Loading...
HomeMy WebLinkAbout6.g. Receive Bids/Award Contract – Trunk Highway 3 Underpass, City Project 443ROSEMOUNTEXECUTIVE SUMMARY CITY COUNCIL City Council Meeting: May 7, 2013 AGENDA ITEM: Receive Bids /Award Contract — Trunk AGENDA SECTION: Highway 3 Underpass, City Project 443 Consent PREPARED BY: Andrew J. Brotzler, PE, Director of P AGENDA NO. Works /City Engineer ATTACHMENTS: Resolution; Letter of Recommendation; APPROVED BY: Bid Summary; Map RECOMMENDED ACTION: Motion to Adopt a Resolution Receiving Bids and Awarding Contract for the Trunk Highway 3 Underpass, City Project 443 BACKGROUND: On Friday, April 26, 2013, four bids were received for the Trunk Highway (TI-i) 3 Underpass Project and read aloud publicly. The low bidder is Minnesota Dirt Works, Inc. who submitted a base bid in the amount of $745,894.17. The low base bid amount of $745,894.17 is 13.5% lower than the estimated construction cost of $862,152.70. The TH 3 Underpass project includes the construction of a 124 foot long pedestrian underpass under TH 3, approximately 360 feet north of 142nd Street, which will connect the Rosemount High School property to the GlenRose of Rosemount neighborhood and nearby Erickson Park. SUMMARY: Staff recommends that Council adopt the attached resolution receiving the bids and awarding the contract for the TH 3 Underpass Project, City Project 443. G: \ENGPR0J \443 \Counci1 Items \20130507 CC Receive Bids -Award Contract.docx CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2013 — A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR THE TRUNK HIGHWAY 3 UNDERPASS PROJECT CITY PROJECT 443 BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1. All bids on construction of the Trunk Highway 3 Underpass Project are hereby received and tabulated. 2. Based on the Base Bid, the bid of Minnesota Dirt Works, Inc. in the amount of $745,894.17 for the construction of said improvements is in accordance with the plans and specifications and advertisement for bids, and is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowest bidders shall be retained until a contract has been executed. ADOPTED this 7th day of May, 2013. William H Droste, Mayor ATTEST: Amy Domeier, City Clerk A WSB SO engineering -planning • environmental • construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763 - 541 -4800 Fax: 763 -541 -1700 April 30, 2013 Honorable Mayor and City Council City of Rosemount 2875 — 145th Street West Rosemount, MN 55068 Re: TH 3 Trail and Underpass S.A.P. 208 -010 -009 City of Rosemount Project No. 443 WSB Project No. 1916 -68 Dear Mayor and Council Members: Bids were received for the above - referenced project on Friday, April 26, 2013, and were opened and read aloud. Four bids were received. The bids were checked for mathematical accuracy and tabulated. Please find enclosed the bid tabulation indicating the low bid as submitted by Minnesota Dirt Works, Inc., Burnsville, MN, in the amount of $745,894.17. The Engineer's Estimate was $862,152.70. We recommend that the City Council consider these bids and award a contract in the amount of $745,894.17 to Minnesota Dirt Works, Inc. based on the results of the bids received. Sincerely, WSB & Associates, Inc. Nicholas E. Hentges, PE Project Manager Enclosures cc: Daniel Ames, Minnesota Dirt Works, Inc. Andy Brotzler, City of Rosemount St. Cloud • Minneapolis • St. Paul Equal Opportunity Employer wsbeng.com K: \01916 -68RAd min \C...tm,&m Admle\1.7R RECNEvMN•Ymee -042613.do WSB & Associales, Inc. BID TABULATION SUMMARY Project: TH 3 Trail and Underpass Location: Rosemount, MN S.A.P. 208 - 010 -0091 C.P. No. 443 WSB Project No. 1916 -68 Date: April 26, 2013, 10:00 a.m. Bid Contractor Security Total Roadway 1 Minnesota Dirt Works, Inc. X $745,894.17 ** 2 Pember Companies, Inc. X $750,260.75 3 Redstone Construction X $880,606.49 4 Max Steininger, Inc. X $918,425.90 Engineer's Estimate $862,152.70 1 hereby certify that this is a true and correct tabulation of the bids as received on April 26, 2013. Nicholas E. HentgerTE, Project Manager ** Denotes corrected figure z a ` a - LL _- O ° A Fyn Vlk � , U i w U Z r I ow _ a �o � CO ww O� " i. «. mU w CL ■ ■ w i °moo SO o �_ U) acn ■ .■■ w zr rH a ra D(n Z �a w� 0o 0 �pN (bMN o o w � o Cl. a D i z r (tm ¢� N =IL Q w n C7 cn Of _ Lu w y 0 z Z oZ o, co r 1 0 � cn a w a _ as 0,F-¢ cn ama L LL, , Q� w ? a a= j §3 av G � i •yy