HomeMy WebLinkAbout6.k. Receive Bids Award Contract - 2015 Trail Improvement Project4ROSEMOUNTEXECUTIVE SUMMARY
CITY COUNCIL
City Council Meeting: June 16, 2015
AGENDA ITEM: Receive Bids/Award Contract — 2015 Trail
AGENDA SECTION:
Improvement Project, Engineering Project
Consent
0174
PREPARED BY: Phil Olson, PE, Assistant City Engine
AGENDA NO. 61.
ATTACHMENTS: Resolution; Letter of Recommendation;
APPROVED BY: ddj
Bid Summary
RECOMMENDED ACTION: Motion to Adopt a Resolution Receiving Bids and Awarding
the Contract for the 2015 Trail Improvements, Engineering Project 0174, to Aslakson's
Blacktopping Services.
BACKGROUND:
On Friday, June 5, 2015, three bids were received for the 2015 Trail Improvement Project and read aloud
publicly. The low bidder is Aslakson's Blacktopping Services who submitted a base bid in the amount of
$176,289.20, which is 4.1% higher than the estimated construction cost of $169,255.
It is anticipated that the project will begin in July, 2015 and be completed by early -September, 2015. A
majority of this project will be funded by the Pedestrian Improvement Fund, with approximately $7,800
being funded by the Storm Water Utility Fund.
SUMMARY:
Staff recommends that Council adopt the attached resolution receiving the bids and awarding the contract
for the 2015 Trail Improvement, Engineering Project 0174.
G:\ENGPROJ\ENG 0174 - 2015 Trail and Parking Lot Improvements\Council Items\20150616 CC Receive Bids Award Contract.docx
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2015 -
A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT
FOR THE 2015 TRAIL IMPROVEMENT PROJECT
ENGINEERING PROJECT 0174
BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows:
1. All bids on the repair and reconditioning of the 2015 Trail Improvement Project are hereby
received and tabulated.
2. The base bid of Aslakson's Blacktopping Services in the amount of $176,289.20 for the
construction of said improvements is in accordance with the plans and specifications and
advertisement for bids, and is the lowest responsible bid and shall be and hereby is accepted.
3. The Mayor and City Clerk are hereby authorized and directed to enter into a contract with said
bidder for the construction of said improvements for and on behalf of the City of Rosemount.
4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits
made with their bids, except that the deposit of the successful bidder and the next two lowest
bidders shall be retained until a contract has been executed.
ADOPTED this 16`}' day of June, 2015.
William H. Droste, Mayor
ATTEST:
Clarissa Hadler, City Clerk
WSB
&Associates, Inc.
engineering - planning • environmental • construction 477 Temperance Street
St Paul, MN 55101
Tel: 651-286-6450
Fax: 651-286-8488
June 8, 2015
Honorable Mayor and City Council
City of Rosemount
2875 145th Street West
Rosemount, MN 55068
Re: 2015 Trail Improvement Project
City of Rosemount Project No. ENG 174
WSB Project No. 1928-28
Dear Mayor and Council Members:
Bids were received for the above -referenced project on June 5, 2015 and were opened and read aloud.
Five bids were received. The bids were checked for mathematical accuracy and tabulated. Please find
enclosed the bid tabulation indicating the low bidder as Aslakson's Blacktopping Service in the amount of
$176,289.20. The Engineer's Estimate for the project was $169,255.00.
We recommend that the City Council consider these bids and award a contract in the amount of
$176,289.20 to Aslakson's Blacktopping Service based on the results of the bids received.
Sincerely,
WSB ssociates, Inc.
Phil Olson, PE
Project Manager
Enclosures
cc: Andy Brotzler, City of Rosemount
kkp
Equal Opportunity Employer
wsbeng.com
C:\Users\pcolAppData\Lo IkMicrosoll\Windows\Temporay Intemet Files\ContenLOutlook\Q43QSEU6\LTR -ndalion 060815.docr
BID TABULATION SUMMARY
PROJECT:
2015 Trail Improvement Project
OWNER:
City of Rosemount Project No. ENG 174
WSB PROJECT NO.:
1928-28
Bids Opened: Friday, June 5, 2015, at 10:00am
Engineer's Opinion of Cost $169,255.00
1 hereby certify that this is a true and correct tabulation of the bids as received on June 5, 2015.
Q2aiv,
Phil Olson, PE Project Manager
Denotes corrected figure
K:101928-2801AdminlConstruction Admin11928-28 Bid Tab Summary 060515
Contractor
Bid Security (5%)
Grand Total Bid
1
Aslakson's Blacktopping Service
X
$176,289.20
2
McNamara Countracting, Inc.
X
$203,853.80
3
Hardrives, Inc.
X
$218,854.70
4
Bituminous Roadways
X
$224,224.00
5
Barber Construction Co., Inc.
X
$233,445.00
Engineer's Opinion of Cost $169,255.00
1 hereby certify that this is a true and correct tabulation of the bids as received on June 5, 2015.
Q2aiv,
Phil Olson, PE Project Manager
Denotes corrected figure
K:101928-2801AdminlConstruction Admin11928-28 Bid Tab Summary 060515
A
WSB
R Associates, Inc.
engineering • planning • environmental • construction
June 8, 2015
Honorable Mayor and City Council
City of Rosemount
2875 145Th Street West
Rosemount, MN 55068
Re: 2015 Trail Improvement Project
City of Rosemount Project No. ENG 174
WSB Project No. 1928-28
Dear Mayor and Council Members:
477 Temperance Street
St. Paul, MN 55101
Tel: 651-2868450
Fax: 651-286-8488
Bids were received for the above -referenced project on June 5, 2015 and were opened and read aloud.
Five bids were received. The bids were checked for mathematical accuracy and tabulated. Please find
enclosed the bid tabulation indicating the low bidder as Aslakson's Blacktopping Service in the amount of
$176,289.20. The Engineer's Estimate for the project was $169,255.00.
We recommend that the City Council consider these bids and award a contract in the amount of
$176,289.20 to Aslakson's Blacktopping Service based on the results of the bids received.
Sincerely,
WSB ssocintes, Inc.
Phil Olson, PE
Project Manager
Enclosures
cc: Andy Brotzler, City of Rosemount
kkp
Equal Opportunity Employer
wsbeng.com
C\Uurs\pca\ApPU��nLLacalN1icmw0\Windmn\TmnPo,vy Inwn¢t FiWConlen0Hdwk1Q43Q5EU6WM m en&a M8156o
BID TABULATION SUMMARY
PROJECT:
2015 Trail Improvement Project
OWNER:
City of Rosemount Project No. ENG 174
WSB PROJECT NO.:
1928-28
Bids Opened: Friday, June 5, 2015, at 10:00am
I hereby certify that this is a true and correct tabulation of the bids as received on June 5, 2015.
Qxlxo-,�
Denotes corrected figure
Phil Olson, PE Project Manager
K901928-2801 dminlConshucfion Admin11929-28 Bid Tab Summary060515
Contractor
Bid Security (5%)
Grand Total Bid
1
Aslakson's Blacktopping Service
X
$176,289.20
2
McNamara Countracting, Inc.
X
$203,853.80
3
Hardrives, Inc.
X
$218,854.70
4
Bituminous Roadways
X
$224,224.00
5
Barber Construction Co., Inc.
X
$233,445.00
Engineer's Opinion of Cost
$169,255.00
I hereby certify that this is a true and correct tabulation of the bids as received on June 5, 2015.
Qxlxo-,�
Denotes corrected figure
Phil Olson, PE Project Manager
K901928-2801 dminlConshucfion Admin11929-28 Bid Tab Summary060515