HomeMy WebLinkAbout2.B. Splash PadROSEMOUNTEXECUTIVE SUMMARY CITY COUNCIL City Council Special Work Session Meeting: June 25, 2013 AGENDA ITEM: Splash Pad AGENDA SECTION: Discussion PREPARED BY: Dan Schultz, Parks and Recreation AGENDA NO. �. Director ATTACHMENTS: Concept Plans and Cost Estimates APPROVED BY: RECOMMENDED ACTION: Discussion only. ISSUE During a Parks and Recreation Commission meeting on April 2, 2013, the Commission recommended to the City Council that they look to further investigate Schwarz Pond Park and Central Park for the site of a future splash pad. It was also recommended that they not rule out purchasing other land for sale in Rosemount and to also consider all other City land that is available. At the April 7, 2013 City Council work session, Council directed staff to come up with a concept for Schwarz Pond Park and a few concepts for Central Park. Also requested were cost estimates for the each of the concept plans. Included in the packet are four concept plans and cost estimates for each. Each of the concepts plans could be broken into multiple phases and developed over time. The Parks and Recreation Commission will be reviewing the concept plans on Monday, June 24, 2013 and making a recommendation to the City Council at their meeting. BACKGROUND One of the City Council Goals for 2012 -2013 is to enhance the Downtown area with additional public amenities and improvements. One of the identified improvements in the goals for 2013 -2014 is a splash pad. A splash pad is an area for water play that has little or no standing water. Typically there are ground nozzles that spray water upwards out of the splash pad's deck. There may also be other water features such as a rainbow (semicircular pipe shower) or a mushroom shower. Some splash pads feature movable nozzles that allow users to spray others. The showers and ground nozzles are often controlled by a hand activated - motion sensor, and run for a limited time. Typically the water is either freshwater, or recycled and treated water. SUMMARY Staff would like for the City Council to review the concept plans and provide feedback to staff. LCgJUTRALAPA R 4 ROSEMOUNT MINNESOTA OPTION ONE SPLASH PAD 1,500 sqft SHADED SEATING OPEN LAWN FUTURE RELOCATED MEMORIAL TRAILS FUTURE RENOVATED PARKING LOT 145th St Sw 10l X®iaAvaoe south, suite 300 - Tel ('163) 54100 416 WSgFa 6) 541 -L]00 {— R.ject.-6 -9'10 &Aseoc. -Inc Dme_hve2{hh, 2913 1 T, 1 1 El 0' 30' 60' 120' NGraphic Scale L ROSEMOUNT 0 1 MINNESOTA OPTION TWO "GROUND SPRAY" SPLASH PAD (WITH ABILITY TO FLOOD FOR WINTER SKATING) 7,000 sqft SHADED SEATING y TRAILS OF OPP � _ f EXISTING 6 PARKING LOT �� A -ADD TREE ISLANDS WHEN PARKING IS EXPANDED 145th St Sw - 101 XF3'5 54L o'F",suite 300 Atimeapolis, MN 55416 WSBT 63) 5411 Faz (163) -L]00 Roject.0 6 -9'10 &ASrx._.1 ­­,- I 1 i' �r. i i i I I I I 'I i 0' 30' 60' 120' NGraphic Scale L ROSEMOUNT 0 1 MINNESOTA OPTION THREE PLAYGROUND AREA (Improved in future) SHADED SEATING SPLASH PAD 3,300 sqft TRAILS EXISTING PARKING LOT -ADD TREE ISLANDS WHEN PARKING IS EXPANDED 145th St Sw - 101 xF3'5 54L 8'F",suite 300 Ativveapolis, MN 55416 WSBT 63) 5411 Faz (163) -L]00 - ject.0 6 -9'10 &ASrx._.1 Dme_hue2gh,2 ;f 4 jt ter. 1 0' 30' 60' 120' NGraphic Scale SCHWARZ POND PARK J44ROSEMOUNT -010mvi MINNESOTA RETAINING WALL- - EXISTING PLAYGROUND DROPOFF WSB a a-1— IRISH SPORTS DOME RESTROOM BUILDING DECK WITH SEATING SPLASH PAD 2600 sqft ACCESSIBLE TRAIL s ' CONNECTION � I 0 60 120' Ga s.k Central Park Recreation and General Site Improvement Concept Development - Estimate of Cost to Construct Option One Phase One Improvements Item # Description Estimated Cost . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Removals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,000.00 2 Earthwork $ 2,000.00 3 Utilities $ 46,000.00 4 Electrical $ 20,000.00 5 Splash Pad $ 210,000.00 6 Site Amenities $ 98,500.00 7 Restoration $ 4,700.00 8 Relocation of hockey rink with lights $ 125,000.00 Subtotal $ 507,200.00 Contingency $ 101,440.00 Design, Engineering and Testing $ 121,728.00 Total Phase One Improvements Future Improvements 730,368.00 Item # Description Estimated Cost . . . . . . . . . . . . . . . . . . . . . . . 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Elementary and Pre -K Play Areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100,000.00 2 Relocation of Memorial $ 30,000.00 3 Trail Adustments and Additions $ 25,000.00 4 Parking Lot Re- Configuration and Addition $ 451,000.00 5 Relocation of hockey rink with lights $ 125,000.00 6 Landscaping and Restoration $ 50,000.00 Subtotal $ 781,000.00 Contingency $ 156,200.00 Design, Engineering and Testing $ 187,440.00 Total Future Improvements $ 1,124,640.00 Grand Total Option One $ 1,855,008.00 Notes: * This estimate above includes a Splash Pad with a 'pass through' domestic water system. 'Pass through system' uses more water, but the water is essentially treated through the municipal system and reused. This option requires the least amount of monitoring and management of all splash pad systems. • The added cost for a 'recirculating water treatment system' could range from $130,000 to $156,000. 'Recirculating water treatment system' uses less water, but requires staff to hold pool certified operator license and requires more daily monitoring and management. The cost to implement this option is significant. • The added cost for a hybrid 'water capture & repurpose' system could range from $250,000 to $300,000. 'Water capture & repurpose system' uses similar amount of water as 'pass through' system, but the water is stored to use for irrigation or infiltration instead of treating the water on site. Space for subground tanks or onsite basins and mechanical systems for irrigation can significantly increase site impact and overall costs. WSB Project 01916 -970 Page 1 of 4 Central Park Recreation and General Site Improvement Concept Development - Estimate of Cost to Construct Option Two Phase One Improvements Item # Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Estimated Cost . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Removals $ 1,000.00 2 Earthwork $ 3,500.00 3 Utilities $ 42,000.00 4 Electrical $ 20,000.00 5 Splash Pad $ 256,000.00 6 Site Amenities $ 46,000.00 7 Restoration $ 6,200.00 8 Relocation of hockey rink with lights $ 125,000.00 Subtotal $ 499,700.00 Contingency $ 99,940.00 Design, Engineering and Testing $ 119,928.00 Total Phase One Improvements Future Improvements 719,568.00 -Item .# Description Estimated Cost 1 Trail Adustments and Additions $ 12,000.00 2 Parking Lot Re- Configuration and Addition $ 237,000.00 3 Relocation of Existing Hockey Rink with lights $ 125,000.00 4 Landscaping and Restoration $ 50,000.00 Subtotal $ 424,000.00 Contingency $ 84,800.00 Design, Engineering and Testing $ 101,760.00 Total Future Improvements $ 610,560.00 Grand Total Option Two $ 1,330,128.00 Notes: * This estimate above includes a Splash Pad with a 'pass through' domestic water system. 'Pass through system' uses more water, but the water is essentially treated through the municipal system and reused. This option requires the least amount of monitoring and management of all splash pad systems. • The added cost for a 'recirculating water treatment system' could range from $130,000 to $156,000. 'Recirculating water treatment system' uses less water, but requires staff to hold pool certified operator license and requires more daily monitoring and management. The cost to implement this option is significant. • The added cost for a hybrid 'water capture & repurpose' system could range from $250,000 to $300,000. 'Water capture & repurpose system' uses similar amount of water as 'pass through' system, but the water is stored to use for irrigation or infiltration instead of treating the water on site. Space for subground tanks or onsite basins and mechanical systems for irrigation can significantly increase site impact and overall costs. WSB Project 01916 -970 Page 2 of 4 Central Park Recreation and General Site Improvement Concept Development - Estimate of Cost to Construct Option Three Phase One Improvements -Item -# Description Estimated Cost 1 Removals $ 17,900.00 2 Earthwork $ 6,250.00 3 Utilities $ 42,000.00 4 Electrical $ 20,000.00 5 Splash Pad $ 218,000.00 6 Site Amenities $ 35,000.00 7 Restoration $ 8,600.00 Subtotal $ 347,750.00 Contingency $ 69,550.00 Design, Engineering and Testing $ 83,460.00 Total Phase One Improvements Future Improvements 500,760.00 -Item .# Description Estimated Cost 1 Trail Adustments and Additions $ 2,000.00 2 Parking Lot Re- Configuration and Addition $ 226,000.00 3 Relocation of Existing Hockey Rinks with lights $ 250,000.00 4 Landscaping and Restoration $ 25,000.00 5 Elementary and Pre -K Play Areas $ 100,000.00 6 Site Amenities $ 70,000.00 Subtotal $ 673,000.00 Contingency $ 134,600.00 Design, Engineering and Testing $ 161,520.00 Total Future Improvements $ 969,120.00 Grand Total Option Three $ 1,469,880.00 Notes: * This estimate above includes a Splash Pad with a 'pass through' domestic water system. 'Pass through system' uses more water, but the water is essentially treated through the municipal system and reused. This option requires the least amount of monitoring and management of all splash pad systems. • The added cost for a 'recirculating water treatment system' could range from $130,000 to $156,000. 'Recirculating water treatment system' uses less water, but requires staff to hold pool certified operator license and requires more daily monitoring and management. The cost to implement this option is significant. • The added cost for a hybrid 'water capture & repurpose' system could range from $250,000 to $300,000. 'Water capture & repurpose system' uses similar amount of water as 'pass through' system, but the water is stored to use for irrigation or infiltration instead of treating the water on site. Space for subground tanks or onsite basins and mechanical systems for irrigation can significantly increase site impact and overall costs. WSB Project 01916 -970 Page 3 of 4 Schwarz Pond Park Recreation and General Site Improvement Concept Development - Estimate of Construction Cost Improvements Item # Description Estimated Cost --------------------- ------------------------------------------------------------------------- Removals $ 1,250.00 2 Earthwork $ 5,500.00 3 Utilities $ 329,000.00 4 Splash Pad $ 212,000.00 5 Restroom building $ 115,000.00 6 Site Amenities $ 40,350.00 7 Parking Lot Renovation $ 16,000.00 8 Restoration $ 5,100.00 Subtotal $ 724,200.00 Contingency $ 144,840.00 Design, Engineering and Testing $ 173,808.00 Total Phase One Improvements $ 1,042,848.00 Notes: * This estimate above includes a Splash Pad with a 'pass through' domestic water system. 'Pass through system' uses more water, but the water is essentially treated through the municipal system and reused. This option requires the least amount of monitoring and management of all splash pad systems. * The added cost for a 'recirculating water treatment system' could range from $130,000 to $156,000. 'Recirculating water treatment system' uses less water, but requires staff to hold pool certified operator license and requires more daily monitoring and management. The cost to implement this option is significant. * The added cost for a hybrid 'water capture & repurpose' system could range from $250,000 to $300,000. 'Water capture & repurpose system' uses similar amount of water as 'pass through' system, but the water is stored to use for irrigation or infiltration instead of treating the water on site. Space for subground tanks or onsite basins and mechanical systems for irrigation can significantly increase site impact and overall costs. WSB Project 01916 -970 Page 4 of 4