HomeMy WebLinkAbout6.g. Payment 4 & Final – Diamond Path Trail Project, City Project 434�tR.OSEMOUNT EXECUTIVE SUMMARY
CITY COUNCIL
City Council Meeting: April 2, 2013
AGENDA ITEM: Payment #4 & Final — Diamond Path Trail
AGENDA SECTION:
Improvements Project, City Project 434
Consent
PREPARED BY: Andrew J. Brotzler, PE, Director of c
Works / City Engineer
AGENDA NO.
ATTACHMENTS: Payment Voucher, Map
APPROVED BY:
RECOMMENDED ACTION: Motion to Approve Payment #4 and Final for the Diamond
Path Trail Improvements Project, City Project 434, to Max Steininger, Inc. and Accepting it
for Perpetual Maintenance.
BACKGROUND:
This item is on the agenda to request Payment #4 and Final to Max Steinger, Inc. for the Diamond Path
Trail Improvements Project, City Project 434.
The final construction amount of $339,372.94 is 4.2% above the contract amount of $325,797.71. The
increase in construction cost is due to additional site grading, roadway patching, and trail replacement
needed during construction. This project was completed as a joint project with Dakota County that
included 55% funding towards the project.
SUMMARY:
Staff recommends that Council approve Payment #4 and final for the project and accept the project for
perpetual maintenance subject to the following conditions.
1. Satisfactorily showing that the contractor has complied with the provisions of Minnesota Statutes
290.92 requiring withholding state income tax.
2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the
contract have been fully paid or satisfactorily secured.
3. Consent of Surety to Final Payment certification from the contractor's surety.
4. Two -year maintenance bond.
G,AF.NGPROJ \434 \Council Items \20130402 CC Payment 4 & Final.docx
Owner: City of Rosemount
A& 2875 145th Street West
Rosemount, MN 55068 -4941
WSB
For Period: 1111/2012 to 2/20/2013
Contractor: Max Steininger, Inc.
-�� 3080 Lexington Avenue South
fi . t +c��c iur <ts, /tic Eagan, MN 55121
Pay Voucher
RSMT - Diamond Path Trail Improvements
Client Contract No.:
Project No.: 01916 -22
Client Project No. 434
Date: 2120 /2013
Request No.: 4 & FINAL
Project
Summary
1
Original Contract Amount
$325,797.71
2
Contract Changes - Addition
$0.00
3
Contract Changes - Deduction
$0.00
4
Revised Contract Amount
$325,797.71
5
Value Completed to Date
$339,372.94
6
Material on Hand
$0.00
7
Amount Earned
$339,372.94
8
Less Retainage
$0.00
9
Subtotal
$339,372.94
10
Less Amount Paid Previously
$319,379.05
11
Liquidated Damages
$0.00
12
AMOUNT DUE THIS PAY VOUCHER NO. 4 & FINAL
$19,99389
I HEREBY CERTIFY THAT A FINAL EXAMINATION HAS BEEN MADE OF THE ABOVE NOTED CONTRACT, THAT THE
CONTRACT HAS BEEN COMPLETED, THAT THE ENTIRE AMOUNT OF WORK SHOWN IN THE FINAL VOUCHER HAS
BEEN PERFORMED AND THE TOTAL VALUE OF THE WORK PERFORMED IN ACCORDANCE WITH, AND PURSUANT
TO, THE TERMS OF THE CONTRACT IS AS SHOWN IN THIS FINAL VOUCHER.
Reg mmended fir pproval by: Construction Observer:
W & sspc'' t s, I
C. -- -
Approved by Contractor:
Max Steininger, Inc.
Specified Contract Completion Date:
9/22/2012
Comment:
Appro by ner.
City f o/s u t
Date:
Page 1
Project Material Status
Item
No.
Item
Description
Units
Unit Price
Contract
Quantity
Quantity to lCurrent
Date
Quantity
Amount to
I Date
Bituminous Trail Improvements
1
2021.501
MOBILIZATION (5% MAXIMUM)
LUMP SUM
$8,200.00
1
1
0
$8,200.00
2
2101.502
CLEARING
TREE
$106.96
9
12
0
$1,283.52
3
2101.507
GRUBBING
TREE
$53.48
9
12
0
$641.76
4
2101.511
CLEARING AND GRUBBING - SHRUB
EACH
$21.39
11
11
0
$235.29
5
2101.601
TREE TRIMMING
LUMP SUM
$1,069.60
1
1
0
$1,069.60
6
12102.5021
PAVEMENT MARKING REMOVAL
LIN FT
1 $2.67
24
64
0
$170.88
7
2104.501
REMOVE WOOD RETAINING WALL
LIN FT
$16.04
20
24
0
$384.96
8
2104.501
REMOVE CURB AND GUTTER
LIN FT
$19.65
325
242
0
$4,755.30
9
2104.503
REMOVE CONCRETE WALK
SQ FT
$1.59
200
277
0
$440.43
10
2104.503
REMOVE BITUMINOUS WALK
SQ FT
$1.59
450
723
0
$1,149.57
11
2104.505
REMOVE BITUMINOUS DRIVEWAY PAVEMENT
SQ YD
$12.01
2801
281
0
$3,374.81
12
12104.5071
REMOVE RIPRAP
LUMP SUM
$427.84
1
1
0
$427.84
13
2104.509
REMOVE SIGN
EACH
$26.74
1
1
0
$26.74
14
2104.509
REMOVE PIPE APRON
EACH
$267.40
2
2
0
$534.80
15
2104.511
SAWING CONCRETE PAVEMENT (FULL DEPTH)
LIN FT
1 $5.88
10
0
0
$0.00
16
2104.513
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
LIN FT
$2.14
220
455
0
$973.70
17
2104.523
SALVAGE & REINSTALL SIGN
EACH
$144.40
11
10
1
$1,444.00
18
2105.601
SITE GRADING
LUMP SUM
$62,400.00
1
1.09438
0
$68,289.31
19
2360.503
TYPE SP 12.5 WEARING COURSE MIXTURE (2,B) 3.0" THICK
SQ YD
$23.10
280
362.08
0
$8,364.05
20
2411.618
MODULAR BLOCK RETAINING WALL
SQ FT
$18.61
2200
2219
0
$41,295.59
21
2503.541
18" RC PIPE SEWER DESIGN 3006 CLASS III
LIN FT
1 $128.35
14
34
0
$4,363.90
22
2503.602
CONNECT TO EXISTING STORM SEWER
EACH
$508.06
21
2
0
$1,016.12
23
2504.602
SPRINKLER SYSTEM REPAIR
LUMP SUM
$4,000.00
1
0.95
0
$3,800.00
24
12506.501
ICONSTRUCT DRAINAGE STRUCTURE DESIGN 48 -4020
LIN FT
$1,588.35
3
3.27
0
$5,193.90
25
2506.516
CASTING ASSEMBLY
EACH
$363.66
1
1
0
$363.66
26
2506.522
ADJUST FRAME & RING CASTING (MANHOLE)
EACH
$513.41
6
5
0
$2,567.05
27
2521.501
4" CONCRETE WALK
SQ FT
$3.90
3800
3618.94
0
$14,113.87
28
2521.511
2.5" BITUMINOUS WALK
SQ FT
$2.18
405001
42399
0
$92,429.82
29
2531.501
CONCRETE CURB & GUTTER DESIGN SPECIAL
LIN FT
$19.25
3251
243
0
$4,677.75
30
2531.618
TRUNCATED DOMES
SQ FT
$42.78
96
84
0
$3,593.52
31
2531.618
TRUNCATED DOMES - SPECIAL
SQ FT
$48.13
32
60
0
$2,887.80
32
2557.501
4' CHAIN LINK FENCE VINYL COATED (BLACK)
LIN FT
1 $29.00
650
742.83
104.83
$21,542.07
33
2557.602
REPAIR DOG FENCE
EACH
$273.00
2
0
0
$0.00
34
2563.601
TRAFFIC CONTROL
LUMP SUM
$4,171.43
1
1
0
$4,171.43
35
2565.602
RELOCATE PEDESTRIAN PUSH BUTTON
EACH
$588.28
1
1
0
$588.28
36
12571.6021
TREE PROTECTION
EACH
$295.12
3
0
0
$0.00
37
2573.502
SILT FENCE, TYPE MACHINE SLICED
LIN FT
$1.83
4500
4392
0
$8,037.36
38
2573.530
STORM DRAIN INLET PROTECTION
EACH
$224.60
5
8
0
$1,796.80
39
2575.502
SEED MIXTURE 260
POUND
$1.71
250
235
0
$401.85
40
2575.505
SODDING, TYPE LAWN (INCL. TOPSOIL & FERT.)
SQ YD
$4.07
40001
3176
0
$12,926.32
41
2575.501
SEEDING (INCL TOPSOIL & FERTILIZER)
ACRE
$590.24
1.5
1.45
0
$855.85
42
2575.523
EROSION CONTROL BLANKETS CATEGORY 3
SQ YD
$1.00
7000
7076
0
$7,076.00
43
12582.5031
CROSSWALK MARKING -EPDXY
SQ FT
$12.06
1441
324
0
$3,907.44
Totals For Bituminous Trail Improvements:
$339,372.94
Project Totals:
$339,372.94
Page 2 of 3
Project Payment Status
Owner: City of Rosemount
Client Project No.: 434
Client Contract No.:
Project No.: 01916 -22
Contractor: Max Steininger, Inc.
Contract Changes
No.
Type I Date I Description
Amount
Change Order Totals:
1 $0.00
Pa ment Summa
No.
From
To Date
Payment
Total
Retainage
Total
Total
Work
Total Work
Date
Payment
Per
Retainage
Payment +
Certified Per
Certified
Payment
Retainage
Payment
1
7/30/2012
7/31/2012
$8,945.10
$8,945.10
$470.79
$470.79
$9,415.89
$9,415.89
$9,415.89
2
8/1/2012
8/31/2012
$170,792.43
$179,737.53
$8,989.08
$9,459.87
$189,197.40
$179,781.51
$189,197.40
3
9/1/2012
10/31/2012
$139,641.52
$319,379.05
$7,349.55
$16,809.42
$336,188.47
$146,991.07
$336,188.47
4 &
FINAL
11/1/2012
2/20/2013
$19,993.89
$339,372.94
($16,809.42)
$0.00
$339,372.94
$3,184.47
$339,372.94
Payment Totals:
$339,372.94
$0.00
$339,372.94
$339,372.94
Project Summary
Material On Hand:
Total Payment to Date:
Total Retainage:
Total Amount Earned:
$0.00
$339,372.94 Original Contract:
$0.00 Contract Changes:
$339,372.94 Revised Contract:
$325,797.71
$0.00
$325,797.71
Page 3 of 3
ROSEMOUNT
M>
D
>O O
a
POND o 2
144 ry
U U U G� = U.
PUBLIC WORKS DEPARTMENT
M
M
138TH
W %', —�+
Q U
m
CUR
Z
j
=
ST
W
`
CT =
U
Lions WAY DERBY
c/11P RgNT
�P
�P�t�0
Q
7 Q
CONN9�
Q
PPS" 3
V
c-,
-�
N
Connemara
W �
0
co
CRESCENT ciR
w
Q-
CL
Schv
O
c
F� 7�
Park _
�
o
V
O
Cf AE
aw
Zo 9G ��
ST W
U
COPPER POND
rn
-
Family
Res Ctr
-7
Y
RZMpV� "p
J�
CROCUS WAY
'"
00 pp,1
P
141ST
Z
Carrolls
OE
<)
CT W
PNc4
�,p�
0
Woods
LU c J
DAVENPORT
CT
G�"
Park
�
QarK
Dara ®
0
2
v
> DAVENPORT PATH
9
146TH ST W
Uj
t-
J
Z
° =
<
pF.�pN
w
W
147TH ST W
m
143RD ST W
143RD ST W
>
143RD
�� SN
N
—� >
Q Q
d
�
OORANT
�
'Q
Ix W
Y o
p W HAWKINS ��z
��
u'p
O WAY
v
LU >
m Z
UPPER
M>
D
>O O
a
POND o 2
144 ry
U U U G� = U.
O
O
UPPER 149TH ST W
144TH
ST W
Z
j
2
C'�
ST
W
UJI W
Z Q
U
Lions WAY DERBY
O
k
144TH
Q
0
145TH ST W
CRESCENT ciR
1
U 145TH
ST W
U 145TH ST W U 145TH
Family
Res Ctr
0
0
> sT w
ooh COBALT DW
w
< LU
Z
Y j
�f j,
0
deC �
LU c J
Q
< J ��,
LLJ
�
QarK
Dara ®
0
2
v
146TH ST W
Uj
t-
J
Z
° =
<
4A
W
147TH ST W
U
o
Q
o
147TH ST W °
�� SN
N
d
:1
W
W
p
148TH ST W
v
00
UJI
LU
o
dd%es 9`
w J
Q
0
U. 148TH ST W
U. 148TH
Odd s
D
N Z
Z
U
Chippendale
�a
=
'q
�
ST W
D
k
M>
D
>O O
�y 149TH ST W m
U.150TH ST W�
m
U U U G� = U.
UPPER 149TH ST W
U. 149TH ST W U
150TH ST W
DECEMBER
UJI W
Z Q
Lions WAY DERBY
O
k
e Park o
0 410 820 1,640 2,460 3,280
Feet '
T: /GIS /City /Maps /Departmental Maps /Engineering /Chris /Location Map - 434 i February 2012