Loading...
HomeMy WebLinkAbout6.h. Receive Bids/Award Contract – 149th Street West Improvements, City Project 446RCJSEMOUNT EXECUTIVE SUMMARY CITY COUNCIL City Council Meeting: May 7, 2013 AGENDA ITEM: Receive Bids /Award Contract — 149th AGENDA SECTION: Street West Improvements, City Project Consent 446 PREPARED BY: Andrew J. Brotzler, PE, Director of lic AGENDA NO. Works /City Engineer ATTACHMENTS: Resolution; Bid Summary; Letter of Ole, APPROVED BY: Recommendation; Map OA I RECOMMENDED ACTION: Motion to Adopt a Resolution Receiving Bids and Awarding the Contract for the 149th Street West Improvements, City Project 446. BACKGROUND: On Friday, April 26, 2013, ten bids were received for the 149"' Street West Improvements Project and read aloud publicly. The low bidder is Ryan Contracting Company who submitted a base bid in the amount of $806,815.70. The low base bid amount of $806,815.70 is 10.5% lower than the estimated construction cost of $901,699.50. This project involves the construction of a frontage road along the north side of 150`'' Street West (CSAH 42) from Business Parkway to Biscayne Avenue. This frontage road will provide access to future commercial business in the area, and is included as part of the Municipal State Aid system for Rosemount. SUMMARY: Staff recommends that Council adopt the attached resolution receiving the bids and awarding the contract for the 149`h Street West Improvements Project, City Project 446. G: \ENGPR0J \446 \Counci1 Items \20130507 CC Receive Bids -Award Contract.docx CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2013 - A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR THE 1491h STREET WEST IMPROVEMENTS PROJECT CITY PROJECT 446 BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1. All bids on construction of the 149`" Street West Improvements Project are hereby received and tabulated. 2. Based on the Base Bid, the bid of Ryan Contracting Company in the amount of $806,815.70 for the construction of said improvements is in accordance with the plans and specifications and advertisement for bids, and is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowest bidders shall be retained until a contract has been executed. ADOPTED this 7"' day of May, 2013. William H. Droste, Mayor ATTEST: Amy Domeier, City Clerk �� /A YYS :.,.,.i,,, engineering- planning- environmental- construction April 26, 2013 Honorable Mayor and City Council City of Rosemount 2875 — 145th Street West Rosemount, MN 55068 Attn: Jean Harrington/Karin Kladar, Public Works Re: 149t' Street Improvements S.A.P. 208 -136 -001 / S.A.P. 208 - 137 -001 City of Rosemount Project No. 446 WSB Project No. 1916 -80 Dear Mayor and Council Members: 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763 - 541 -4800 Fax: 763 -541 -1700 Bids were received for the above - referenced project on Friday, April 26, 2013, and were opened and read aloud. 10 bids were received. The bids were checked for mathematical accuracy and tabulated. Please find enclosed the bid tabulation indicating the low bid as submitted by Ryan Contracting Co. of Elko, MN, in the amount of $806,815.70. The Engineer's Estimate was $901,699.50. We recommend that the City Council consider these bids and award a contract in the amount of $806,815.70 to Ryan Contracting Co. based on the results of the bids received. Sincerely, WSB & Associates, Inc. Qa4o,�-, Phil Olson, PE Project Manager Enclosures cc: Thomas Ryan, Ryan Contracting Co. Andy Brotzler, City of Rosemount srb /ef St. Cloud • Minneapolis • St. Paul Equal Opportunity Employer wsbeng.com K1019164OOM,WConsnu rm AdmWLTR RECUVfDTN -hm 042613.do BID TABULATION SUMMARY PROJECT: 149th Street Improvements S.A.P. 208 - 136 -001 / S.A.P. 208 - 137 -001 City Project No. 446 OWNER: City of Rosemount, MN WSB PROJECT NO.: 1916 -80 BIDS OPENED: Friday, April 26, 2013, at 11:00 a.m. Bid Bond Add. No. 1 Contractor (5 %) Rec'd. Grand Total Bid 1 Ryan Contracting Co. X X * $806,815.70 2 Friedges Contracting Co., LLC X X * $815,857.80 3 R.L. Larson Excavating X X $825,230.50 4 Heselton Construction, LLC X X $837,788.00 5 McNamara Contracting, Inc. X X $864,494.55 6 Douglas -Kerr Underground, LLC X X * $870,248.70 7 A -1 Excavating, Inc. X X $879,941.00 8 Redstone Construction Co., Inc. X X $882,749.95 9 Minger Construction, Inc. X X * $909,963.70 10 Northdale Construction Co., Inc. X X * $918,861.63 Engineer's Opinion of Probable Cost $901,669.50 I hereby certify that this is a true and correct tabulation of the bids as received on April 26, 2013. * Denotes corrected figure Philip C. Olson, PE, Project Manager K. 101916- 800WminlConstruction Adminli916 -80 Bid Tab Summary- 042613 R 0 455 910 1,820 2,730 3,640 N Feet A T: /GIS /City /Maps /Departmental Maps /Engineering /Chris /Location Map - 446 !•l1Vi� January 2013