Loading...
HomeMy WebLinkAbout8.a. City Project Update City Projects Update Council City Council Receives Public Award Assessment Contract Payments % Project Project NameAuthorizes Plans/Specs Open BidsStart DateContractorSummary HearingContractHearingAmountTo DateComplete NumberPlans/SpecsAuthorize Ad For Bid Drilling of the production well began in May. An obstruction was encountered during installation of the 30-inch casing at approximately E.H. Renner & 416$422,585$63,15315% Well 1610/01/13N/A11/18/1402/27/1503/17/1505/26/15N/A141 feet. The design was modified to a triple-cased design: a 24-inch casing will be drilled to the original depth (approximately 203 feet) Sons, Inc. and an additional 18-inch inner liner casing will be added to the design. Completion is expected in January, 2016. Wells 4 & 5 Abandoned Well 5 in Chippendale Park, which was originally planned to be used as observation well, will not be suitable. Well 5 will be N/A Sealing, New N/A09/01/1509/29/1510/06/15Oct 2015N/Asealed along with Well 4 later this year. A new observation well will be constructed at Chippendale Park to satisfy the requirements of Observation Wellthe appropriations permit for Well 16. MDH and Dakota County grants have been obtained to help offset the cost of these projects. 145th Street Easement agreement with Canandian Pacific is currently being reviewed by the City Attorney (agreement is already in place with Union Pedestrian UPRR, CPRR, 447 01/02/13N/AN/APacific). Railroad work will begin after agreement is executed. Sidewalk work will begin after railroad work. Sidewalk has already been Improvements at TBD installed on the southwest corner adjacent to the Park & Ride. RR Crossing Danbury Way Council authorized the preparation of a feasibility report in November 2014. A Public Hearing was held on July 21, 2015. Council 453 07/21/1507/21/15 Reconstructionordered the prorject and authorzied the Plans & Specs on July 21, 2015. Construction is planned for 2016. Friedges This development includes 14 single-family homes by developer Friedges Excvating, Inc. Friedges is administering the contract PRIVATEPRIVATE 459 Wilde Lake EstatesN/AN/A04/27/15N/A Contractingprivately. Contractor is waiting for materials to be deliverd to the site before continuing with construction. Nodland This development includes 47 single-family homes by developer Ryland Homes. Ryland Homes is administering the contract privately. PRIVATEPRIVATE 462 Greystone 4thN/AN/A04/13/15N/A ConstructionBase course paving, sidewalk, trail and utilites are installed. Prestwick Place Nodland This development includes 34 single-family homes by developer U.S. Home Corporation (Lennar). Lennar is administering the contract PRIVATEPRIVATE 463 N/AN/A05/18/15N/A 11thConstructionprivately. Small utility installation is underway. This development includes 28 single-family homes by developer U.S. Home Corporation (Lennar). Lennar is administering the contract PRIVATEPRIVATE 464 Bella Vista 3rdN/AN/A08/03/15N/ASR Weidema privately. Mass grading has been completed, saniary sewer installation is underway. 132nd Street West 465 09/01/15Council authorized the preparation of a feasibility report on June 2, 2015. Improvements Horseshoe Lake Council authorized final design on May 5, 2015. Plans and specifications will be complete in August. Construction is anticipated Fall, 466 05/05/15N/A08/18/1509/04/1509/15/15N/A Lift Station2015. Dunmore 1st This development includes 30 single-family homes by developer Copper Creek. The final plat and subdivision agreement are expected 467 N/A Additionto be approved at the August 18, 2015 City Council meeting. Prestwick Place This development includes 31 single-family homes by developer KRB Development I, Inc. KRB is administering the contract privately. PRIVATEPRIVATE 468 N/AN/ATBDN/ATBD 12thMass grading is currently being completed. Request for Proposals have been received from five engineering consultants for the design and construction administration of a new 1.5MG Ground Winter ENG-179 N/AN/A1.5MG ground storage tank and booster station to be located adjacent to the Bicardi Elevated Storage Tank (Tower). Staff will review Storage Tank2016 the proposals and make a selection in late-August. C:\\Users\\klk\\AppData\\Local\\Temp\\8.a. City Project Update_325866\\8.a. City Project UpdateUpdated: 08/10/2015