Loading...
HomeMy WebLinkAbout7.c. Erickson Park Playground Replacement, ROSEMOU r 1 EXECUTIVE SUMMARY PARKS AND RECREATION COMMISSION Parks and Recreation Commission Special Meeting: May 29, 2013 AGENDA ITEM: Erickson Park Playground Replacement AGENDA SECTION: New Business PREPARED BY: Dan Schultz, Parks and Recreation Director AGENDA NO. 7 c. ATTACHMENTS: Site Plan APPROVED BY: RECOMMENDED ACTION: None, discussion only. ISSUE At our meeting in April of 2013, we discussed the replacement of the playground equipment at Erickson Park. The area where the old equipment was located was between the parking lot and field #1. Included in the packet is a site plan that shows the new road, turn around and parking lot. The site plan also identifies other existing amenities on the site. Due to the tight spacing of fields 1 - 3, if we place a new playground in the area where it had been located, we need to carefully review how close it is to the parking lot and also the possibility of baseballs and softball landing near or in the playground area. SUMMARY At the meeting on Monday, staff would like to share some ideas about where the equipment might be located and how we could make the space a safe place to play. 5 d 9 N 2 0 1.Canh Are�uu EOS Sf1 M� WSB 0 0 BRAZIL AVENUE IMPROVEMENTS STREET & UTILITY CONSTRUCTION ROSEMOUNT, MINNESOTA 01 N I o o; N Z Q O N S i n a m z 3 N 2 0 1.Canh Are�uu EOS Sf1 M� WSB 0 0 BRAZIL AVENUE IMPROVEMENTS STREET & UTILITY CONSTRUCTION ROSEMOUNT, MINNESOTA 01 N