EXECUTIVE SUMMARY
City Council Meeting: October 6, 2015
AGENDA ITEM: Approve Change Order No. 1 – East Side
Water Tower Improvements, Engineering
Project 0173
AGENDA SECTION:
Consent
PREPARED BY: Patrick Wrase, P.E., Public Works
Director / City Engineer AGENDA NO. 6.j.
ATTACHMENTS: Change Order 1 APPROVED BY: ddj
RECOMMENDED ACTION: Motion to approve Change Order 1 for East Side Water Tower
Improvement Project, Engineering Project 0173
BACKGROUND
It is necessary to replace the pipe style safety climb device as part of the East Side Water Tower
Improvement Project. This item was inadvertently omitted from the original bid. A copy of Change
Order No. 1 is attached.
These contract changes result in a net increase of $800 to the current contract amount of $234,800 for a
new total of $235,600.
SUMMARY
Staff recommends Council approval of Change Order 1 for the East Side Water Tower Improvements
Project, Engineering Project 0173.
KLM ENGINEERING INC.
P.O. Box 897.3394 Lake Elmo Ave.N.•Lake Elmo,MN 55042
651)773-5111 •Fax(651)773-5222 •
August 25, 2015
Mr. Dick Howe
Utilities Supervisor
City of Rosemount
2875 — 145th Street West
Rosemount, MN 55068
RE: Change Order No. 1 —Reconditioning of the 500,000 Gallon Elevated Water Tower
East Side Tower) Located in Rosemount, Minnesota. KLM Project No. MN1683
Dear Mr. Howe,
Enclosed is the documentation for Change Order No. 1 —Rosemount, Minnesota, East Side
Tower. The change order is as follows:
Replace the pipe style safety climb device in the base cone with a cable style safety
climb.
Cost: 800.00
Please sign and date the attached Change Order No. 1 and forward a copy to KLM and Classic
Protective Coatings.
Sincerely,
KLM Engineering, Inc.
Scott J. Kriese
Project Supervisor
SJK/is
End: Change Order No. 1
Samba(p)2015 Projects/MN 1683 Rosemount/Change Order No. 1 082515.doc
City of Rosemount
CONTRACT CHANGE ORDER # 1
KLM Project No.: MN 1683
Change Order No.: 1
Date:August 25, 2015
Contractor: Classic Protective Coatings, Inc.
The following Change Order No. 1 is an addition to the original contract.
Replace the pipe style safety climb device in the base cone with a cable safety climb.
800.00
Total Addition Authorized Work 800.00
Original Contract Amount 234,800.00
Change Order No. l 800.00
New Contract Amounts 235,600.00
APPROVALS:
Contractor: Cl. sic Protectiv• Coatings. Inc.
Y: , _,l Title: eil/e4L. AGR Date: 8/2445-
APPROVED
24
l5APPROVEDBY: City of Rosemount
By: Title: Date:
Samba(p)2015 Projects/MN 1683 Rosemount/CO k 1 082515 doe