the City of
Rosemount for processing. Please note that the original signed vouchers must be accompanied by the
following documents when submitting for final payment.
1. Satisfactory showing that the contractor has complied with the provisions of Minnesota Statutes
290.92 requiring withholding state income tax (IC134 forms).
2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the
contract have been fully paid or satisfactorily secured (lien waivers).
3. Consent of Surety to Final Payment certification from the contractor's surety.
4. Two -year Maintenance Bond (warranty start date to coincide with the date Council approves final
payment).
If you have any questions or concerns, please contact me at 651- 322 -2015. Thank you for your prompt
attention to this matter.
Sincerely,
NSB & Associates, Inc.
Q%01116—,
Phil Olson, PE
Project Engineer
Enclosures
cc: Andy Brotzler, City of Rosemount
Jean Harrington/Karin Kladar, City of Rosemount srb
St. Cloud • Minneapolis • St. Paul
Equal Opportunity Employer
wsheng.com
\\" 01\ projects \01916- 18\AdminlConstroction Ad W.T.y Va..he A431 LTR VO 10 FNL CTR4 mi.gc 012913.doc
Owner: City of Rosemount
2875 145th Street West
Rosemount, MN 55068 -4941
WSB
For Period: 9/1/2012 to 1213112012
Contractor: Minger Construction, Inc.
��► 2471 Galpin Court
& Associates, Inc. Chanhassen, MN 55317
Pay Voucher
RSMT - Connemara Trail Improvements
Client Contract No.:
Project No.: 01916 -18
Client Project No.: 431
Date: 1/25/2013
Request No.: 10 & FINAL
Project Summary
1
Original Contract Amount
$2,341,683.51
2
Contract Changes - Addition
$38,092.42
3
Contract Changes - Deduction
$0.00
4
Revised Contract Amount
$2,379,775.93
5
Value Completed to Date
$2,307,972.48
6
IMaterial on Hand
$0.00
7
Amount Earned
$2,307,972.48
8
Less Retainage
$0.00
9
Subtotal
$2,307,972.48
10
Less Amount Paid Previously
$2,277,557.25
11 ILiquidated
Damages
$0.00
12 JAMOUNT
DUE THIS PAY VOUCHER NO. 10 & FINAL
$30,415.23
I HEREBY CERTIFY THAT A FINAL EXAMINATION HAS BEEN MADE OF THE ABOVE NOTED CONTRACT, THAT THE
CONTRACT HAS BEEN COMPLETED, THAT THE ENTIRE AMOUNT OF WORK SHOWN IN THE FINAL VOUCHER HAS BEEN
PERFORMED AND THE TOTAL VALUE OF THE WORK PERFORMED IN ACCORDANCE WITH, AND PURSUANT TO, THE
TERMS HE TRACT IS AS SHOWN IN THIS FINAL VOUCHER.
for
WSB &
A kprovediy Contractor:
C struction, Inc.
Specified Contract Completion Date:
6/30/2012
Comment:
Construction Observer:
Approved by Owner:
City of Rosemount
Date:
Page 1
Project Material Status
Item
No.
Item
Description
Units
Unit Price
Contract
Quantity
Quantity to
Date
Current
Quantity
Amount to
Date
SCHEDULE A - SURFACE IMPROVEMENTS
1
2021.501
MOBILIZATION (5% MAXIMUM)
LUMP SUM
$104,000.00
1
1
0
$104,000.00
2
2101.502
CLEARING
TREE
$265.00
3
3
0
$795.00
3
2101.5071
GRUBBING
TREE
$265.00
3
3
0
$795.00
4
2104.5011
REMOVE FENCE
LIN FT
$2.45
800
590
0
$1,445.50
5
2104.501
REMOVE CURB AND GUTTER
LIN FT
$5.90
60
50
0
$295.00
6
2104.503
REMOVE CONCRETE WALK
SO FT
$1.151
350
125
0
$143.75
7
2104.503
REMOVE BITUMINOUS WALK
SO FT
$2.351
80
0
0
$0.00
8
2104.503
REMOVE CONCRETE MEDIAN
SO FT
$11.80
30
0
0
$0.00
9
2104.505
REMOVE BITUMINOUS PAVEMENT
SQ YD
$3.50
150
167
0
$584.50
10
21 G4.5091
REMOVE PERMANENT BARRICADE
EACH
$26.40
3
3
0
$79.20
11
2104.511
SAWING CONCRETE PAVEMENT (FULL DEPTH)
LIN FT
$11.80
20
0
0
$0.00
12
2104.513
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
LIN FT
$3.50
150
110.5
0
$386.75
13
2104.523
SALVAGE PERMANENT BARRICADE
EACH
$21.00
6
6
0
$126.00
14
2105.501
COMMON EXCAVATION (P)
CU YD
$2.50
32700
32700
2260
$81,750.00
15
2105.507
SUBGRADE EXCAVATION (P)
CU YD
$2.50
7400
7400
0
$18,500.00
16
2105.5151
UNCLASSIFIED EXCAVATION
CU YD
$4.05
4500
8200
0
$33,210.00
17
2105.5211
GRANULAR BORROW (CV)
CU YD
$0.01
13500
3069
0
$30.69
18
2105.522
SELECT GRANULAR BORROW (CV) (P)
CU YD
$8.151
13700
13700
0
$111,655.00
19
2105.525
TOPSOIL BORROW (LV)
CU YD
$18.801
100
0
0
$0.00
20
2105.601
MINOR GRADING 1
LUMP SUM
$2,450.00
1
1
1
$2,450.00
21
2112.501
SUBGRADE PREPARATION
ROAD STA
$332.00
27.7
27.7
0
$9,196.40
22
2123.610
STREET SWEEPER (WITH PICKUP BROOM)
HOUR
$145.00
40
2
0
$290.00
23 12130.5011
WATER
M GALLONS
$26.10
100
0
0
$0.00
24
2211.501
AGGREGATE BASE CLASS 5
TON
$13.80
9300
8133.43
0
$112,241.33
25
2357.502
BITUMINOUS MATERIAL FOR TACK COAT
GALLON
$3.151
1900
1805
0
$5,685.75
26
2360.501
TYPE SP 12.5 WEARING COURSE MIXTURE (2,C)
TON
$52.05
4300
3718.82
0
$193,564.58
27
2360.502
TYPE SP 12.5 NON WEARING COURSE MIXTURE (2,C)
TON
$54.95
2150
2013.9
0
$110,663.81
28
2521.501
4" CONCRETE WALK
SO FT
$2.55
4800
4437
0
$11,314.35
29
2521.511
2" BITUMINOUS WALK
SO FT
$1.10
41200
41688
0
$45,856.80
30
2531.501
CONCRETE CURB & GUTTER DESIGN 8418
LIN FT
$9.00
8801
838.5
0
$7,546.50
31
2531.501
CONCRETE CURB & GUTTER DESIGN 8618
LIN FT
$9.25
5850
5726.5
0
$52,970.13
32
2531.602
CONCRETE MEDIAN NOSE DESIGN 7109
EACH
$316.55
1
1
0
$316.55
33
2531.618
TRUNCATED DOMES
SO FT
$29.55
152
156
0
$4,609.80
34
2545.523
4" NON - METALLIC CONDUIT
LIN FT
$7.60
250
810
0
$6,156.00
35
2554.602
PERMANENT BARRICADES (TYPE 111)
EACH
$150.00
10
6
0
$900.00
36
2563.6011
TRAFFIC CONTROL
LUMP SUM
$1,740.001
1
1
0
$1,740.00
37
2564.531
SIGN PANELS TYPE C
SO FT
$29.30
159.25
154.25
0
$4,519.53
38
2573.502
SILT FENCE, TYPE HEAVY DUTY
LIN FT
$1.60
8050
7438
0
$11,900.80
39
2573.602
INLET PROTECTION
EACH
$105.00
36
42
0
$4,410.00
40
2573.602
TEMPORARY ROCK CONSTRUCTION ENTRANCE
EACH
$855.00
2
2
0
$1,710.00
41
2575.501
SEEDING
ACRE
$135.00
7.8
15.27
0
$2,061.45
42
2575.502
SEED MIXTURE 260
POUND
$1.50
390
703
0
$1,054.50
43
2575.502
SEED MIXTURE 310
POUND
$14.85
40
30
0
$445.50
44
2575.502
SEED MIXTURE 340
POUND
$3.85
130
207
0
$796.95
45
2575.505
SODDING, TYPE LAWN (INCL. TOPSOIL & FERT.)
SO YD
$2.55
1100
01
0
$0.00
46
2575.511
MULCH MATERIAL TYPE 1
TON
$215.00
10
14.75
0
$3,171.25
47
2575.523
EROSION CONTROL BLANKETS CATEGORY 1
SO YD
$0.801
2500
4213
0
$3,370.40
48 12575.5231
EROSION CONTROL BLANKETS CATEGORY 3
SQ YD
$0.80
10500
12559
0
$10,047.20
49 12575.5321
FERTILIZER TYPE 1
POUND
$0.401
1100
1337
0
$534.80
50
12582.5011
PAVEMENT MESSAGE (LEFT ARROW) PAINT
EACH
$53.001
61
0
0
$0.00
Page 2
Item
No.
Item
Description
Units
Unit Price
Contract
Quantity
Quantity to
Date
Current
Quantity
Amount to
Date
51
2582.501
PAVEMENT MESSAGE (RIGHT ARROW) PAINT
EACH
$53.00
2
0
0
$0.00
52
2582.501
PAVEMENT MESSAGE (LEFT ARROW) EPDXY
EACH
$130.00
6
6
0
$780.00
53
2582.501
PAVEMENT MESSAGE (RIGHT ARROW) EPDXY
EACH
$130.00
2
2
0
$260.00
54
2582.502.4-
SOLID LINE WHITE -PAINT
LIN FT
$0.07
5600
0
0
$0.00
55
2582.50214'
SOLID LINE YELLOW -PAINT
LIN FT
$0.15
230
0
0
$0.00
56
2582.502
24" SOLID LINE YELLOW -PAINT
LIN FT
$0.80
440
0
0
$0.00
57
2582.502
4" DOUBLE SOLID LINE YELLOW -PAINT
LIN FT
$0.30
2400
0
0
$0.00
58
2582.502
4" SOLID LINE WHITE -EPDXY
LIN FT
$0.25
5600
5503
0
$1,375.75
59
2582.502
4" SOLID LINE YELLOW -EPDXY
LIN FT
1 $0.30
2301
273
0
$81.90
60
2582.502
4" DOUBLE SOLID LINE YELLOW -EPDXY
LIN FT
1 $0.551
2400
2791
0
$1,535.05
61
12582.502124"
SOLID LINE YELLOW -EPDXY
I LIN FT
1 $5.301
4401
316
0
$1,674.80
Totals For Section SCHEDULE A - SURFACE IMPROVEMENTS:
$969,028.27
SCHEDULE B - SANITARY SEWER IMPROVEMENTS
62
2104.509
REMOVE MANHOLE
EACH
$5,500.00
1
1
0
$5,500.00
63
2451.609
GRANULAR FOUNDATION ANDIOR BEDDING
TON
$30.60
10
0
0
$0.00
64
2503.601
SANITARY SEWER BYPASS PUMPING
LUMP SUM
$18,000.00
1
1
0
$18,000.00
65
2503.602
CONNECT TO EXISTING SANITARY SEWER
EACH
$2,000.00
3
3
0
$6,000.00
66
2503.603
TELEVISE SANITARY SEWER
LIN FT
$5.00
182
162
0
$810.00
67
2503.60318'
PVC PIPE SEWER - SDR 26
LIN FT
$35.001
162
162
0
$5,670.00
68
2503.541
30" RC PIPE SEWER DESIGN 3006 CLASS III
LIN FT
$200.00
20
11
0
$2,200.00
69
2506.516
CASTING ASSEMBLY
EACH
$650.00
4
4
0
$2,600.00
70
2506.603
CONST 48" DIA SAN SEWER MANHOLE
LIN FT
$160.00
29.11
33.96
0
$5,433.60
71
2506.603
CONST 72" DIA SAN SEWER MANHOLE
LIN FT
$485.00
17.33
8.83
0
$4,282.55
Totals For Section SCHEDULE B -SANITARY SEWER IMPROVEMENTS:
$50,496.15
SCHEDULE C - WATER MAIN IMPROVEMENTS
72
2104.501
REMOVE WATER MAIN
LIN FT
$6.85
20
0
0
$0.00
73
2104.523
SALVAGE HYDRANT & VALVE
EACH
$730.00
1
1
0
$730.00
74
2504.602
INSTALL SALVAGED HYDRANT, GATE VALVE, AND BOX
EACH
$1,100.00
1
1
0
$1,100.00
75
2504.602
HYDRANT
EACH
$3,510.00
5
5
0
$17,550.00
76
2504.602
6" GATE VALVE AND BOX
EACH
$1,140.00
5
5
0
$5,700.00
77
2504.602
8" GATE VALVE AND BOX
EACH
$1,545.00
3
3
0
$4,635.00
78
2504.602
12" GATE VALVE AND BOX
EACH
$2,600.00
7
6
0
$15,600.00
79
2504.602
CONNECT TO EXISTING WATER MAIN
EACH
$860.00
2
2
0
$1,720.00
80
2504.603
6" WATER MAIN -DUCT IRON CL 52
LIN FT
$28.60
106
108
0
$3,088.80
81
2504.603
8" WATER MAIN -DUCT IRON CL 52
LIN FT
$34.30
202
208
0
$7,134.40
82
2504.603
12" WATER MAIN -DUCT IRON CL 52
LIN FT
$48.751
2905
2711
0
$132,161.25
83 12504.60414"
POLYSTYRENE INSULATION
SQ YD
$30.00
40
1.8
0
$54.00
84 12504.608
1
DUCTILE IRON FITTINGS
POUND
$2.651
100001
4740
0
$12,561.00
Totals For Section SCHEDULE C - WATER MAIN IMPROVEMENTS:
$202,034.45
SCHEDULE D - STORM SEWER IMPROVEMENTS
85
2501.515
18" RC PIPE APRON
EACH
$930.00
1
1
0
$930.00
86
2501.515
24" RC PIPE APRON
EACH
$1,055.00
3
3
0
$3,165.00
87
2501.515
30" RC PIPE APRON
EACH
$1,250.00
1
1
0
$1,250.00
88
2501.602
48" RC PIPE APRON W /PILING
EACH
$5,955.00
2
2
0
$11,910.00
89
2501.602
TRASH GUARD FOR 18" PIPE APRON
EACH
$240.00
1
1
0
$240.00
90
2501.602
TRASH GUARD FOR 24" PIPE APRON
EACH
$515.00
3
3
0
$1,545.00
91
2501.602
TRASH GUARD FOR 30" PIPE APRON
EACH
$770.00
1
1
0
$770.00
92
2501.602
TRASH GUARD FOR 48" PIPE APRON
EACH
$1,450.00
2
2
0
$2,9050
93
2502.541
4" PERF PVC PIPE DRAIN
LIN FT
$14.60
100
100
0
$1,460.00
94
2503.541
15" RC PIPE SEWER DESIGN 3006 CLASS V
I LIN FT
$26.40
836
8121
0
$21,436.80
Page 3
Item
No.
Item
Description
Units
Unit Price
Contract
Quantity
Quantity to
Date
Current
Quantity
Amount to
Date
95
2503.541
18" RC PIPE SEWER DESIGN 3006 CLASS III
LIN FT
$28.10
418
441
0
$12,392.10
96
2503.541
21" RC PIPE SEWER DESIGN 3006 CLASS Ill
LIN FT
$31.25
406
406
0
$12,687.50
97
2503.541
24" RC PIPE SEWER DESIGN 3006 CLASS III
LIN FT
$32.75
297
271
0
$8,875.25
98
12503.541,30"
RC PIPE SEWER DESIGN 3006 CLASS III
LIN FT
$44.00
1287
1295
0
$56,980.00
99
2503.541
33" RC PIPE SEWER DESIGN 3006 CLASS 111
LIN FT
$49.40
82
82
0
$4,050.80
100
2503.541
36" RC PIPE SEWER DESIGN 3006 CLASS III
LIN FT
$59.00
548
542
0
$31,978.00
101
2503.541
42" RC PIPE SEWER DESIGN 3006 CLASS III
LIN FT
$75.00
490
490
0
$36,750.00
102
2503.541
48" RC PIPE SEWER DESIGN 3006 CLASS III
LIN FT
$90.00
212
198
0
$17,820.00
103
2503.602
CONSTRUCT BULKHEAD
EACH
$390.00
51
4
0
$1,560.00
104
12506.5011
CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 -4020
LIN FT
$224.00
57.63
58.42
0
$13,086.08
105
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 54 -4020
LIN FT
$256.60
13.61
11.79
0
$3,025.31
106
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 60 -4020
LIN FT
$272.40
37.28
38.9
0
$10,596.36
107
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 66 -4020
LIN FT
$279.60
38.26
30.97
0
$8,659.21
108
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 72 -4020
LIN FT
$323.10
24.46
25.23
0
$8,151.81
109
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 84 -4020
LIN FT
$475.55
16.94
15.49
0
$7,366.27
110
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 96-4020
LIN FT
$515.80
23.64
27.18
0
$14,019.44
111
2506.502
CONSTRUCT DRAINAGE STRUCTURE DESIGN G
EACH
$1,055.00
2
2
0
$2,110.00
112
2506.516
CASTING ASSEMBLY
EACH
$475.00
23
25
0
$11,875.00
113
2506.602
CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1
EACH
$1,020.00
10
101
0
$10,200.00
114
2506.602
CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 2
EACH
$8,400.00
1
1
0
$8,400.00
115
2506.602
CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 3
EACH
$10,330.00
1
1
0
$10,330.00
116
2506.602
CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 4
EACH
$14,500.00
1
1
0
$14,500.00
117
2511.501
RANDOM RIPRAP CLASS IV
CU YD
$92.50
116
156.41
16.41
$14,467.93
118
2511.501
RANDOM RIPRAP CLASS IV - GROUTED
CU YD
$137.45
64
166
0
$22,816.70
119
2511.515
GEOTEXTILE FILTER FABRIC TYPE IV JSQYD
1 $1.201
175
3871
0
$464.40
Totals For Section SCHEDULE D - STORM SEWER IMPROVEMENTS:
$388,768.96
SCHEDULE E - TRUNK STORM SEWER IMPROVEMENTS
120
2451.609
GRANULAR FOUNDATION AND /OR BEDDING
TON
$30.60
10
0
0
$0.00
121
2503.541
48" RC PIPE SEWER DESIGN 3006 CLASS V
LIN FT
$210.00
693
653
0
$137,130.00
122
2503.541
54" RC PIPE SEWER DESIGN 3006 CLASS V
LIN FT
$220.00
897
897
0
$197,340.00
123
2503.541
54" RC PIPE SEWER DESIGN 3006 SPECIAL
LIN FT
$1,060.00
272
272
0
$288,320.00
124
2503.602
CONSTRUCT BULKHEAD
EACH
$530.00
2
2
0
$1,060.00
125
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 -4020
LIN FT
$138.10
751
67.57
0
$9,331.42
126
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 84 -4020
LIN FT
$442.55
45.61
51.81
0
$22,928.52
127
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 108-4020
LIN FT
$1.00
50.01
19.99
0
$19.99
128
2506.516
CASTING ASSEMBLY
EACH
$525.00
5
5
0
$2,625.00
Totals For Section SCHEDULE E - TRUNK STORM SEWER IMPROVEMENTS:
$658,754.93
Backsheet 1
129 12105.6051 ERODIBLE ACRE WITHHOLDING JACRE 1($3.000.00)1 01 01 0
$0.00
Totals For Backsheet 1:
$0.00
Work Order 1
130
12504.602116-
GATE VALVE AND BOX
JEACH
1 $7,350.001
1
1
0
$7,350.00
131
12504.603116-
WATER MAIN -DUCT IRON CL 52
1 LIN FT
1 $74.501
1851
185
0
$13,782.50
Totals For Work Order 1:
$21,132.50
Work Order 2
132
2554.601
TEMPORARY TYPE III BARRICADES
LUMP SUM
$4,171.50
1
1
0
$4,171.50
133
95931
MODIFY STORM SEWER INVERT
LUMP SUM
$804.00
1
1
0
$804.00
134
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 60 -4020
LIN FT
$272.40
13.03
13.03
0
$3,549.37
135
95932
HYDROSEEDING, W/TYPE 6 HYDROMULCH BLEND
SQ YD
$0.85
7833
8771
938
$7,455.35
136
95933
CURB AND GUTTER REPAIRS
LUMP SUM
$1,452.00
1
1
0
$1,452.00
Page 4
Item No.
litem
IDescription
Units
I Unit Price
I Contract Quantity
lQuantity to Date
I Current Quantity
Amount to Date
137
195934
IF&I STREET ID SIGN
I LUMP SUM
1 $325.001
11
11
0
$325.00
Totals For Work Order 2:
$17,757.22
Project Totals:
$2,307,972.48
Page 5
Project Payment Status
Owner: City of Rosemount
Client Project No.: 431
Client Contract No.:
Project No.: 01916 -18
Contractor: Minger Construction, Inc.
Contract Chan es
No.
Type
Date
Description
Amount
BK1
Backsheet
8/31/2011
Erodible Acres Back Sheet
$0.00
WO1
Work Order
6/12/2012
Watermain Upsizing
$21,132.50
WO2
Work Order
9/5/2012
Work Order 2 (see work order document for description)
$16,959.92
Change Order Totals:
$38,092.42
Pa ment Summa ry
No.
From
Date
To Date
Payment
Total
Payment
Retainage
Per
Payment
Total
Retainage
Total
Payment +
Retainage
Work
Certified Per
Payment
Total Work
Certified
1
8/1/2011
8/31/2011
$138,392.96
$138,392.96
$7,283.84
$7,283.84
$145,676.80
$145,676.80
$145,676.80
2
9/1/2011
9/30/2011
$618,027.80
$756,420.76
$32,527.78
$39,811.62
$796,232.38
$650,555.58
$796,232.38
3
10/1/2011
10/31/2011
$482,531.79
$1,238,952.55
$25,396.41
$65,208.03
$1,304,160.58
$451,260.02
$1,247,492.40
4
11/1/2011
11/30/2011
$119,783.83
$1,358,736.38
$350.62
$65,558.65
$1,424,295.03
$63,680.69
$1,311,173.09
5
12/1/2011
4/30/2012
$311,912.81
$1,670,649.19
$19,513.72
$85,072.37
$1,755,721.56
$390,274.21
$1,701,447.30
6
5/1/2012
5/31/2012
$136,686.24
$1,807,335.43
$10,050.55
$95,122.92
$1,902,458.35
$201,011.05
$1,902,458.35
7
6/1/2012
6/30/2012
$177,627.98
$1,984,963.41
$9,348.84
$104,471.76
$2,089,435.17
$186,976.82
$2,089,435.17
8
7/112012
7131/2012
$275,507.92
$2,260,471.33
($84,471.76)
$20,000.00
$2,280,471.33
$191,036.16
$2,280,471.33
9
8/112012
8/31/2012
$17,085.92
$2,277,557.25
$0.00
$20,000.00
$2,297,557.25
$17,085.92
$2,297,557.25
10&
FINAL
9/1/2012
12/31/2012
$30,415.23
$2,307,972.48
($20,000.00)
$0.00
$2,307,972.48
$10,415.23
$2,307,972.48
Payment Totals:
$2,307,972.48
$0.00!$2,307,972.48
1 $2,307,972.48
Project Summary
Material On Hand:
Total Payment to Date:
Total Retainage:
Total Amount Earned:
$0.00
$2,307,972.48 Original Contract:
$0.00 Contract Changes:
$2,307,972.48 Revised Contract:
$2,341,683.51
$38,092.42
$2,379,775.93
Page 6