Loading...
HomeMy WebLinkAbout6.j. Change Order #1 – 2013 Street Improvement Project, City Project 445�*- ESEMOUl V 1 EXECUTIVE SUMMARY CITY COUNCIL City Council Meeting: April 16, 2013 AGENDA ITEM: Change Order 1 — 2013 Street AGENDA SECTION: Improvements Project, City Project 445 Consent PREPARED BY: Andrew J. Brotzler, PE, Director of P is AGENDA NO. Works / City Engineer ATTACHMENTS: Change Order 1 and Location Map APPROVED BY: RECOMMENDED ACTION: Motion to Approve Change Order 1 for the 2013 Street Improvements Project, City Project 445. BACKGROUND: Attached for Council consideration is Change Order 1 for the 2013 Street Improvements Project, City Project 445. Change Order 1 is a modification to the contract schedule and allows the contractor to work on 155`h Street and Danville Avenue at the same time. The change will allow the mill and overlay portion of the project to be complete by June 1, 2013, or a total length of 34 calendar days if the project is delayed due to weight restrictions. Below is the anticipated project schedule if weight restrictions are removed by April 29, 2013. Carrollton Addition .................April 29, 2013 — May 13, 2013 155`h Street ...........................May 14, 2013 — May 31, 2013 Danville Avenue ......................May 14, 2013 — May 31, 2013 No change to the contract price is required with Change Order 1. SUMMARY: Staff recommends Council approval of Change Order 1 for the 2013 Street Improvements Project, City Project 445. GAF.NGPR0J \445 \Counci1 Items \20130416 CC ChangeOrdertdocx 2013 STREET IMPROVEMENT PROJECT CITY ROSEMOUNT PROJECT NO. 445 WSB PROJECT NO. 1916 -75 OWNER: CITY OF ROSEMOUNT 2875 - 145TH STREET WEST ROSEMOUNT, MN 55068 CHANGE ORDER NO. 1 CONTRACTOR: VALLEY PAVING, INC. 8800 13TH AVENUE EAST SHAKOPEE, MN 55379 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: 4/16/2013 IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES CHANGING THE SUBSTANTIAL COMPLETION DATE FOR PHASE 1 (CARROLLTON ADDITION), PHASE 2 (155TH STREET), & PHASE 3 (DANVILLE AVENUE) TO JUNE 1, 2013 OR A TOTAL OF 34 WORKING DAYS IF THE PROJECT IS DELAYED DUE TO WEIGHT RESTRICTIONS. WORK IN PHASE 2 & PHASE 3 MAY BE CONCURRENT. EACH PHASE SHALL BE SUBSTANTIALLY COMPLETE WITHIN 28 CALENDAR DAYS OF INITIATION. NO ADDITIONAL COSTS ARE INCURRED DUE TO THE SCHEDULE CHANGE DESCRIBED ABOVE. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: ORIGINAL CONTRACT PRICE: $507,044.85 ORIGINAL CONTRACT TIME: 7/31/2013 PREVIOUS CHANGE ORDERS: NA $0.00 NET CHANGE FROM PREVIOUS CHANGE ORDERS: NONE CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: $507,044.85 CONTRACT TIME PRIOR TO THIS CHANGE ORDER: 7/31/2013 NET DECREASE OF THIS CHANGE ORDER: $0.00 NET DECREASE WITH CHANGE ORDER: -60 DAYS CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: $507,044.85 CONTRACT TIME WITH APPROVED CHANGE ORDERS 6/1/2013 RECOMMENDED BY: APPROVED BY: PHIL OLSON, PE, PROJECT MANAGER CONTRACTOR SIGNATURE WSB & ASSOCIATES, INC. VALLEY PAVING, INC. ENGINEER CONTRACTOR APPROVED BY: CITY ENGINEER CITY ADMINISTRATOR DATE OF COUNCIL ACTION Ilgvnas011projects101916- 75014dminIConstruction AdminlChange Orders11916 -75 Change Order 1.xisCO.1 V/ U Q a Z 0 G M M (i D cz G AR � OPv Y� pAZN � DAN SH v CROCUS DA NPORT CT W �Cz PN9FA C p< uJ G > AVENPORT PATH DFSt`�ta =Pj Q G u m 143RD ST W 143RD ST j LQ ST W ri `` 139TH 7 1 7 ; 140TH ST W n u c z o x' c; 142ND ST W W 4 -� ORAN _ <1 o 0 o_ w w v N a UPPER 143RD a o �0 1d4j m a ti s o 14 144TH T > r W ¢ w w 0 14 T T CR CENT CI 45TH ST ' wT uJ w a w t- w $ Mw� D U Q W > G r J x Q d LL J C3 J > a o Q o 147TH S d Q w � 9 C� U. 1487 o D ST W p U. 49H ST W m DECEMBER WAY DERBY Fy F CIR DA ooR DECEMBERTR 0,1kjPF CT 151ST T W LIryG Cr ERR'i 152ND CT OE�S [tl 153RD S ®A /V 1 a 6 CU 154TH CT z 1S m OQ 0 155 H W IRS 156TH ST W _ o d LU COBALT J-� Q 146TH ST W d U 1467 L. 147TH n v� 146TH ST W > LOWE 147TH ST 147TH ST W Lu 147TH z 4AGTIJ CT 1A1 Z 1 1 d 160TH ST W (CSAH 46) � J r w r '¢ 149TH L ° TW UCH L. 150TH ST IS, S 3 J 0 U 153RD ST W CHILI CT 1 Pq N ,jetH SrN✓ �® A S A W 01, Q u, 0 J M M �CROSEMOUNT 1 2013 Street Improvement Project I x MINNESOTA I ON, Mill & Overlay BRI