HomeMy WebLinkAbout6.g. Order Project/Authorize Plans and Specifications - Prestwick Place 8th Addition, City Project 450"'ISEMOUt EXECUTIVE SUMMARY
CITY COUNCIL
City Council Meeting: April 16, 2013
AGENDA ITEM: Order Project / Authorize Plans and
Specifications — Prestwick Place 8th
AGENDA SECTION:
Addition Street and Utility Improvements,
Consent
City Project 450
PREPARED BY: Andrew J. Brotzler, PE, Director of Public
Works / City Engineer
AGENDA NO.
J
ATTACHMENTS: Resolution; Map
APPROVED BY:
RECOMMENDED ACTION: Motion to Adopt a Resolution Ordering the Project, and
Authorizing the Plans and Specifications for the Prestwick Place 8th Addition Street and
Utility Improvements, City Project 450.
BACKGROUND:
Prestwick Place 8" Addition is a residential neighborhood with 33 single - family homes located west of
Akron Avenue and north of Connemara Trail. The total estimated construction cost for Prestwick Place
8th Addition is $528,482, which includes a 10% contingency. The entire project cost, including all indirect
costs, will be funded by the developer, D.K Horton, Inc.
SUMMARY:
Staff recommends Council adoption of a resolution ordering the project and authorizing the preparation
of plans and specifications for Prestwick Place 8" Addition Street and Utility Improvements, City Project
450.
G: \ENGPROJ \450 \Council Items \20130416 CC Order Project Auth Plans & Specs.docx
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2013-
A RESOLUTION ORDERING PROJECT AND
AUTHORIZING THE PREPARATION OF THE PLANS AND SPECIFICATIONS FOR
PRESTWICK PLACE 8T" ADDITION STREET AND UTILITY IMPROVEMENTS
CITY PROJECT 450
WHEREAS, the City Council deemed it necessary and expedient that the City of Rosemount, Minnesota,
construct certain improvements, to -wit: City Project 448, Prestwick Place 8" Addition Street and Utility
Improvements as described in and in accordance with the feasibility report prepared by the City Engineer,
and
WHEREAS, the City Council has been advised bythe City Engineer that said street and utility
improvements are feasible and should best be made as proposed, and the City Engineer's report to this
effect has heretofore been received by Council, and filed with the City Clerk on April 16, 2013.
NOW THEREFORE BE IT RESOLVED, the City Council of the City of Rosemount hereby orders the
improvements of the Prestwick Place 8`h Addition Street and Utility Improvements, City Project 450.
BE IT FURTHER RESOLVED, the City Engineer is hereby ordered to prepare plans and specifications
for the making of such improvements within the Prestwick Place 8" Addition.
ADOPTED this 16`h day of April, 2013.
William H Droste, Mayor
ATTEST:
Amy Domeier, City Clerk