Loading...
HomeMy WebLinkAbout6.o. Receive Bids/Award Contract – TH 3 Turn Lane Improvements, City Project 456 RESE \4EIUI\ T EXECUTIVE SUMMARY CITY COUNCIL City Council Meeting: May 6, 2014 AGENDA ITEM: Receive Bids/Award Contract — TH 3 Turn AGENDA SECTION: Lane Improvements, City Project 456 Consent PREPARED BY: Phil Olson, PE, Assistant City Engineer AGENDA NO. `j •V� ATTACHMENTS: Resolution; Map; Letter of APPROVED BY: Recommendation; Bid Summary 012i RECOMMENDED ACTION: Motion to Adopt a Resolution Receiving Bids and Awarding the Contract for the TH 3 Turn Lane Improvements, City Project 456. BACKGROUND: On Friday,April 25, 2014, seven bids were received for the TH 3 Turn Lane Improvements Project and read aloud publicly. The low bidder is Pember Companies, Inc. who submitted a base bid in the amount of$290,868.92. The low base bid amount of$290,868.92 is 6.9% lower than the estimated construction cost of$312,567.35. This project involves the construction of a right turn lane located on Trunk Highway 3, south of Lower 1476 Street. Improvements associated with the construction of a right turn lane include removal of the existing curb and sidewalk, relocation of storm sewer and street lights, and construction of the right turn lane. It is anticipated that the utility and roadway improvements will be complete by the end of June 2014. SUMMARY: Staff recommends that Council adopt the attached resolution receiving the bids and awarding the contract for the TH 3 Turn Lane Improvements Project, City Project 456. G:\ENGPROJ\456\Council Items\20140506 CC Receive Bids-Award Contract.docx CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2014 — A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR THE TH 3 TURN LANE IMPROVEMENTS PROJECT CITY PROJECT 456 BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1. All bids on construction of the TH 3 Turn Lane Improvements Project are hereby received and tabulated. 2. Based on the Base Bid, the bid of Pember Companies, Inc. in the amount of$290,868.92 for the construction of said improvements is in accordance with the plans and specifications and advertisement for bids, and is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowest bidders shall be retained until a contract has been executed. ADOPTED this 6`h day of May, 2014. William H. Droste, Mayor ATTEST: Amy Domeier,City Clerk Central is,7 0 Park cr I sT Wharal* W uJ <1. -1 4:"8 if 1 O Q f/ J UJ Z m Ce / 146TH ST W < m m 146TH ST L. 147TH W LOWER 147T ST W II L '17\T ! ST #17/ C Q Z ! rH T W < z ! H Camfield w Park U / a_ = 149TH —' i cn ! w BREIS ST W / Z Q � CT _ ! WI L. °° ! co 42 ) ,cp... / Lu ,,,f // qq- IZag T/GIS/City/Maps/Departmental Maps/Engineering/Chris/Location Map-456 4ROSEMOUNT TH 3 Turn Lane Improvements N MINNESOTA City Project 456, April 2014 WSB .Y:f„rxiatr„,!»c. engineering•planning•environmental.construction 701 Xenia Avenue South Suite 300 Minneapolis,MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 April 25, 2014 Honorable Mayor and City Council City of Rosemount 2875— 145th Street West Rosemount,MN 55068 Attn: Jean Harrington/Karin Kladar, Public Works Re: Trunk Highway 3 Turn Lane Addition City of Rosemount Project No.456 WSB Project No. 1928-140 Dear Mayor and Council Members: Bids were received for the above-referenced project on Friday, April 25,2014, and were opened and read aloud. Seven bids were received. The bids were checked for mathematical accuracy and tabulated. Please find enclosed the bid tabulation indicating the low bid as submitted by Pember Companies, Inc. of Menomonie, WI, in the amount of$290,868.92. The Engineer's Estimate was $311,342.35. We recommend that the City Council consider these bids and award a contract in the amount of $290,868.92 to Pember Companies, Inc. based on the results of the bids received. Sincerely, WSB&Associates,Inc. Nicholas Hentge , PE Project Manager Enclosures cc: Brent Pember, Pember Companies, Inc. Andy Brotzler, City of Rosemount Phil Olson, City of Rosemount srb St.Cloud• Minneapolis•St.Paul Equal Opportunity Employer wsbeng.com .C:0192N-1+O:IJnrrrr•C'orr.rrnrcrinn:hh,n./TR RR.'Ch1IIDT../,,,,c-OA751td c BID TABULATION SUMMARY PROJECT: Trunk Highway 3 Turn Lane Addition City Project No.456 OWNER: City of Rosemount, MN WSB PROJECT NO.: 1928-140 BIDS OPENED: Friday,April 25, 2014, at 10:00 a.m. Bid Addendum Contractor Bond (5%) Received Grand Total Bid 1 Pember Companies, Inc. X N/A $290,868.92 2 Minnesota Dirt Works, Inc. X N/A $308,672.00 3 Danner, Inc. X N/A $319,074.69 4 Max Steininger, Inc. X N/A $352,424.16 5 Northdale Construction Co., Inc. X N/A $375,103.63 6 Ryan Contracting Co. X N/A $392,526.50 7 Bituminous Roadways, Inc. X N/A $435,676.90 Engineer's Opinion of Probable Cost $311,342.35 I hereby certify that this is a true and correct tabulation of the bids as received on April 25, 2014. Nicholas Hentges, PE, Project Manager * Denotes corrected figure K:101928-1401AdminlConsiruclion Admin11928-14 Bid Tab Summary-042514