HomeMy WebLinkAbout9.b. Trunk Highway 3 Road Detour – TH 3 Underpass Project, City Project 4434ROSEMOUNTEXECUTIVE SUMMARY CITY COUNCIL City Council Meeting: July 2, 2013 AGENDA ITEM: Trunk Highway 3 Road Detour — TH 3 AGENDA SECTION: Underpass Project, City Project 443 PREPARED BY: Andrew J. Brotzler, PE, Director of P lic AGENDA NO. (� Works / City Engineer "�J• ATTACHMENTS: Location Map; and Contractor Letter APPROVED BY: pa I RECOMMENDED ACTION: Motion to authorize the closure of TH 3 as outline in the attached request subject to the administrative approval of a supplemental agreement for the TH 3 Underpass Project, City Project 443. BACKGROUND: Attached for Council consideration is a request to close TH 3 for the TH 3 Underpass Project, City Project 443. The contractor has requested to close Hwy 3 on Friday, August 2, 2013 at 7:00 p.m. and reopen it on Monday, August 5, 2013 at 5:00 a.m. During that time, the contractor will complete the installation of the underpass within the roadway. The detour will eliminate the need to shift traffic and reduce the width of the driving lanes. Barricades and construction barrels will still be needed along TH 3 throughout the project. The detour will not reduce the project schedule. Staff has discussed the road closure request with the police department and the Rosemount High School. Both organizations support the closure due to the reduced time traffic will be constricted. Pending Council approval of the requested road closure, staff will work with Mn /DOT and Dakota County for approval of the closure and detour. Pending agency approval, a supplemental agreement will be negotiated with the contractor. SUMMARY: Staff requests Council consideration to approve the closure and detour of TH 3 for the TH 3 Underpass Project, City Project 443. G:AENGPROJ \443 \Council Items \20130702 CC I hvy 3 I)etour.does PROPOSED RETAINING WA 0 PROPOSED BITUMINOUS PATH PROPOSED HEADWALLS *- / I 701 X,­ Avenue SlIth, Suite 300 jp.,11� " �MN 5W6 wtB M,... — gcum INFRASTRUCTURE ENGINEERING "NING CONSTRUCT- It — ., —, .. �v I 140TH CIRCLE 4 - -- -- PROPOSED STORM SEWER j o ', 10M PROPOSED PEDESTRIAN UNDERPASS —PROPOS�65,G� RETE'SIDEV�ALl�! REMOVE EXISTING BITUMINOUS PATH tv ZUNK HIGHWAY NO. 3 (SOUTH ROBERT TRAIL) 3RADE SEPARATED PEDESTRIAN CROSSING VROSEMOUNT UNDERPASS OPTION SITE PLAN MINNESOTA 0 Figure Number 4 2500 West County Road 42, Suite 105 Burnsville, MN 55337 Ph: 952 -955 -8118 F:952- 955 -8119 June 25, 2013 Mr. Nick Hentges WSB & Associates, Inc. 701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 Regarding: S.A.P. 208 - 010 -009 / C.P. 443 City of Rosemount, MN Subject: Value Engineering Proposal (Weekend Closure of TH #3) Dear Mr. Hentges, MN Dirt Works per MNDOT specification 1408 is submitting a value engineering proposal for the above referenced project. The format below is specific to the prescribed method outlined in the aforementioned specification. 1) This proposal is being submitted as value engineering proposal. 2) MN Dirt Works is proposing to shut down TH #3 (S. Roberts Trail) on Friday August 3 at 7:00 pm and reopen it on Monday morning August 5th at 5:00 am to install the box culvert (Bridge #19X06) crossing complete. See enclosure A for the proposed traffic detour. This proposal includes all activities from excavation less the last lift of wearing course pavement for TH #3. After August 5th successor activities would include finishing wing wall construction on both ends of the Bridge in addition to civil work for the tie ins. Access to all residences will be maintained at all times. 3) Specification 5 -15.6 A would have to be changed to allow this closure. MN Dirt Works recommends a meeting with The City of Rosemount, MNDOT and the contractor to discuss this change and its feasibility. 4) The xeduction in total contract with the City of Rosemount would be $25,000.00. MN Dirt Works would credit this amount back in addition to picking up the traffic control costs for the weekend detour. 5) In application of the credit proposed in item #4 a combination of bid items #51, 52, 59, 60, 76 & 77 would possibly need to be modified. MN Dirt Works proposes that the net effect would be after modification of the bid items that the total credit to the client would be as listed in item #4. 6) This proposal would need to be adopted by July 8th, 2013 to obtain a maximum economic and schedule impact. 7) No previous written proposal of this kind has been made previously. MW �* 2500 West County Road 42, Suite 10S Burnsville, MN 55337 Ph: 952 -955 -8118 F:952- 955 -8119 8) The completion date of the project would not be changed. However the amount of time with traffic in a constricted alignment would be reduced from 60 calendar days to 3. Additionally traffic would be maintained in its current alignment through the 4th of July Holiday and Leprechaun Days. Upon review if there are any questions please contact me. Regards, r � Dan Ames President Minnesota Dirt Works Map Enclosure: