EXECUTIVE SUMMARY
City Council Meeting: March 17, 2015
AGENDA ITEM: Receive Bids/Award Contract-Well 16,
City Project 416
AGENDA SECTION:
Consent
PREPARED BY: Phil Olson, PE, Assistant City Engineer AGENDA NO.
ATTACHMENTS: Resolution; Map; Letter of
Recommendation; Bid Tabulation APPROVED BY:
RECOMMENDED ACTION: Motion to Adopt a Resolution Receiving Bids and Awarding
the Contract for the Construction of Well 16 to E.H. Renner & Sons, Inc.
ISSUE:
Receive bids and award contract for the Well 16, City Project 416.
BACKGROUND:
On Friday, February 27, 2015, three (3) bids for the construction of Well 16, City Project 416 were
received and read aloud publicly. The low bidder is E.H. Renner & Sons, Inc. with a bid of $422,585.
This is 5% lower than the Engineer’s estimate of $445,120.
This project includes the construction of City Well 16, located on Bacardi Avenue north of Bonaire Path,
as shown on the attached map. It will include the drilling of the well shaft and installation of the pump.
The construction of the well house will be bid separately in the future.
Construction of the well is expected to be completed in 2015. The well house is expected to be completed
and the well brought online in 2016. Costs associated with the project will be funded by the Water Core
Fund.
SUMMARY:
Staff recommends City Council adopt the resolution to receive the bids and award the contract for the
construction of Well 16 to E.H. Renner & Sons, Inc.
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2015 –
A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT
FOR WELL 16, CITY PROJECT 416
BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows:
1. All bids on construction of Well 16 have been received and tabulated.
2. The bid of E. H. Renner & Sons, Inc. in the amount of $422,585 for the construction of said
improvements is in accordance with the plans and specifications and advertisement for bids,
and is the lowest responsible bid and shall be and hereby is accepted.
3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said
bidder for the construction of said improvements for and on behalf of the City of
Rosemount.
4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the
deposits made with their bids, except that the deposit of all successful bidder and the next
two lowest bidders shall be retained until a contract has been executed.
ADOPTED this 17th day of March, 2015.
William H. Droste, Mayor
ATTEST:
Clarissa Hadler, City Clerk
M
e
a
d
o
w
s
P
a
r
k
MARE POND
MAREPOND
B
E N G A L A V E W
A
Z
A
L
E
A
A
V
E
138TH A U T U M NWOOD
B A C A R D I A V E
B ON A I R E PATH W
B I R C H W O O D A V E
B
E
L
M
O
N
T
T
R
L
A
U
T
U
M
N
W
O
O
DC
T
A V E
AT
RIU
M A
V
E
1 3 9 T H
S T W
BIRDSONG PATH
TR L
BIRDSONG CT
A
T
W
O
O
D
A
V
E
C O N N
T
R
L
136TH ST W
A U T U M N
T R L
BIR M I N G H A M
C T
ATWOOD
A T W A T E R
P A T H ATWOOD
AVE
AVE
ATRIUM
ATHENA
CT
A T W A T E R
C T
ATHENA W
AY
B
I
R
N
A
M
W
O
O
D
E M A R A
ST W
131STST
A
Y
R
F
I
E
L
D
C
T
A
Y
R
F
I
E
L
D
C
I
R
^
T:/GIS/City/Maps/Departmental Maps/Engineering/Chris/Location Map - 416
Well 16
City Project 416, Septembe r 2013
engineering planning environmental construction 701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
Tel: 763-541-4800
Fax: 763-541-1700
March 12, 2015
Honorable Mayor and City Council
City of Rosemount
2875 – 145th Street West
Rosemount, MN 55068
Attn: Jean Harrington/Karin Kladar, Public Works
Re: Municipal Production Well No. 16
City of Rosemount Project No. 416
WSB Project No. 1582-18
Dear Mayor and Council Members:
Bids were received for the above-referenced project on Friday, February 27, 2015, and were opened and
read aloud. Three bids were received. The bids were checked for mathematical accuracy and tabulated.
Please find enclosed the bid tabulation indicating the low bid as submitted by E.H. Renner & Sons, Inc. of
Elk River, MN, in the amount of $422,585.00, which includes the Base Bid plus Alternate 1. The
Engineer’s Estimate was $445,120.00.
The alternate includes pumping equipment necessary for an aquifer pump test that may be required by the
Minnesota Department of Natural Resources (MnDNR). The MnDNR requirements will be finalized
once the City has applied for to amend their Water Appropriations Permit. The application to amend the
permit can be submitted once the pumping capacity is determined following the test pumping of the
production well.
We recommend that the City Council consider these bids and award a contract in the amount of
$422,585.00 to E.H. Renner & Sons, Inc. based on the results of the bids received.
Sincerely,
WSB & Associates, Inc.
Jamie Wallerstedt, PE
Project Manager
Enclosures
cc: E.H. Renner & Sons, Inc.
Andy Brotzler, City of Rosemount
ef
Equal Opportunity Employer
wsbeng.com
K:\01582-180\Admin\Construction Admin\LTR RECMMDTN-hmcc-030215.doc
K:\01582-180\Admin\Construction Admin\1582-18 bid tab summary 030215
PROJECT:
OWNER:
City of Rosemount, MN
WSB PROJECT NO.:
1582-18
Bids Opened: Friday, February 27, 2015 10:00am
Contractor Bid Security (5%)
Addenda
Received Base Bid Total Baste Bid + Alternate 1
1 E.H. Renner & Sons X X $372,325.00 $422,585.00
2 Mark J Traut Wells X X $441,770.00 $481,490.00
3 Keys Well Drilling X X $511,680.00 $559,420.00
Engineer's Opinion of Cost $381,520.00 $445,120.00
Denotes corrected figure
Jamie Wallerstedt, PE Project Manager
BID TABULATION SUMMARY
I hereby certify that this is a true and correct tabulation of the bids as received on February 27, 2015
Municipal Production Well No. 16
Page 1 K:\01582-180\Admin\Construction Admin\1582-18 bid tab 022715
I hereby certify that this is an exact reproduction of bids received.
No.Item Units Qty Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price
1 MOBILIZATION / DEMOBILIZATION LUMP SUM 1 28,300.00$ 28,300.00$ 26,800.00 $26,800.00 $19,850.00 $19,850.00 $80,000.00 $80,000.00
2 DRILL / DRIVE 30" CASING LIN FT 205 315.00$ 64,575.00$ 265.00 $54,325.00 $375.00 $76,875.00 $370.00 $75,850.00
3 DRILL 30" NOMINAL OPEN HOLE LIN FT 203 150.00$ 30,450.00$ 195.00 $39,585.00 $250.00 $50,750.00 $250.00 $50,750.00
4 INSTALL 24" CASING LIN FT 410 100.00$ 41,000.00$ 98.00 $40,180.00 $136.00 $55,760.00 $110.00 $45,100.00
5 DRILL 24" NOMINAL OPEN HOLE LIN FT 92 100.00$ 9,200.00$ 95.00 $8,740.00 $125.00 $11,500.00 $160.00 $14,720.00
6 PLUMBNESS & ALIGNMENT TEST TEST 1 500.00$ 500.00$ 350.00 $350.00 $650.00 $650.00 $500.00 $500.00
7 GROUT ANNULAR SPACE CU YD 45 400.00$ 18,000.00$ 480.00 $21,600.00 $590.00 $26,550.00 $500.00 $22,500.00
8 F.I.R. DEVELOPMENT EQUIPMENT LUMP SUM 1 10,000.00$ 10,000.00$ 12,000.00 $12,000.00 $4,850.00 $4,850.00 $18,000.00 $18,000.00
9 BLASTING WITH EXPLOSIVES LBS 200 25.00$ 5,000.00$ 40.00 $8,000.00 $35.00 $7,000.00 $45.00 $9,000.00
10 SANDSTONE REMOVAL CU YDS 850 75.00$ 63,750.00$ 80.00 $68,000.00 $85.00 $72,250.00 $85.00 $72,250.00
11 AIR DEVELOPMENT HOURS 200 250.00$ 50,000.00$ 200.00 $40,000.00 $325.00 $65,000.00 $275.00 $55,000.00
12 DISPOSAL OF SANDSTONE CU YDS 850 12.00$ 10,200.00$ 12.00 $10,200.00 $13.00 $11,050.00 $14.00 $11,900.00
13 RE-INSTALL DEVELOPMENT EQUIPMENT LUMP SUM 1 750.00$ 750.00$ 500.00 $500.00 $850.00 $850.00 $2,000.00 $2,000.00
14 F.I.R. TEST PUMPING EQUIPMENT LUMP SUM 1 7,500.00$ 7,500.00$ 9,500.00 $9,500.00 $5,850.00 $5,850.00 $12,000.00 $12,000.00
15 12 - INCH PVC DISCHARGE PIPING LIN FT 1000 20.00$ 20,000.00$ 5.00 $5,000.00 $8.50 $8,500.00 $10.00 $10,000.00
16 TEST PUMPING HOURS 88 150.00$ 13,200.00$ 195.00 $17,160.00 $185.00 $16,280.00 $200.00 $17,600.00
17 RE-INSTALL TEST PUMPING EQUIPMENT LUMP SUM 1 500.00$ 500.00$ 500.00 $500.00 $1,500.00 $1,500.00 $2,500.00 $2,500.00
18 WATER ANALYSIS LUMP SUM 1 1,500.00$ 1,500.00$ 1,500.00 $1,500.00 $1,250.00 $1,250.00 $2,000.00 $2,000.00
19 SAND TESTS TEST 5 75.00$ 375.00$ 25.00 $125.00 $75.00 $375.00 $50.00 $250.00
20 WELL VIDEO SURVEY TELEVISION
SURVEY
1 1,500.00$ 1,500.00$ 2,260.00 $2,260.00 $1,200.00 $1,200.00 $1,500.00 $1,500.00
ENGINEERS ESTIMATE E.H. Renner & Sons Keys Well DrillingMark J. Traut Wells, Inc.
Schedule A: Well No. 16 Construction
BID TABULATION
MUNICIPAL PRODUCTION WELL NO. 16
CITY OF ROSEMOUNT, MN
OWNER:PROJECT CONSULTANT:
City of Rosemount WSB & Associates, Inc.
2875 145th Street West 701 Xenia Avenue South, Suite 300
Rosemount, MN 55068 Minneapolis, MN 55416
SUBMIT TO / BID OPENING LOCATION:BID SUBMITTAL TIME:
City of Rosemount Time: 10:00 a.m.
Jamie Wallerstedt, PE
Denotes Corrected Figure
2875 145th Street West Date: February 27, 2015
Rosemount, MN 55068
Page 2 K:\01582-180\Admin\Construction Admin\1582-18 bid tab 022715
No.Item Units Qty Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price
ENGINEERS ESTIMATE E.H. Renner & Sons Keys Well DrillingMark J. Traut Wells, Inc.
21 SILT FENCE LIN FT 300 6.00$ 1,800.00$ 10.00 $3,000.00 $3.00 $900.00 $5.00 $1,500.00
22 SOUND BARRIER SQ FT 480 4.00$ 1,920.00$ 5.00 $2,400.00 $3.50 $1,680.00 $12.00 $5,760.00
23 GEOPHYSICAL LOG LOG 1 1,500.00$ 1,500.00$ 600.00 $600.00 $1,300.00 $1,300.00 $1,000.00 $1,000.00
381,520.00$ $372,325.00 $441,770.00 $511,680.00
24 F.I.R. AQUIFER TEST PUMPING EQUIPMENT LUMP SUM 1 10,000.00$ 10,000.00$ $12,500.00 $12,500.00 3,500.00 $3,500.00 8,500.00 $8,500.00
25 12 - INCH PVC DISCHARGE PIPING LIN FT 1000 20.00$ 20,000.00$ $5.00 $5,000.00 8.50 $8,500.00 9.00 $9,000.00
26 DNR AQUIFER TEST HOURS 168 200.00$ 33,600.00$ $195.00 $32,760.00 165.00 $27,720.00 180.00 $30,240.00
63,600.00$ $50,260.00 $39,720.00 $47,740.00
TOTAL BASE BID (SCHEDULE A)381,520.00$ $372,325.00 $441,770.00 $511,680.00
TOTAL BASE BID + ALTERNATE 1 445,120.00$ $422,585.00 $481,490.00 $559,420.00
Total Schedule A: Well No. 16 Construction
Alternate 1: Aquifer Test
Total Alternate 1: Aquifer Test