Loading...
HomeMy WebLinkAbout6.h. Receive Bids/Award Contract - Prestwick Place 10th Addition Street and Utility Improvements, City Project 457 R('11SEMOUN 1 EXECUTIVE SUMMARY CITY COUNCIL City Council Meeting: August 19, 2014 AGENDA ITEM: Receive Bids/Award Contract— Prestwick AGENDA SECTION: Place 10 t Addition Street and Utility Consent Improvements, City Project 457 PREPARED BY: Phil Olson, PE, Assistant City Enginw AGENDA NO. ATTACHMENTS: Resolution; Bid Summary; Letter of APPROVED BY: Recommendation; Map RECOMMENDED ACTION: Motion to Adopt a Resolution Receiving Bids and Awarding the Contract for Prestwick Place 10th Addition Street and Utility Improvements, City Project 457. BACKGROUND: On Tuesday,August 12, 2014, four bids were received for the Prestwick Place 10th Addition Street and Utility Improvements Project and read aloud publicly. The low bidder is S. R. Weidema, Inc.who submitted a base bid in the amount of$698,831.65. The low base bid amount of$698,831.65 is 0.4% more than the estimated construction cost of$696,088.50. All costs associated with this project will be funded by the developer, U.S. Home Corporation, Inc. through a combination of cash payment for overhead and special assessments for the construction costs and trunk fees. Prestwick Place 10th Addition Street and Utility Improvements, City Project 457,is a continuation of the overall Prestwick development. It includes 26 single-family lots located south of Connemara Trail, just east of the Bloomfield development. It is anticipated that the utility and roadway improvements for the Prestwick Place Wh Addition will be complete by fall 2014. SUMMARY: Staff recommends that Council adopt the attached resolution receiving the bids and awarding the contract for Prestwick Place 10th Addition Street and Utility Improvements, City Project 457. G:A1,'1NGPR0J\457\Counci1 Items\20140819 CC Receive Bids&Award Contract.docx CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2014 - A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR THE PRESTWICK PLACE 10TH STREET AND UTILITY IMPROVEMENTS CITY PROJECT 457 BE IT RESOLVED,by the City Council of the City of Rosemount, Minnesota, as follows: 1. All bids on construction of the Prestwick Place 10th Addition Street and Utility Improvements are hereby received and tabulated. 2. Based on the Base Bid, the bid of S. R. Weidema, Inc. in the amount of$698,831.65 for the construction of said improvements is in accordance with the plans and specifications and advertisement for bids, and is the lowest responsible bid and shall be and hereby is accepted contingent upon securing all necessary right-of-way. 3. Upon securing all necessary right-of-way, the Mayor and City Clerk are authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of the successful bidder and the next two lowest bidders shall be retained until a contract has been executed. ADOPTED this 19th day of August, 2014. William H. Droste, Mayor ATTEST: Clarissa Hadler, City Clerk 73 O 141 ST 0� ST E STN 11 U.J AID AlR AvE UJ ST E 0 Prestwic 4 14Ji Plac , T Pa a1 ND O NS FIELD TER WAY 145TH ST W T:/GIS/City/Maps/Departmental Maps/Engineering/Chris/Location Map-457 1[I,*ROSEMO� Prestwick Place 10th N M I N N E S O TA City Project 457, July 2014 BID TABULATION SUMMARY PROJECT: Prestwick Place 10th Addition Street and Utility Construction City Project No.457 OWNER: City of Rosemount, MN WSB PROJECT NO.: 1928-420 BIDS OPENED: Tuesday,August 12, 2014, at 10:00 a.m. Bid Add. No. 1 Contractor Bond (5%) Received Grand Total Bid 1 S. R. Weidema, Inc. X X $698,831.65 2 Northwest Asphalt, Inc. X X $705,506.72* 3 Ryan Contracting Co. X X $753,043.35 4 Douglas-Kerr Underground, LLC X X $753,929.28 Engineer's Opinion of Probable Cost $696,088.50 1 hereby certify that this is a true and correct tabulation of the bids as received on August 12, 2014. Q�� Philip C. Olson, PE, Project Manager * Denotes corrected figure K:101928-4201AdminlConstruction Admin11928-42 Bid Tab Summary-081214