Loading...
HomeMy WebLinkAbout9.a. City Projects Update City Projects Update Council City Council Public Receives Award Assessment Contract Payments cyo Project Project Name Authorizes Hearing Plans/Specs Open Bids Contract Start Date Hearing Contractor Amount To Date Complete Summary Number Plans/Specs Authorize Ad For Bid Drilling of the production well began in May. An obstruction was encountered during installation of the 30-inch casing at approximately E.H. Renner& 141 feet. The design was modified to a triple-cased design:a 24-inch casing will be drilled to the original depth(approximately 203 feet) 416 Well 16 10/01/13 N/A 11/18/14 02/27/15 03/17/15 05/26/15 N/A Sons, Inc. $422,585 $43,297 10% and an additional 18-inch inner liner casing will be added to the design.Abandoned Well 5 in Chippendale Park,which was originally planned to be used as observation well,will not be suitable.Well 5 will be sealed along with Well 4 later this year. A new observation well will be installed at Chippendale Park to satisfy the requirements of the appropriations permit for Well 16. 145th Street Easement agreement with Canandian Pacific is currentlybeingreviewed bythe CityAttorney(agreement is alreadyin place with Union Pedestrian UPRR,CPRR, g ( g 447 Improvements at 01/02/13 N/A N/A TBD Pacific). Railroad work will begin after agreement is executed. Sidewalk work will begin after railroad work. Sidewalk has already been RR Crossing installed on the southwest corner adjacent to the Park&Ride. Bacardi Avenue Ryan 452 Improvements 11/19/13 02/18/14 02/18/14 03/21/14 06/03/14 06/16/14 05/06/14 Contracting $2,922,416 $2,727,393 93% The project is substantially complete. The contractor is currently working on the pedestrain bridge as part of an independent contract. Company 453 Danbury Way 07/21/15 07/21/15 Council authorized the preparation of a feasibility report in November 2014. A Public Hearing will be held on July 21,2015. Council is Reconstruction expected to order the prorject and authorzie the Plans&Specs on July 21,2015. Construction is planned for 2016. Friedges This development includes 14 single-family homes by developer Friedges Excvating, Inc. Friedges is administering the contract 459 Wilde Lake Estates N/A N/A PRIVATE 04/27/15 N/A PRIVATE Contracting privately. Base course paving and utilites are currently installed. 462 Greystone 4th N/A N/A PRIVATE 04/13/15 N/A Nodland PRIVATE This development includes 47 single-family homes by developer Ryland Homes. Ryland Homes is administering the contract privately. Construction Base course paving and utilites are currently installed. Prestwick Place Nodland This development includes 34 single-family homes by developer U.S. Home Corporation(Lennar). Lennar is administering the contract 463 PRIVATE 11th N/A N/A PRIVATE 05/18/15 N/A Construction privately. Base course paving and utilites are currently installed. 464 Bella Vista 3rd N/A N/A PRIVATE N/A PRIVATE This development includes 28 single-family homes by developer U.S. Home Corporation(Lennar). Lennar is administering the contract privately. Mass grading is currently being completed. 465 132nd Street West 09/01/15 Council authorized the preparation of a feasibility report on June 2,2015. Improvements 466 Horseshoe Lake 05/05/15 N/A 08/04/15 08/21/15 09/01/15 N/A Council authorized final design on May 5,2015. Plans and specifications will be complete in August.Construction is anticipated Fall, Lift Station 2015. 467 Dunmore 1st This development includes 30 single-family homes by developer Copper Creek. It is anticipated that this will be a publicly bid project. Addition 468 Prestwick Place N/A N/A PRIVATE TBD N/A TBD PRIVATE This development includes 31 single-family homes by developer KRB Development I, Inc. KRB is administering the contract privately. 12th Mass grading is currently being completed. 1.5MG Ground Winter Request for Proposals have been distributed to six Engineering Consultants to for the design and construction administration of a new TBD Storage Tank N/A 2016 N/A 1.5MG ground storage tank and booster station to be located adjacent to the Bicardi Elevated Storage Tank(Tower) G:\ENGPROJ\Project Tracking\Project Update Updated: 07/15/2015