HomeMy WebLinkAbout6.f. Receive Bids/Award Contract - Bacardi Avenue Street & Utility Improvements, City Project 452 RosEmou1 1 EXECUTIVE SUMMARY CITY COUNCIL City Council Meeting: June 3, 2014 AGENDA ITEM: Receive Bids/Award Contract — Bacardi AGENDA SECTION: Avenue Street & Utility Improvements, City Consent Project 452 PREPARED BY: Andrew J. Brotzler, PE, Director of Public AGENDA NO. ,-� Works / City Engineer ATTACHMENTS: Resolution; Map; Letter of APPROVED BY Recommendation; Bid Summary RECOMMENDED ACTION: Motion to Adopt a Resolution Receiving Bids and Awarding the Contract for the Bacardi Avenue Street & Utility Improvements, City Project 452, subject to the City's receipt of the signed Development Agreement and satisfactory Letter of Credit, from Lennar for Bella Vista 2nd Addition, by 4:30 p.m. on June 11, 2014. BACKGROUND: On Friday,March 21, 2014, five bids were received for the Bacardi Avenue Street&Utility Improvements Project and read aloud publicly. The low bidder is Ryan Contracting Co.who submitted a bid in the amount of$2,661,604.50. The low bid amount of$2,661,604.50 is 29.8%lower than the estimated construction cost of$3,792,988.40. Bacardi Avenue is currently a gravel road and is identified in the Comprehensive Plan as a minor collector roadway. This construction project will extend Bacardi Avenue north from Bonaire Path to the future intersection with 130th Street West. The proposed improvements include the construction of Bacardi Avenue as a three lane urban minor collector including the installation of water main, sanitary sewer, storm sewer, concrete curb &gutter, and the construction of approximately 2,600 linear feet of new roadway with bituminous trail. It is anticipated that the Bacardi Avenue utility and roadway improvements will be complete by the end of the 2014 construction season. Bituminous wear course, final striping, and final restoration items are scheduled to be completed in the spring of 2015. The Bacardi Avenue Street and Utility Improvements Project will be partially funded by the developer of Bella Vista,Lennar. At this time, the developer has not submitted the signed Development Agreement and Letter of Credit. Conditional approval of the contract is contained in the resolution. SUMMARY: Staff recommends that Council adopt the attached resolution receiving the bids and awarding the contract for the Bacardi Avenue Street&Utility Improvements Project, City Project 452. G:\ENGPROJ\452\Council Items\20140603 CC Receive Bids-Award Contract.docx CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2014— A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR THE BACARDI AVENUE IMPROVEMENTS PROJECT CITY PROJECT 452 BE IT RESOLVED,by the City Council of the City of Rosemount, Minnesota, as follows: 1. All bids on construction of the Bacardi Avenue Improvements Project are hereby received and tabulated. 2. Based on the Base Bid, the bid of Ryan Contracting, Inc. in the amount of$2,661,604.50 for the construction of said improvements is in accordance with the plans and specifications and advertisement for bids, and is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Deputy City Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount, conditioned upon the City's receipt of the signed Development Agreement and satisfactory Letter of Credit, from Lennar for Bella Vista 2nd Addition, by 4:30 p.m. on June 11,2014. 4. The Deputy City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowest bidders shall be retained until a contract has been executed. ADOPTED this 3rd day of June, 2014. William H. Droste, Mayor ATTEST: Jeffrey A. May, Deputy City Clerk Bacardi Avenue Improvements rr ROSEMOUNT City Project 452 . : , . ; , . .,,. ; 11 ■ iv s, ii./ et • US 0 Z < NI:n) .. W > < < U Z < .J 128TH CO Lti L..1 UJ > ST W > > < < < ');) < < -J 6:), 123TH 7:1 z .< 0 Z .ey. ST 'v\/ 0 —J W "9:1.. MCMENC ttr ea CO POND 130TH ST W I , , . m I i KEEGAN LAKE < 132ND CT W KEEGAN LAKE .... 6,04, Ct BRONZE. 4/A6, < 0 CT ' Aril., k ,3,3,Busi 42, Ca ›- 133RD ST 11.1 'ARE N ■,011^3' ','- ,1,- ,, \l 135-Vrk -C.,1" POND BONAIRE PATH W . 135T14 51"f4 To 136T" >. , 0 _c /. .. ,..„ CT BIRDSONG al > MARE POND 4,4 Kr . . ATHENA 4fr 1,, i.-- a Brockway v) "7" BIRDSONG PATH a % . 7 (' 4/ a. Park P " . Cr) 0 50 O -q -I -< 136TH ST VV ,0 O■ '64*. ,S. in A■ 7:.. .7-, i 4i, -V00 BRONZE < '11 trockway p K w y r7 z (..) CI, 'It Park z- ;— •F" ONNEMARA TR/ . 0 TRL L. 1 38TH ST 1,1! i . CONN etAilk ,01..1MN14, -17. p..,.. -0 Te vA1,10.V13`1\ 138TH 4 A, 0 Icic' 138TH ST W l'‘C, > lr 5 'CI et >t i*c1 L U.w 3»193 T8TH H w S T S T W w V> .',. "- 0 J P BELVIDERE 0 p 5 0- D 7. u., 7 ,T.■ 65 ,?T' (j," 140TH ST W --! c, cl. ... zlk-■ ST W ;Tw 0 z Lo c'r r <UJ o > UJ Z BELFAST 0 Erickson Park if,r ,..., , 0,4 _ 0 .3,c__\y,. . -‘EL CI Pn-,-. ,-,\-) 0 550 1,100 2,200 3,300 4,400 N , 1 Feet June 2013 T:/GIS/City/Maps/Departmental Maps/Engineering/Chris/Location map-452 WSB engineering•planning•environmental.construction 701 Xenia Avenue South Suite 300 Minneapolis,MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 March 21,2014 Honorable Mayor and City Council City of Rosemount 2875 — 145th Street West Rosemount,MN 55068 Attn: Jean Harrington/Karin Kladar,Public Works Re: Bacardi Avenue Street Improvement Project S.A.P. 208-134-001 City of Rosemount Project No. 452 WSB Project No. 1916-92 Dear Mayor and Council Members: Bids were received for the above-referenced project on Friday,March 21,2014,and were opened and read aloud. Five bids were received. The bids were checked for mathematical accuracy and tabulated. Please find enclosed the bid tabulation indicating the low bid as submitted by Ryan Contracting Co. of Elko New Market,MN, in the amount of$2,661,604.50. The Engineer's Estimate was $3,792,988.40. We recommend that the City Council consider these bids and award a contract in the amount of $2,661,604.50 to Ryan Contracting Co. based on the results of the bids received. Sincerely, WSB&Associates,Inc. c208110 Phil Olson,PE Project Manager Enclosures cc: Thomas Ryan, Ryan Contracting Co. Andy Brotzler, City of Rosemount srb St.Cloud• Minneapolis•St.Paul Equal Opportunity Employer wsbeng.com K.101916-920AhninlConstruction AdminILTR RECMAIDTN-hmcc-032114.doc BID TABULATION SUMMARY PROJECT: Bacardi Avenue Street Improvement Project S.A.P.208-134-001 City Project No.452 OWNER: City of Rosemount, MN WSB PROJECT NO.: 1916-920 BIDS OPENED: Friday, March 21, 2014,at 10:00 a.m. Bid Add. No. 1 Contractor Bond (5%) Received Grand Total Bid 1 Ryan Contracting Co. X X $2,661,604.50 2 Geislinger&Sons, Inc. X X $2,759,444.76* 3 A-1 Excavating, Inc. X X $3,189,010.00 4 LaTour Construction, Inc. X X $3,554,276.95 5 R. L. Larson Excavating, Inc. X X $3,868,946.46 Engineer's Opinion of Probable Cost $3,792,988.40 I hereby certify that this is a true and correct tabulation of the bids as received on March 21, 2014. c-j2(282/02 Philip C. Olson, PE, Project Manager * Denotes corrected figure K:101916-9201AdminIConsduction Admin11916-92 Bid Tab Summary-032114