Loading...
HomeMy WebLinkAbout6.j. Approve Change Order No. 1 – East Side Water Tower Improvements, Engineering Project 0173I:\City Clerk\Agenda Items\Approved Items\6.j. Approve Change Order No. 1 – East Side Water Tower Improvements, Engineering Project 0173.docx EXECUTIVE SUMMARY City Council Meeting: October 6, 2015 AGENDA ITEM: Approve Change Order No. 1 – East Side Water Tower Improvements, Engineering Project 0173 AGENDA SECTION: Consent PREPARED BY: Patrick Wrase, P.E., Public Works Director / City Engineer AGENDA NO. 6.j. ATTACHMENTS: Change Order 1 APPROVED BY: ddj RECOMMENDED ACTION: Motion to approve Change Order 1 for East Side Water Tower Improvement Project, Engineering Project 0173 BACKGROUND It is necessary to replace the pipe style safety climb device as part of the East Side Water Tower Improvement Project. This item was inadvertently omitted from the original bid. A copy of Change Order No. 1 is attached. These contract changes result in a net increase of $800 to the current contract amount of $234,800 for a new total of $235,600. SUMMARY Staff recommends Council approval of Change Order 1 for the East Side Water Tower Improvements Project, Engineering Project 0173. KLM ENGINEERING INC. P.O. Box 897.3394 Lake Elmo Ave.N.•Lake Elmo,MN 55042 651)773-5111 •Fax(651)773-5222 • August 25, 2015 Mr. Dick Howe Utilities Supervisor City of Rosemount 2875 — 145th Street West Rosemount, MN 55068 RE: Change Order No. 1 —Reconditioning of the 500,000 Gallon Elevated Water Tower East Side Tower) Located in Rosemount, Minnesota. KLM Project No. MN1683 Dear Mr. Howe, Enclosed is the documentation for Change Order No. 1 —Rosemount, Minnesota, East Side Tower. The change order is as follows: Replace the pipe style safety climb device in the base cone with a cable style safety climb. Cost: 800.00 Please sign and date the attached Change Order No. 1 and forward a copy to KLM and Classic Protective Coatings. Sincerely, KLM Engineering, Inc. Scott J. Kriese Project Supervisor SJK/is End: Change Order No. 1 Samba(p)2015 Projects/MN 1683 Rosemount/Change Order No. 1 082515.doc City of Rosemount CONTRACT CHANGE ORDER # 1 KLM Project No.: MN 1683 Change Order No.: 1 Date:August 25, 2015 Contractor: Classic Protective Coatings, Inc. The following Change Order No. 1 is an addition to the original contract. Replace the pipe style safety climb device in the base cone with a cable safety climb. 800.00 Total Addition Authorized Work 800.00 Original Contract Amount 234,800.00 Change Order No. l 800.00 New Contract Amounts 235,600.00 APPROVALS: Contractor: Cl. sic Protectiv• Coatings. Inc. Y: , _,l Title: eil/e4L. AGR Date: 8/2445- APPROVED 24 l5APPROVEDBY: City of Rosemount By: Title: Date: Samba(p)2015 Projects/MN 1683 Rosemount/CO k 1 082515 doe