Loading...
HomeMy WebLinkAbout8.a. Project Update City Projects Update Council City Council public Receives Award Assessment Contract Payments % Project Project Name Authorizes Hearing Plans/Specs Open Bids Contract Start Date Hearing Contractor Amount To Date Complete Summary Number Plans/Specs Authorize Ad For Bid Drilling of the production well began in May. The well design was revised from a double cased well to a triple cased well once the well E.H. Renner & hit refusal at 141 -feet below ground surface. Drilling continued for the two inner casings and all casings were grouted in place and 416 Well 16 10/01/13 N/A 11/18/14 02/27/15 03/17/15 05/26/15 N/A $430,960 $123,414 29% approved by the MDH on September 15th. Well development is now underway. Blasting occurred on September 28th followed by Sons, Inc. sandstone removal. The second round of blasting took place on October 14th. Development activities will continue for another couple of weeks to be followed by test pumpina. Proiect completion is expected in Januarv. 2016. 145th Street Easement agreement with Canadian Pacific is current) beingreviewed b the Cit Attorney (agreement is already in lace with Union Pedestrian UPRR, CPRR, g y y y ( g y p 447 Improvements at 01/02/13 N/A N/A TBD Pacific). Railroad work will begin after agreement is executed. Sidewalk work will begin after railroad work. Sidewalk has already been RR Crossing installed on the southwest corner adjacent to the Park & Ride. Danbury Way November December February June Council ordered the project and authorized the Plans & Specs on July 21 , 2015. The project is currently in designing phase. Award of 453 Reconstruction 07/21/15 07/21/15 2015. 2015. 2016. 2016. the contract is anticipated for February 2016. Rain garden and water quality discussion will be at the October 20, 2015 City Council work session. Friedges PRIVATE This development includes 14 single-family homes by developer Friedges Excavating, Inc. Friedges is administering the contract 459 Wilde Lake Estates N/A N/A PRIVATE 04/27/15 N/A Contracting privately. This project is substantially complete. Nodland This development includes 47 single-family homes by developer Ryland Homes. Ryland Homes is administering the contract privately. 462 Greystone 4th N/A N/A PRIVATE 04/13/15 N/A Construction PRIVATE Base course paving, sidewalk, trail and utilities are installed. Wear course paving and the temporary cul-de-sac will be constructed this fall to allow turn-around access for buses and plows this winter. Prestwick Place Nodland PRIVATE This development includes 34 single-family homes by developer U.S. Home Corporation (Lennar). Lennar is administering the contract 463 11th N/A N/A PRIVATE 05/18/15 N/A Construction privately. This project is substantially complete. 464 Bella Vista 3rd N/A N/A PRIVATE 08/03/15 N/A SR Weidema PRIVATE This development includes 28 single-family homes by developer U.S. Home Corporation (Lennar). Lennar is administering the contract privately. Base course paving is complete. Sidewalks and wear course paving will be complete in summer 2016. 465 132nd Street West N/A Council received the feasibility report and assessment agreement on October 6, 2015. This project is on hold until the status of the Improvements Dunmore project is determined. 466 Horseshoe Lake 05/05/15 N/A 08/18/15 09/04/15 09/15/15 10/19/15 N/A Ryan $644,000 Construction is expected to begin next week and the underground utilities are expected to be completed by November 30, 2015. Lift Station Contracting Electrical work, site work, and restoration will be completed by summer 2016. 467 Dunmore 1st N/A This development includes 30 single-family homes b developer Copper Creek. This project is on hold by the developer. 468 Prestwick Place N/A N/A PRIVATE TBD N/A TBD PRIVATE This development includes 31 single-family homes by developer KRB Development I, Inc. KRB is administering the contract privately. 12th Base course paving is complete. Sidewalks and wear course paving will be completed in summer 2016. 1 .5MG Ground Winter WSB & Associates, Inc. is the engineering consultant for the design and construction administration of the tank and booster station. ENG-179 N/A N/A Project is in design phase now, with a contract expected to be awarded in early January, 2016. At the October 12, 2015 Council Work Storage Tank 2016 Session, the decision was made to design the tank as a completely below ground facility. ENG-176 City Hall Generator N/A 06/16/15 07/10/15 07/21/15 07/27/15 N/A Northern Air $144,530 $307962 21 % The concrete slab has been constructed on the east side of City Hall. The generator is expected to be installed this fall. Corporation Wells 4 & 5 Keys Well Bids were opened September 29 and a contact was to be awarded October 6. The low bid contractor for the project was also the ENG-181 Sealing, New N/A 09/01/15 09/29/15 On Hold Oct 2015 N/A Drilling contractor for Well 5 in 1963. The contractor produced construction records for Well 5 that have complicated the sealing project. Observation Well (on hold) Further investigation is necessary in order to determine the construction methods for the abandonment of Well 5. WSB staff are presently discussing the Well 5 abandonment procedures with MDH and DNR officials. The award is delayed at this time. GAENGPROJ\Project Tracking\Project Update Updated: 10/15/2015