HomeMy WebLinkAbout6.g. Payment 12 & Final – Meadows Park, Landscaping and Path Construction, Part of City Project 387 4ROSEMOUNTEXECUTIVE SUMMARY
CITY COUNCIL
City Council Meeting: November 5, 2013
AGENDA ITEM: Payment 12 & Final — Meadows Park AGENDA SECTION:
Landscaping and Path Construction, Part Consent
of City Project 387
PREPARED BY: Andrew J. Brotzler, PE, Director of Public AGENDA NO. .
Works / City Engineer
ATTACHMENTS: Payment Voucher, Map APPROVED BY:
ot)
RECOMMENDED ACTION: Motion to Approve Payment 12 and Final for the Meadows
Park Landscaping and Path Construction, Part of City Project 387, to Pine Bend Paving,
Inc. and Accepting it for Perpetual Maintenance.
BACKGROUND:
This item is on the agenda to request Payment 12 and Final to Pine Bend Paving, Inc. for the Meadows
Park Landscaping and Path Construction,part of City Project 387.
The final construction amount of$87,337.40 is 4.9%below the contract amount of$91,816.
The landscaping and trail project was funded as part of the Old County Road 38 Street and Utility Project.
SUMMARY:
Staff recommends that Council approve Payment 12 and final for the project and accept the project for
perpetual maintenance subject to the following conditions.
1. Satisfactorily showing that the contractor has complied with the provisions of Minnesota Statutes
290.92 requiring withholding state income tax.
2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the
contract have been fully paid or satisfactorily secured.
3. Consent of Surety to Final Payment certification from the contractor's surety.
G:\ENGPROJ\387\Council Items\201311105 CC Payment 12-Final.docx
WSB
&Associates, engineering•planning•environmental•construction 701 Xenia Avenue South
Suite 300
Minneapolis,MN 55416
Tel: 763-541-4800
Fax: 763-541-1700
October 4,2013
Mr.Andy Brotzler,PE
City Engineer
City of Rosemount
2875— 145th Street West
Rosemount,MN 55068
Re: Construction Pay Voucher No. 12(Final)
Meadows Park
Landscaping and Path Construction
City of Rosemount Project No. 387
WSB Project No. 1591-02
Dear Mr.Brotzler:
Please find enclosed Construction Pay Voucher No. 12 and final for the above-referenced project in the
amount of$2,803.87. Also enclosed are the following documents required for processing final payment
for the above-referenced project:
1. Satisfactory showing that the contractor has complied with the provisions of Minnesota Statutes
290.92 requiring withholding state income tax(IC 134 forms).
2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the
contract have been fully paid or satisfactorily secured(lien waivers).
3. Consent of Surety to Final Payment certification from the contractor's surety.
We recommend that you make final payment in the amount of$2,803.87 for Pine Bend Paving, Inc. at
your earliest convenience. Please contact me at 651-322-2015 if you have any questions or comments
regarding the attached information. Thank you.
Sincerely,
WSB&Associates,Inc.
c2(261104.-0"
Phil Olson, PE
Project Engineer
Enclosures
cc: Chris Mallinger, Pine Bend Paving, Inc.
Jean Harrington/Karin Kladar, City of Rosemount srb
St.Cloud• Minneapolis•St.Paul
Equal Opportunity Employer
wsbeng.com
I18vtws011projects10 1591-02L1dnin:Construction AdninUleadows Parki387 L7R VO 12 FNL CTY-n bronler-100413.doc
- Owner: City of Rosemount Date: September 27,2013
wsBFor Period: 6/18/2013-9/19/2013 Request No: 12 AND FINAL
Contractor: Pine Bend Paving, Inc.
PAY VOUCHER
MEADOWS PARK LANDSCAPING AND PATH CONSTRUCTION
ROSEMOUNT, MN
CITY PROJECT NO. 387
WSB PROJECT NO. 1591-02
SUMMARY
1 Original Contract Amount $ 91,816.00
2 Change Order-Addition $ 0.00
3 Change Order-Deduction $ 0.00
4 Revised Contract Amount $ 91,816.00
5 Value Completed to Date $ 87,337.40
6 Material on Hand $ 0.00
7 Amount Earned $ 87,337.40
8 Less Retainage 0% $ 0.00
9 Subtotal $ 87,337.40
10 Less Amount Paid Previously $ 84,533.53
11 AMOUNT DUE THIS PAY VOUCHER NO. 12 AND FINAL $ 2,803.87
Recommended for Approval by:
WSB&ASSOCIATES CONSTRUCTION OBSERVER:
c422210
Approved by Contractor: Approved by Owner:
PINE BEND PAVING, INC. CITY OF ROSEMOUNT
Specified Contract Completion Date: Date:
N/A
Page 1 of 3 100159f-021AOn*nlCansboctlon AO,*$MeaOOws PaMf591-02 Pay Voucher 12 FNL-092713sumary
PAY VOUCHER NO.12 AND FINAL
MEADOWS PARK LANDSCAPING AND PATH CONSTRUCTION
ROSEMOUNT,MN
WSB PROJECT NO.1591-02 6/18/2013-9/19/2013
Contract Unit Current Quantity Amount
No. Material No. Item Unit Quantity Price Quantity to Date to Date
;Schedule A- i
1 2105.525 (TOPSOIL BORROW(CV) rt CU YD 2500 I$12.40 ! 0.00' 2,306.001 $28,594.40
2 2521.604 12"BITUMINOUS PATH SQ YD 600 $35.00 1 0.001 612.00i $21,420.00
3 2571.502 ;DECIDUOUS TREE 2"CAL B&B TREE 25 $330.00 1 00 25.001 $8,250.00
4 2573.502 SILT FENCE,TYPE MACHINE SLICED —1 LIN FT 2000 1 $1.50 I 0.00 1,538.001 $2,307.00
5 2575.604 1TURF ESTABLISHMENT ACRE 5 1$3,300.001 0.00, 5.00 $16,500.00
6 2575.610 12009 TURF MAINTENANCE — I HOUR 24 1 $104.50 i 0.00 24.00! $2,508.00
7 2575.610 12010 TURF MAINTENANCE HOUR 24 $104.50 0.001 24.00 $2,508.00
8 2575 610 2011 TURF MAINTENANCE HOUR 24 1 $75.00 0.001 L 0 00 $0.00
9 2575 610 :2012 TURF MAINTENANCE HOUR 24 i $75.00 1 2.00 24.00 $1,800.00
10 2575.610 12013 TURF MAINTENANCE 1 HOUR 24 1 $75.00 I 24.00 24.00 $1,800.00
11 2575.601 'PRESCRIBED BURN LUMP SUM' 1 1$1,650.001 0.00 1.00, $1,650.00
TOTAL SCHEDULE A $87,337.40
TOTAL CONTRACT $87,337.40
Page 2 of 3 Kwunmua,." aN.uon•m."w.mo..vaMuu+o3 Pay vwch.,11 rw001713W.mxy
PROJECT PAYMENT STATUS
MEADOWS PARK L CITY OF ROSEMOUNT
ROSEMOUNT, MN
CITY PROJECT NO. 387
WSB PROJECT NO. 1591-02
CONTRACTOR: PINE BEND PAVING, INC.
CHANGE ORDERS
No. Date Description Amount
Total Change Orders $0.00
PAYMENT SUMMARY
No. From To Payment Retainage Completed
1 10/01/2008 10/31/08 $20,349.00 $1,071.00 $21,420.00
2 11/01/2008 11/30/08 $29,830.85 $2,641.05 $52,820.90
3 12/01/2008 05/15/09 $22,107.45 $3,804.60 $76,091.90
4 05/16/2009 07/15/09 $546.02 $3,833.33 $76,666.65
5 07/16/2009 11/30/09 $4,980.58 $786.00 $78,599.90
6 12/01/2009 12/31/09 $969.71 $786.00 $79,579.40
7 01/01/2010 06/30/10 $444.85 $800.29 $80,028.75
8 07/01/2010 09/30/10 $2,038.07 $0.00 $87,337.40
9 10/01/2010 07/18/12 $1,262.25 $833.62 $83,362.40
10 07/19/2012 , 09/04/12 $371.25 $837.37 $83,737.40
11 09/04/2012 06/17/13 $1,633.50 $853.87 $85,387.40
12 AND FINAL 06/18/2013 09/19/13 $2,803.87 $0.00 $87,337.40
Material on Hand
Total Payment to Date $87,337.40 Original Contract $91,816.00
Retainage Pay No. 12 AND FINAL $0.00 Change Orders $0.00
Total Amount Earned $87,337.40 Revised Contract $91,816.00
Page 3 of 3 K:101591.021Atlm/nfCoesWCtlon ACminNleadows Park11591.02 Pay Voucher 12 FNL-092713s1afu3
Meadows Park " ROSEMOUNT
Trail and Landsca . e Improvements . : . ' :, ' : u
KEEGAN W
LAKE
a
W
Q
Q
CO
r
MA' .
POND BONAIRE PATH W
BIRDS() w MARE POND iv ATHENA yL
CT Q ��' h .qjy �A-
;IRDSONG PATH 0 P'�� Q' '9 �y4 0.
136TH S W O
Iii,o P'VP* li,� 9�,Q/0 c� S N 'li
D 0 '9L� pp� QJ
mp 1i,
°v TRL
CON N 'I'Vt.--P1/4
MAR °° RL '�%
v-cU M N tp°
9 G
ON ,M . •TH �GN P PE • A O
gR M CC ST ■ vE
C •
s °' s % 139-C\IN
PJk/ BELVIDERE r D �G. 5
Op CT 2�Z
o O -I O
v�� 140TH ST W E n�00
m Birch n NO/H ST z
11ONT Park -I qy
BIRCH S 9 -9yT� > >
rGy N�003 L( a Q
F1.MONT rR �eId Park 0-c\) GAG
SST ow,' f �P� 2 0
0 362.5 725 1,450 2,175 2,900
Feet
-4—
T:/GIS/City/Maps/Departmental Maps/Engineering/Chris/Location Map-387 August 2013