Loading...
HomeMy WebLinkAbout6.i. Receive Bids - Award Contract – Horseshoe Lake Lift Station, City Project 466EXECUTIVE SUMMARY City Council Meeting: September 15, 2015 AGENDA ITEM: Receive Bids/Award Contract – Horseshoe Lake Lift Station, City Project 466 AGENDA SECTION: Consent PREPARED BY: Phil Olson, PE, Assistant City Engineer AGENDA NO. 6.i. ATTACHMENTS: Resolution; Map; Letter of Recommendation; Bid Summary APPROVED BY: ddj RECOMMENDED ACTION: Motion to Adopt a Resolution Receiving Bids and Awarding the Contract for the Horseshoe Lake Lift Station, City Project 466 BACKGROUND: On Friday, September 4, 2015, seven bids were received for the Horseshoe Lake Lift Station and read aloud publicly. The low bidder is Ryan Contracting Co., who submitted a base bid in the amount of $609,000 and a bid alternate in the amount of $35,000. The total bid amount of $644,000 is 21.0% lower than the estimated construction cost of $815,000. The lift station will be constructed at the south end of Horseshoe Lake. The lift station will pump storm water south to Mare Pond where it will connect to the City’s trunk storm sewer system. The lift station will also provide flood protection to the White Lake area in the future when storm sewer connections are made between White Lake and Horseshoe Lake. This project involves construction of the lift station, remaining forcemain and valve system. An alternate was included for additional electrical work and controls for water level monitoring. It is anticipated that the Horseshoe Lake Lift Station site work will be complete by November 30, 2015 and the electrical work and final restoration will be complete by July 1, 2016. SUMMARY: Staff recommends that Council adopt the attached resolution receiving the bids and awarding the contract for the Horseshoe Lake Lift Station, City Project 466. CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2015 – A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR THE HORSESHOE LAKE LIFT STATION CITY PROJECT 466 BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1.All bids on construction of the Horseshoe Lake Lift Station are hereby received and tabulated. 2.Based on the Base Bid and Alternate Bid, the bid of Ryan Contracting Co. in the amount of $644,000 for the construction of said improvements is in accordance with the plans and specifications and advertisement for bids, and is the lowest responsible bid and shall be and hereby is accepted. 3.The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4.The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowest bidders shall be retained until a contract has been executed. ADOPTED this 15th day of September, 2015. William H. Droste, Mayor ATTEST: Clarissa Hadler, City Clerk SÈ B E N G A L A V E W 130 T H W A Y A Z A L E A A V E A K R O N A V E (C R 7 3 ) A U T U M NWOOD B A C A R D I A V E BO NAIRE PATH W 130TH ST W 1 2 6 T H S T W 1 2 1 S T S T W B I R C H W O O D A V E 128TH 124T H CT W ATRIU M AVE ST W BIRDSONG PATH TRL A P P A L A C H I A N T R L BIRDSONG CT A T W O O D A V E CON N T R L 136TH ST W A U T U M N T R L B I R M I N G H A M C T P A T H ATWOOD A T W A T E R P A T H ATWOOD AVE AVE ATRIUM ATHENA CT A T W A T E R C T ATHEN A W AY B I R N A M W O O D A K R O N A V E (C R 7 3 ) E M A R A 131STST A Y R F I E L D C T A Y R F I E L D C I R MARE POND MAREPOND MCMENOMYPOND M e a d o w s P a r k WiklundPreserve T :/G I S /C i t y /M a p s /D e p a r t m e n t a l M a p s /E n g i n e e r i n g /C h r i s /L o c a t i o n M a p - T e m p l a t e Horseshoe Lake Lift Station City Project 466, April 2015 BID TABULATION SUMMARY PROJECT: Rosemount Horseshoe Lake Stormwater Lift Station OWNER: City of Rosemount, MN WSB PROJECT NO.: 1928-80 Bids Opened: Friday, September 4, 2015 at 10:00am Bid Security Contractor 5%) Base Bid Alternate Grand Total Bid 1 Ryan Contracting Co. X 609,000.00 35,000.00 644,000.00 2 Lametti & Sons, Inc. X 682,470.00 29,700.00 712,170.00 3 Minger Construction, Inc.X 835,800.00 28,250.00 863,250.00 4 Pember Companies, Inc.X 841,000.00 29,070.00 870,070.00 5 RL Larson Excavating, Inc. X 852,500.00 3,000.00 882,500.00 6 Peterson Companies, Inc. X 974,600.00 30,000.00 1,004,600.00 7 R&R Excavating, Inc. X 988,590.80 31,251.65 1,019,842.45 Engineer's Opinion of Cost 815,000.00 30,000.00 845,000.00 I hereby certify that this is a true and correct tabulation of the bids as received on September 4, 2015. W-Ca7- 11 ,11tr" .41 - Greg Johnson, PE Project Manager Denotes corrected figure K:101928-8001AdminlConstruction Admin11928-80 Bid Tab Summary 090815