Loading...
HomeMy WebLinkAbout6.i. Receive Bids/Award Contract – Trunk Highway 3 Underpass, City Project 443Ak-11SEMOU r 1 EXECUTIVE SUMMARY CITY COUNCIL City Council Meeting: May 21, 2013 AGENDA ITEM: Receive Bids /Award Contract — Trunk AGENDA SECTION: Highway 3 Underpass, City Project 443 Consent PREPARED BY: Andrew J. Brotzler, PE, Director of lic AGENDA NO. Works /City Engineer ; ATTACHMENTS: Resolution; Letter of Recommend a ion; APPROVED BY: Bid Summary; Work Order 1; Map RECOMMENDED ACTION: Motion to Adopt a Resolution Receiving Bids and Awarding Contract for the Trunk Highway 3 Underpass, City Project 443 And Motion to Approve Work Order 1 for Trunk Highway 3 Underpass, City Project 443 BACKGROUND: On Friday, April 26, 2013, four bids were received for the Trunk Highway (TH) 3 Underpass Project and read aloud publicly. The low bidder is Minnesota Dirt Works, Inc. who submitted a base bid in the amount of $745,894.17. The low base bid amount of $745,894.17 is 13.5% lower than the estimated construction cost of $862,152.70. The TH 3 Underpass project includes the construction of a 124 foot long pedestrian underpass under TH 3, approximately 360 feet north of 142nd Street, which will connect the Rosemount High School property to the G1enRose of Rosemount neighborhood and nearby Erickson Park. To clarify from previous Council discussions, lighting is included with this plan. Additional electrical work and lighting specifications have been added to the contract as part of Work Order 1. This work order results in a net increase of $3,539.25 (0.5 % of the original contract amount) for a revised contract amount of $749,443.42. Work Order 1 has been approved by MnDOT Estimating. Construction is anticipated to begin June 10, 2013. The start date is based on coordination with the school district and their request to begin construction after graduation. The project will be substantially complete by August 31, 2013. During construction, the roadway will be excavated to install the underpass. This will require traffic to be shifted from one side of the road to the other depending on the location of the excavation. Additionally, dim lanes will be transitioned to the shoulders and the center turn lane will be removed. SUMMARY: Staff recommends that Council adopt the attached resolution receiving the bids and awarding the contract for the TH 3 Underpass Project, City Project 443 and approve Work Order 1 for the TH 3 Underpass Project, City Project 443. G: \ENGPR0J \443 \Counci1 Items \20130521 CC Receive Bids -Award Contract.docx WSB engineering• planning • environmental- construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763- 541 -4800 Fax: 763 -541 -1700 April 30, 2013 Honorable Mayor and City Council City of Rosemount 2875 — 145th Street West Rosemount, MN 55068 Re: TH 3 Trail and Underpass S.A.P. 208-010-009 City of Rosemount Project No. 443 WSB Project No. 1916 -68 Dear Mayor and Council Members: Bids were received for the above - referenced project on Friday, April 26, 2013, and were opened and read aloud. Four bids were received. The bids were checked for mathematical accuracy and tabulated. Please find enclosed the bid tabulation indicating the low bid as submitted by Minnesota Dirt Works, Inc., Burnsville, MN, in the amount of $745,894.17. The Engineer's Estimate was $862,152.70. We recommend that the City Council consider these bids and award a contract in the amount of $745,894.17 to Minnesota Dirt Works, Inc. based on the results of the bids received. Sincerely, WSB & Associates, Inc. Nicholas E. Hentges, PE Project Manager Enclosures cc: Daniel Ames, Minnesota Dirt Works, Inc. Andy Brotzler, City of Rosemount St. Cloud • Minneapolis n St. Paul Equal Opportunity Employer wsbeng.com K:W19I64WkAdnin \Constmenon Adndn\LTR RECMMDTN -hm 042613.doe M AW & Associutes, Inc. BID TABULATION SUMMARY Project: TH 3 Trail and Underpass Location: Rosemount, MN S.A.P. 208 - 010 -009 / C.P. No. 443 WSB Project No. 1916 -68 Date: April 26, 2013, 10:00 a.m. Bid Contractor Security Total Roadway 1 Minnesota Dirt Works, Inc. X $745,894.17 ** 2 Pember Companies, Inc. X $750,260.75 3 Redstone Construction X $880,606.49 4 Max Steininger, Inc. X $918,425.90 Engineer's Estimate $862,152.70 1 hereby certify that this is a true and correct tabulation of the bids as received on April 26, 2013. Nicholas E. HentgewTE, Project Manager ** Denotes corrected figure STATE AID FOR LOCAL TRANSPORTATION Rev. July 2010 WORK ORDER FOR MINOR EXTRA WORK Page t of 1 SP 20 8-010 -009 / SP 1921 -96 1 Minn. Proj. No. ( ) 7 Project Location: Civic Campus Connector Trail _ Local Agency: Rosemount Local Project No. CP 443 Contractor: Minnesota Dirt Works Contract No. Address /City/State /Zip: 2500 West County Road 42 Suite 105, Burnsville, MN 55337 LIN Fr 3,539.25 In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the work as altered by the following provisions: After field observations of the existing conditions for connecting the proposed lighting system to an existing power source the Engineer has determined that additional material and labor, above that assumed for the Lump Sum bid price for the lighting system item, will be required. The item Lighting System by the Lump Sum will be increased by $3,539.25. The itemization of the increase to the Lump Sum amount is shown below. It is further understood that the attached lighting system specification shall become part of the Contract documents. ESTIMATED INCREASE IN COST-SAP 208 -010 -009 / CP 443 Item No. Description Unit Unit Price Quantity Amount 2.0" RIGD STEEL, CONDUIT LIN Fr $15.25 60 $915.00 UNDERGROUND WIRE 1 COND NO 2 LIN Fr $4.90 225 $1,102.50 FFFA POM AND PEDESTAL EACH $1 .00 1 $1,200.00 10% PRIME CONTRACrOR ALLOWANCE $321.75 ITOTAL L 1CREASE SAP 208 -010 -009 / CP 443 S3 39.25 ITOTAL ADJUSTMINP SAP 208 -010 -009 J CP 443 53,539.25 OK MN /Dot Estimating EDF 5--15 -13 (X) Is NOT changed ( ) Is Increased by _ ( ) Is Decreased by ( ) May be revised if work affected the controlling operation Working Days { ) Is Increased by Calendar Days . Working Days { ) Is Decreased by Calendar Days Approved by Project Engineer: Print Name: Approved by Print Name: Date: 5- /5 Date: Phone: Approved by Contractoo_��¢>� _w Date: Print Name: Phone: Distribution: Project Engineer (Original), Contractor (copy), DSAE (copy for funding review) DSAE Portion: The State of Minnesota Is not a participant in this contract. Signature by the District State Aid Engineer Is for FUNDING PURPOSES ONLY and for compliance with State and Federal Aid Rules /Policy. Eligibility does not guarantee funds will be available. This work is eligible for: _ Federal Funding _ State Aid Funding _ Local funds District State Aid Engineer: Date: LLP of w w LU U) 0 C- oo LU z U) 02 UJI4 0— Q� LL, a- :3 , 0 D F- cr, �- < 0 U) rL ;n- n Lil U) ♦ G- o < LU IL jr LU < "0 2LU LL LL > 0 x z 02 Lu LU z U) 02 UJI4 0— Q� LL, a- :3 , 0 D F- cr, �- < 0 U) rL ;n- n Lil U) ♦ G- o < LU IL jr