HomeMy WebLinkAbout8.a. City Projects UpdateCity Projects Update G: \ENGPROJ \Project Tracking \Project Update Updated: 08/07/2013 Council City Council public Receives Award Assessment Contract Payments Project Project Name Authorizes Hearin 9 Plans /Specs. Open Bids Contract Start Date Hearing Contractor Amount To Date Complete Summary Number Plans /Specs Authorize Ad For Bid This project will establish the master feasibility report for all future 433 Bel la Bella Vista N/A N/A Bella Vista developments. Anticipate authorizing feasibility report (Marshes Bloomfield) on August 20, 2013. TH 3 was closed August 3 -5 to complete the installation of the 443 Trunk Highway 3 Underpass 05/15/12 N/A 04/02/13 04/26/13 05/07/13 05/20/13 N/A Minnesota Dirt Works, $745,894 underpass. The wing walls have been installed on both sides of Inc. TH 3. Grading and trail installation remain. The project is expected to be completed before school begins in September. 446 149th Street Improvements 01/02/13 N/A 04/16/13 04/26/13 05/07/13 05/20/13 N/A Ryan Contracting $806,816 $463,494 57% Curb and gutter has been installed. Base course paving expected Company to be completed by August 16. Design and construction of the railroad crossing improvements will 145th Street Pedestrian a occur in 2013 or early 2014. Sidewalk has been installed on the 447 Improvements RR 01/02/13 N/A N/A southwest corner adjacent to the Park & Ride. Other pedestrian Crossing improvements will be constructed in 2014. This development includes 37 single - family homes by developer 448 Prestwick Place 7th 04/16/13 N/A 06/18/13 06/28/13 07/16/13 07/29/13 N/A LaTour Construction, $1,537,521 U.S. Home Corporation (Lennar). The City will share in a portion of Inc. the storm sewer cost for this project. Storm sewer installation has begun. Water main, sanitary sewer main and storm sewer have been 449 Greystone 2nd 05/07/13 N/A 06/04/13 06/07/13 06/18/13 07/01/13 N/A Friedges Contracting, $519194 installed. Concrete curb and gutter is expected to be installed by Inc. August 10. Base course paving is expected to be completed by August 16. 450 Prestwick Place 8th 08/20/13 N/A 09/03/13 09/20/13 10/01/13 10/07113 N/A This development includes 33 single - family homes by D.R. Horton. A feasibility report is currently being prepared for this project. The 452 Bacardi Avenue N/A N/A report will outline the necessary improvements to Bacardi Avenue Improvements north of Bonaire Path, as well as the estimated cost and funding. This development includes 28 single - family homes by developer 454 Bella Vista 2nd N/A N/A U.S. Home Corporation (Lennar). Construction is planned for 2014. G: \ENGPROJ \Project Tracking \Project Update Updated: 08/07/2013