Loading...
HomeMy WebLinkAbout6.s. Receive Quotes/Award Contract - Test Well 16, City Project 416 ROSEMOUNTEXECUTIVE SUMMARY CITY COUNCIL City Council Meeting: December 17, 2013 AGENDA ITEM: Receive Quotes/Award Contract —Test AGENDA SECTION: Well 16, City Project 416 Consent t9) PREPARED BY: Phil Olson, PE, Assistant City Engine AGENDA NO. (p, S• ATTACHMENTS: Resolution, Map, Recommendation APPROVED BY: Letter, Bid Tabulation )0.) RECOMMENDED ACTION: Motion to Adopt a Resolution Receiving Bids and Awarding the Contract for Test Well 16, City Project 416 contingent upon recording of the deed to Outlot G. ISSUE: Receive quotes and award contract for the Test Well 16, City Project 416. BACKGROUND: On Thursday, December 5, 2013, three quotes were received for Test Well 16, City Project 416. After verification of quotes received, the low quote is Bergerson-Caswell, Inc., submitting a quote of$37,835.00. The project includes the construction of the test well and obtaining geological and water quality data. Costs associated with these improvements will be funded by the City's Water Core Fund. Test Well 16 will be located on Outlot G of the Bella Vista development. The developer has submitted a signed Quit Claim Deed for Outlot G. The award of this project is contingent upon recording of the deed to Outlot G with Dakota County. SUMMARY: Staff recommends that Council adopt the attached resolution receiving the bids and awarding the contract for the construction of Test Well 16, City Project 416 to Bergerson-Caswell, Inc. G:APNG PRO J\416\Council Items\20131217 Receive Quotes and Award Contract.docx CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2013 — A RESOLUTION RECEIVING QUOTES AND AWARDING THE CONTRACT FOR TEST WELL 16, CITY PROJECT 416 WHEREAS, City Council hereby ratifies action of City Engineer to secure quotes for the Test Well 16, City Project 416, BE IT RESOLVED,by the City Council of the City of Rosemount,Minnesota, as follows: 1. The quote of Bergerson-Caswell, Inc. of Maple Plain,Minnesota in the amount of $37,835.00 for the Test Well 16 Project shall be and hereby is accepted. 2. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 3. Award of the contract is contingent on the determination by the City Administrator that all necessary rights-of-entry or easements by deed or dedication have been secured for construction of the improvements. ADOPTED this 17th day of December,2013. William H. Droste,Mayor ATTEST: Amy Domeier, City Clerk T:/GIS/City/Maps/Departmental Maps/Engineering/Chris/Location Map-416 W Q "Oj, 128TH z I ST W W 9'_ m MCMENC POND 130TH ST W * KEEGAN W LAKE > EEGAN Q LAKE C) CI Q 'Y rti Q m I MARE k Si. W POND BONAIRE PAT BIRDSONG ARE POND ,w4- ATHENA BIRDSONG PATH a 3co ��� `� y<2 < O d gyp. v ' 136TH ST W O o A� vi". '9T y�'p�G cT CZ`s o �T� ELF 0°� V. m CONNE�A °°°SRS- 9��'�� o TRL ,9 • V1LI M N by g,RM1NGO\ 138TH z'm 4 P oNs °O6 A o -Ti. CI ST W co 7 vG 11 Oa '�39��y Z m G 5 .4 BELVIDERE r- G R` Shod) CT Z ��� o 140THSTW z HSTW o cr o0 Birch 73 N�� W BELMONT n Park -4L,1 CT BIRCH ,s�, -G yT/ CO > IV �OpO F a a a eFL MO NT T/? d 10-0MN le/ W P Z BELFAST eloomfle� \10 I- 2 4 ROSEMOUNT Well /6 N MINNESOTA City Project 416, September 2013 WSB &Asso- engineering•planning•environmental.construction 701 Xenia Avenue South Suite 300 Minneapolis,MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 December 9, 2013 Honorable Mayor and City Council City of Rosemount 2875— 145th Street West Rosemount, MN 55068 Attn: Jean Harrington/Karin Kladar, Public Works Re: Test Well No. 16 Project City of Rosemount, MN WSB Project No. 1582-18 Dear Mayor and Council Members: Quotes were received for the above-referenced project on Thursday, December 5, 2013. Three quotes were received out of six solicitations. The quotes were checked for mathematical accuracy and tabulated. Please find enclosed the quote tabulation indicating the low quote as submitted by Bergerson-Caswell, Inc. of Maple Plain, MN, in the amount of$37,835.00. The Engineer's Estimate was $50,055.00. We recommend that the City Council consider these quotes and award a contract in the amount of $37,835.00 to Bergerson-Caswell, Inc. based on the results of the quotes received. Sincerely, WSB&Associates,Inc. y7 161 je.A.A Nancy D. eigler, PE Senior Project Manager Enclosures cc: Tim Berquam, Bergerson-Caswell, Inc. Andy Brotzler, City of Rosemount srb St.Cloud• Minneapolis•St.Paul Equal Opportunity Employer wsbeng.com Ilgvnns011proJec ts101582-180L4dminlConstruction AdmmILTR RECbA!IDTN-hmcc-120913.doc QUOTE TABULATION SUMMARY PROJECT: Test Well No. 16 Project OWNER: City of Rosemount, MN WSB PROJECT NO(S).: 1582-18 QUOTES RECEIVED: Thursday, December 5, 2013, at 12:00 p.m. Engineer's Estimate Bergerson-Caswell, Keys Well E.H. Renner& Inc. Drilling Co. Sons, Inc. Bid Security(5%) N/A N/A N/A N/A Addendum No. 1 Received N/A X X X Total Base Quote $50,055.00 $37,835.00 $48,030.00 $49,618.00 I hereby certify that this is a true and correct tabulation of the quotes as received on December 5, 2013. L 41-3e-z64 Nancy D. Zeigler, PE, Senior Project Manager * DENOTES CORRECTED FIGURE K:101582-1801AdminlConstruction Admin11582-18 Quote Tab Summary-120513 A WSB I/DTI T A nI A TI % I F 1I - A ■■ WUU i I_ I MI ULH I IUIN UC I HIL &A.rA.-,t liar. Project Name: Test Well No. 16 Project Project No. 1582-18 Client: City of Rosemount, MN I hereby certify that this is an exact reproduction of quotes received. Quotes Received: Thursday, December 5, 2013, at 12:00 p.m. Engineer: Nancy D.Zeigler, PE, Senior Project Manager * DENOTES CORRECTED FIGURE Bidder No.1 Bidder No.2 Bidder No.3 Engineer's Estimate Bergerson-Caswell,Inc. Keys Well Drilling Co. E.H.Renner&Sons,Inc. Item No. Item I Units Qty Unit Price Total Unit Price I Total Unit Price Total Unit Price Total BASE QUOTE 1 MOBILIZATION/DEMOBILIZATION LUMP SUM 1 $6,000.00 $6,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $12,000.00 $12,000.00 2 DRILL 8"DIAMETER CASED HOLE LIN FT 190 $75.00 $14,250.00 $45.00 $8,550.00 $75.00 $14,250.00 $67.00 $12,730.00 3 DRILL 8"NOMINAL DIAMETER OPEN HOLE LIN FT 306 $40.00 $12,240.00 $30.00 $9,180.00 $40.00 $12,240.00 $30.00 $9,180.00 4 FURNISH&INSTALL COMPLETE 4"DIAMETER INNER LIN FT 397 $20.00 $7,940.00 $15.00 $5,955.00 $20.00 $7,940.00 $14.00 $5,558.00 CASING 5 FURNISH&INSTALL COMPLETE NEAT CEMENT GROUT CU YD 7 $475.00 $3,325.00 $500.00 $3,500.00 $500.00 $3,500.00 $450.00 $3,150.00 6 DEVELOPMENT HOUR 8 $250.00 $2,000.00 $225.00 $1,800.00 $225.00 $1,800.00 $400.00 $3,200.00 7 FURNISH,INSTALL,AND REMOVE TEST PUMP LUMP SUM 1 $2,000.00 $2,000.00 $1,750.00 $1,750.00 $1,500.00 $1,500.00 $1,500.00 $1,500.00 8 TEST WELL PUMPING HOUR 4 $200.00 $800.00 $150.00 $600.00 $150.00 $600.00 $200.00 $800.00 9 CHEMICAL ANALYSIS INCLUDING REPORT LUMP SUM' 1 $1,500.00 $1,500.00 $1,500.00 $1,500.00 $1,200.00 $1,200.00 $1,500.00 $1,500.00 TOTAL BASE QUOTE $50,055.00 $37,835.00 $48,030.00 $49,618.00 DECLINED TO SUBMIT: Steffl Drilling&Pump Theis Well Mark J.Traut Wells,Inc. Page 1 of 1 K:101582-1801AdminlConstruction Admin11582-18 Quote Tabulation-120513