Loading...
HomeMy WebLinkAbout8.a. City Projects UpdateCity Projects Update G: \ENGPROJ \Project Tracking \Project Update.xls Updated: 9/5/2013 Council City Council Public Receives Award Assessment Contract Payments % Project Project Name Authorizes Hearin 9 Plans /Specs. Open Bids Contract Start Date Hearin g Contractor amount To Date Complete P Summary Number Plans /Specs Authorize Ad For Bid This project will establish the master feasibility report for all future 433 Bella Vista N/A N/A Bella Vista developments. The feasibility report is currently being (Marshes of Bloomfield) prepared. 443 Trunk Highway 3 Underpass 05/15/12 N/A 04/02/13 04/26/13 05/07/13 05/20/13 N/A Minnesota Dirt Works, $745,894 $383,431 51% The project is substantially complete. Fencing on the wing walls Inc. will be installed the week of September 9th. 446 149th Street Improvements 01/02/13 N/A 04/16/13 04/26/13 05/07/13 05/20113 N/A Ryan Contracting Company $806,816 $537,158 67% The project is substantially complete. Design and construction of the railroad crossing improvements will 145th Street Pedestrian a occur in 2013 or early 2014. Sidewalk has been installed on the 447 Improvements RR 01/02/13 N/A N/A southwest corner adjacent to the Park & Ride. Other pedestrian Crossing improvements will be constructed in 2014. This development includes 37 single - family homes by developer 448 Prestwick Place 7th 04/16/13 N/A 06/18/13 06/28/13 07/16/13 07/29/13 N/A LaTour Construction, $1,537,521 U.S. Home Corporation (Lennar). The City will share in a portion of Inc. the storm sewer cost for this project. Utility construction will be complete the week of September 161h. Friedges Contracting, Base course paving is complete and small utilities are currently 449 Greystone 2nd 05/07/13 N/A 06/04/13 06/07/13 06/18!13 07/01/13 N/A Inc. $519,194 $294,104 57% being installed. Sidewalk installation will occur this fall. Final paving will be completed in 2014. A feasibility report is currently being prepared for this project. The 452 Bacardi Avenue N/A N/A report will outline the necessary improvements to Bacardi Avenue Improvements north of Bonaire Path, as well as the estimated cost and funding. This development includes 28 single - family homes by developer a5a Bella Vista 2nd N/A N/A U.S. Home Corporation (Lennar). Construction is planned for 2014. G: \ENGPROJ \Project Tracking \Project Update.xls Updated: 9/5/2013