G: \ENGPROJ \Project Tracking \Project Update.xls Updated: 9/5/2013
Council
City
Council
Public
Receives
Award
Assessment
Contract
Payments
%
Project
Project Name
Authorizes
Hearin 9
Plans /Specs.
Open Bids
Contract
Start Date
Hearin g
Contractor
amount
To Date
Complete
P
Summary
Number
Plans /Specs
Authorize Ad
For Bid
This project will establish the master feasibility report for all future
433
Bella Vista
N/A
N/A
Bella Vista developments. The feasibility report is currently being
(Marshes of Bloomfield)
prepared.
443
Trunk Highway 3 Underpass
05/15/12
N/A
04/02/13
04/26/13
05/07/13
05/20/13
N/A
Minnesota Dirt Works,
$745,894
$383,431
51%
The project is substantially complete. Fencing on the wing walls
Inc.
will be installed the week of September 9th.
446
149th Street Improvements
01/02/13
N/A
04/16/13
04/26/13
05/07/13
05/20113
N/A
Ryan Contracting
Company
$806,816
$537,158
67%
The project is substantially complete.
Design and construction of the railroad crossing improvements will
145th Street Pedestrian
a
occur in 2013 or early 2014. Sidewalk has been installed on the
447
Improvements RR
01/02/13
N/A
N/A
southwest corner adjacent to the Park & Ride. Other pedestrian
Crossing
improvements will be constructed in 2014.
This development includes 37 single - family homes by developer
448
Prestwick Place 7th
04/16/13
N/A
06/18/13
06/28/13
07/16/13
07/29/13
N/A
LaTour Construction,
$1,537,521
U.S. Home Corporation (Lennar). The City will share in a portion of
Inc.
the storm sewer cost for this project. Utility construction will be
complete the week of September 161h.
Friedges Contracting,
Base course paving is complete and small utilities are currently
449
Greystone 2nd
05/07/13
N/A
06/04/13
06/07/13
06/18!13
07/01/13
N/A
Inc.
$519,194
$294,104
57%
being installed. Sidewalk installation will occur this fall. Final
paving will be completed in 2014.
A feasibility report is currently being prepared for this project. The
452
Bacardi Avenue
N/A
N/A
report will outline the necessary improvements to Bacardi Avenue
Improvements
north of Bonaire Path, as well as the estimated cost and funding.
This development includes 28 single - family homes by developer
a5a
Bella Vista 2nd
N/A
N/A
U.S. Home Corporation (Lennar). Construction is planned for
2014.