Loading...
HomeMy WebLinkAbout6.l. Receive BidsAward Contract – Sidewalk ADA project for CDBG Funds, Connemara Trail and Biscayne Avenue EXECUTIVE SUMMARY City Council Meeting: October 6, 2015 AGENDA ITEM: Receive Bids/Award Contract – Sidewalk ADA project for CDBG Funds, Connemara Trail and Biscayne Avenue AGENDA SECTION: Consent PREPARED BY: Kim Lindquist, Community Development Director AGENDA NO. 6.l. ATTACHMENTS: Intersection Map, Resolution, Bid Tab APPROVED BY: ddj RECOMMENDED ACTION: Motion to Adopt a Resolution Receiving Bids and Awarding the Contract the Sidewalk ADA project to SUMMARY As the Council is aware, Rosemount receives CDBG funding annually through an allocation process administered by the County. For the last several years, staff has been applying funds to continue bringing public facilities up to current ADA standards. So far, the City has been able to modify curbcuts at some of the more heavily used pedestrian facilities along Connemara Trail and modifications to the bathroom at Erickson shelter. Parks and Recreation is starting to work on accessibility issues associated with the Central Park shelter with construction anticipated in 2016. The item tonight continues the ADA upgrades by approving a contract for replacement of curbcuts along Connemara Trail and Biscayne Avenue. The map attached illustrates the proposed intersections. Some of these intersections are fairly new however; new ADA regulations mean that the current curbcuts are obsolete. While staff does not anticipate reconstructing all the non-compliant ADA curbcuts, staff believes areas which may experience higher pedestrian volumes would be appropriate. Further, use of CDBG funds are always somewhat difficult due to restrictions on the use and regulations governing the process. This is one way to expend funds that benefit the entire community and is consistent with the sustainability goals of the Council. To accommodate the spend down requirements for CDBG funds, staff is moving this item forward to significantly decrease the funds allocated to Rosemount. These funds are residual amounts from 2011, 2013, and 2014. The 2015 allocation is earmarked for the Central Park shelter. To aid in the countywide spend down ratio, staff is recommending the Council approve the resolution awarding the contract for the base bid and all alternates, totaling $78,071. Work would commence as soon as possible to get work completed this fall, prior to snowfall. RECOMMENDATION Motion to approve the attached resolution. CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2015 – A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT TO UPGRADE THE SIDEWALKS TO ADA STANDARDS ON CONNEMARA TRAIL AND BISCAYNE BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1. All bids to upgrade sidewalks on Connemara Trail and Biscayne Avenue to meet ADA Standards are hereby received and tabulated. 2. The bid of Ryan Contracting in the amount of $78,071.00 for the construction of said improvements is in accordance with the plans and specifications and advertisement for bids, and is the lowest responsible bid and shall be and hereby is accepted. Funding will come from CDBG Funds. 3. The Mayor and City Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of the successful bidder and the next two lowest bidders shall be retained until a contract has been executed. ADOPTED this 6th day of October, 2015. William H. Droste, Mayor ATTEST: Clarissa Hadler, City Clerk engineering planning environmental construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 Equal Opportunity Employer wsbeng.com \\gvnas01\projects\01928-900\Admin\Construction Admin\1928-90 LTR REC-hmcc-092815.doc September 28, 2015 Honorable Mayor and City Council City of Rosemount 2875 145th Street West Rosemount, MN 55068 Re: 2015 Pedestrian Improvement Project City of Rosemount Project No. ENG 182 WSB Project No. 1928-90 Dear Mayor and Council Members: Quotes were received for the above-referenced project on Friday, September 25, 2015. Three quotes were received. The quotes were checked for mathematical accuracy and tabulated. Please find enclosed the bid tabulation indicating the low bid as submitted by Ryan Contracting Co., Elko New Market, Minnesota in the following amounts: Ryan Contracting Engineer’s Estimate A. Connemara Trail - Base Bid $38,653.00 $37,261.00 B. Biscayne Avenue - Alternates  Birch Street $ 6,343.00 $ 5,631.00  Belfast Street $ 6,643.00 $ 5,631.00  Bloomfield Path $13,336.00 $11,262.00  Bittersweet Way $ 6,368.00 $ 5,356.00  151st Street $ 6,728.00 $ 5,356.00 TOTAL for Base Bid (A) + All Alternates $78,071.00 $70,497.00 We recommend that the City Council consider these quotes and award a contract for the Base Bid plus Alternates B-F in the amount of $78,071.00 to Ryan Contracting Co. based on the results of the quotes received. Sincerely, WSB & Associates, Inc. Phil Olson, PE Project Manager Enclosures kkp