HomeMy WebLinkAbout6.f. Receive Quotes – Soil Correction for Phase One of the Erickson Park Tennis Courts 4ROSENIOUNTEXECUTIVE SUMMARY CITY COUNCIL City Council Regular Meeting: October 1, 2013 AGENDA ITEM: Receive Quotes — Soil Correction for AGENDA SECTION: Phase One of the Erickson Park Tennis Consent Courts PREPARED BY: Dan Schultz, Parks and Recreation AGENDA NO. 1p Director ATTACHMENTS: Concept/Phasing Plan APPROVED BY: D a RECOMMENDED ACTION: Motion to recommend the City enter into a contract with Minnesota Dirt Works Inc. to complete the soil corrections for phase one of the Erickson Park Tennis Court Project. ISSUE The City of Rosemount's 2013 10 Year CIP Working Program includes funding for the construction of four tennis courts. The four tennis courts would be the first phase of an eight court tennis complex to be located in Erickson Park. The project was bid out and the bids came back considerably higher than the cost estimate. The City Council approved a motion that rejected all bids and directed staff to look to complete the soil corrections needed for phase one of the project this fall by getting quotes on the soil correction only, based on the City's purchasing policy. We would then rebid the remainder of the project during the early winter with a lengthened construction schedule. Staff asked some local contractors to provide us with price quotes for making the soil corrections this fall. Staff received two quotes for the work after offering the opportunity to four contractors. The price breakdown is listed below: Friedges MN Dirt Works - Price Bituminous Roadways-items Landscaping Quote from original Low Bid Price Quote Mobilization Included in items below $1,200.00 $15,000.00* Common Exc.. $29,432.50 $14,500.00 $22,756.00 Export Included in common exc. $31,362.50 $37,635.00 Select Granular $25,107.45 $35,462.50 $52,484.50 Total I $54,539.951 $82,525.00 $127,875.50 *Note that Bituminous Roadways original bid for mobilization was for more extensive work and coordination with subs, so that price is understandably higher than the quotes from Minnesota Dirt Works Inc. and Friedges Landscaping. BACKGROUND The project was recently publically bid. Bids were received for the project on Friday,August 23,2013,and were opened and read aloud. There were a total of seven prime contractors listed on the bidder list.A total of two bids were received. The bids were checked for mathematical accuracy and tabulated.The low bid was submitted by Bituminous Roadways in the amount of$456,106.75 for the base bid improvements. The engineer's estimate was $358,033.50. SUMMARY Based on the two quotes that were received,it appears that the City could save over$50,000 on the soil correction portion of this project if we contract with Minnesota Dirt Works Inc.,who provided the low quote. Staff is recommending that the City enter into a contract with Minnesota Dirt Works Inc. to complete the soil corrections for phase one of the Erickson Park Tennis Court Project. 2 — n'14 .... a,,, ° onv'-� NVId 3118 l d0R110313 ..nrn"w ,..4 .... n.v.....2 1 M,,, KO, �i wwww.eeei:�nw a ao m., n S1imf100 SINN31)121vd NOSNORI3 I /� 'era+•'w.+ 5J4I ,,-. =.7.--1,..m.=...; v cIKC Uri'x°a�°wv �J/Y/ p "...,.. .,, 5„ W..... mr-:, � , `" VIOS3NNIW�1Nl0WaBObdOAin #;f`r °°'m'e`....""'°' V' _ W s � g � n n n� na R 111 4 1 1 ' I 0101: I: q 1 1 Ø IL I 1 1 E1 a is Ili IJ oi Itl 1 I 1',°a=J� ii a t+ � ' � @� `� d° Ih s! 11 iii kk0iH! 9 0. :e l A 4 A 4 . • d 9 d 0 00 0 G 41 / `I, / \ 1 1 \ 11411.4ft0 rn4L2 1 , \ / / \I\ ■ y \,/ '' / / '/ ./ '- ‹ lid /6Ci / \ / o I� ( \��� gyp► 4 , . , ,. L____ '� _ +I,� • 4J�/ r3 i.. ,;; ,� r ,,o a , ! 9 11 1ii :k I i ........ I lh I 9s r j \ ok. , , `,� "o J._ i 4r -o a. ,2 8 ii. not 11 z t I • :hi"Fe 4 r2i, s 050 1.