HomeMy WebLinkAbout2.C. Steeple Center Shades ROSEMOUNTEXECUTIVE SUMMARY
CITY COUNCIL
City Council Special Work Session Meeting: January 21, 2014
AGENDA ITEM: Steeple Center Shades AGENDA SECTION:
Discussion
PREPARED BY: Dan Schultz, Parks and Recreation AGENDA NO. -) ,
Director G l.'
ATTACHMENTS: Project Drawings APPROVED BY:
DA-)
RECOMMENDED ACTION: Discussion only.
ISSUE
In the spring of 2013 the City Council directed staff to pursue bids to install blackout shades for the
Steeple Center. The blackout shades would allow for Steeple Center users to host a variety of daytime and
early evening events and performances without having the outside light impacting their use of the facility.
Because of the unique architecture of the Steeple Center,many of the blinds will need to be custom made
or have mechanical motors that raise and lower the blinds. The blinds that are located on the main level of
the facility will be inset by hand versus the use of a blind that moves up and down on a track. On the main
level of the building, there is limited space to work with due to the location of the heating system and the
track system that will be used to hang public art. Drawings with details about the blinds are attached for
your review.
Staff did share the project details with the Rosemount Area Arts Council (RAAC) and RAAC is supportive
of the project.
Staff anticipated the project would cost between $70,000 and $80,000. The project was put out for bid and
we received four bids. The bid tabulation is below:
Name Bid
MN Construction $ 90,900
Langer Construction $ 94,000
Terra General Contractors $ 102,800
Meisinger Construction Co. $ 114,900
SUMMARY
Staff would like to discuss the details of the project with the City Council and get direction as to how staff
should proceed with the project.
N II
T ' ‘
0 , —
-- -..., _
-- -... —
--
--
/ N / N / N / N
r ( \
r \
r
1 )
1
1 0 1 1 0 1 1 0 1 1 .0
Aubs 1
i •
Imiiimer
) ,
1
0
.-9 \ n ® ®
.
0 0 (-\
,2 \
\ (,, „ ,(7,, 0
ir-. 0
_I
I
- - - - - -Main
— — — — — — v
0 0 E.sbng ba Oebord 0 0
)n at Transept and Nave
---------
-- -,
1)1y, vi .1),\\)
IX 1
/ \
, 0
r .1
/r/ II=
, orli. 0
I 1 1
■I i 0
. -
---141110110AE4 I (I
[ Its- LI 0
1 –
A :11
411
13t7Y--& A
IIINICIEES I: a
wiagetazukamem .„-,
'
6
1 1 1
1 1 1 1
k——1 •L--J F, ill L,L=r____ _ =_i - (De
0 .
1;
, g_tdiu.S e 0
I
I .
• ,y. .cam=e
JI„ I ,,
riPrih
\ p
1vJ
0 4,<,1 , dd,gy i i",,,,,,,-----,. .., ,,,,,,,,,
1 . , 1, ., I 1 I 1 c-_.v(9 Vn 1
1 Iiiiiiiiiii
i�
1r
1
o (6) o . \ :
_____ ....__
. • I I I I I
_
�
1
-
L
bl
- —-— - — - - -— - — 1— —��' I — — — — — —� Main Level
e - — 98r
Existing baseboard
to remain,typical Existing partial height wall to Existing ramp and walls shown
remain,roller shade to terminate at dashed for clarity
top of wall
on at Nave and Transept
Note:Removable feed shade to be attached to permanent channels mounted to the existing
At plaster wall system and field painted to match existing.All exposed hardware.fasteners or other
A3 2 connections to be field painted to match existing.
r Top of fixed frame to
match existing window
head geometry ek
\ \
i
/ \ Continuous mounting
/ thermal at existing -<• Mounting channel
.Z / \ / well frame to be centered
s / \ was weft on existing opening
Ti / \ r
/ \ N \ \
a
\ 1 / \ I 110 Existing stained Fixed shade,color to
glass vandow match room darkening
roller shades
Room darkening £
roller shade • 1111 ) b .- f c i
Existing stained I.I + 1 -
glass window
Glide was to be I J
mitered on
E? existing vertical
IIifoM,typiwl " I) Continuous mounting
Fixed shade L channel with mounting
hannel shown dashed
v N-- - N
•
window width
/
/ \ Existing wood (field verify)
I/
/ \ /y trim to remain
Bottom/Up Shade // N
Enclosure / \ \ >
/ \
Floor 1 n Floor 1