HomeMy WebLinkAbout4.b. Culvers site planEXECUTIVE SUMMARY
Port Authority Meeting Date: October 20, 2015
AGENDA SECTION:
AGENDA ITEM
: Culvers Site Plan
New Business
PREPARED BY: AGENDA NO.
Kim Lindquist, Deputy Director4.b.
ATTACHMENTS: APPROVED BY:
Submitted Plans ddj
RECOMMENDED ACTION:
Information Item
ISSUE
Attached are the Culvers plans for City Planning review. The item is scheduled for the Planning
Commission meeting on October 27, with Council review tentatively scheduled for November 17.
BACKGROUND
The plans include a site plan of the restaurant with drive-through and associated parking.
10.15.2015
I hereby certify that this plan was prepared by me or
licensed architect under the laws of the State of
under my direct supervision and that I am a duly
Date
EXTERIOR ELEVATIONS
A4.0
South Robert Trail
Rosemount, MN
Ryan SchroederRyan Schroeder
952-541-9969
Minnesota
55068
50047
15282
RAS
Proect Contact :
Phone Number :Owner Review
JP
Registration :
Print History
Signature :
Checked
Name :
Proect
Drawn
80.8%87.8%88.5%87.3%
11.9%
100%100%100%100%
7.3%7.7%4.5%7.5%7.5%5.2%
4%
----
1,607.9 s.f.
s.f.
1,508.7 s.f.1,988.4 s.f.1,117.9 s.f.1,947.7 s.f.1,034.7 s.f.
s.f. s.f.
s.f.s.f.s.f.s.f.s.f.s.f.s.f.s.f.s.f.s.f.s.f.
137.2 872.4 137.7 877.7
121.577.3 124.271.2 130.975.2 51.8
221
44
30
MATERIAL AREASMATERIAL AREASMATERIAL AREASMATERIAL AREAS
Stone/brick veneer -
Stone/brick veneer - Stone/brick veneer - Stone/brick veneer -
TotalTotalTotalTotal
Windows/Doors -Windows/Doors -
Metal/wood -
Windows -
Metal -
Metal - Metal -
EIFS - EIFS - EIFS - EIFS -
Door -
Ryan Schroeder By:DOCSBExtElev15282.dwg
G:201515282Culvers Rosemount, MN40CONSTR File: 10/15/2015 1:46 PMPlotted: