HomeMy WebLinkAbout6.a. Greystone 3rd Addition - Preliminary Plat4ROSEMOUNTEXECUTIVE SUMMARY
PARKS AND RECREATION COMMISSION
Parks and Recreation Commission Regular Meeting: June 23, 2014
AGENDA ITEM: Greystone 3rd Addition - Preliminary Plat
AGENDA SECTION:
Old Business
PREPARED BY: Dan Schultz, Parks and Recreation
AGENDA NO.
Director
6 a.
ATTACHMENTS: Location Map and Preliminary Plat
APPROVED BY: /QS_
RECOMMENDED ACTION: Motion to recommend the City Council approve the Greystone
3`d Addition - Preliminary Plat with the conditions outlined in the executive summary.
ISSUE
The Greystone 3rd Addition Preliminary Plat is located east of Akron Avenue and just south of Bonaire
Path and the rail road tracks. The plat consists of 66 single family lots. The parks dedication requirement
for 66 units is either 2.64 acres of land or cash in lieu of land.
Staff is recommending that we collect a combination of land and cash in lieu of land to satisfy the parks
dedication requirements for 66 units in the Greystone 3rd Addition Preliminary Plat. As you may recall,
the recommendation for the original 54 units in the Greystone 1st and 2nd Additions plats were that they
be approved without land dedication or payment of park dedication fees with an agreement that the park
dedication for the 1st and 2nd Additions be fulfilled within the 3rd Addition. This would allow the City to
combine the original park dedication requirements for the first 54 units with the future requirements, to
build a park that is the sized to appropriately meet the needs of the development.
Based on the land dedication for the earlier plats (54 units) and the current plat (66 units), the land
dedication requirement is 4.80 acres of land (120 units x .04 acres per unit). Staff is recommending the City
accept Oudot C which is 6.01 acres and consider 3.37 acres of currently unencumbered land dedication
credit. Within the Greystone 3rd Addition Preliminary Plat, a new sanitary sewer line is proposed within
the parkland directly west of the Xcel Transmission line easement. The developer will not receive land
dedication credit for the sanitary sewer line construction limits in the park area. The developer will also
not receive land dedication credit for 2.64 acres of land due to an overhead power line easement and
infiltration ponding. The remainder of the parks dedication will be paid as cash in -lieu of land.
Staff does recommend that the developer adjust the grading plan to allow for a trail to benched in on the
south side of the park area near the infiltration pond.
Staff has also reviewed the placement of the sidewalks in the preliminary plat and feels they will meet the
needs of the neighborhood.
101'sk A.
Dakota County,
Disclaimer: Map and parcel data are believed to be accurate, but accuracy is not guaranteed. This is not a Map Scale
legal document and should not be substituted for a title search, appraisal, survey, or for zoning 1 inch = 874 feet
verification. Dakota County assumes no legal responsibility for the information contained in this data. 6/16/2014
fl
I
€ice
ilAll''if
All
Silwig m
.• . .• .
� aim �m �—a%*^ , �.`��`/
`�� �,/ �
' 'i
will
FF
MCI
'% 7�r
N-M art
I�
NO
��WO
iII
�i MI!