Loading...
HomeMy WebLinkAbout4.b. Culvers site planEXECUTIVE SUMMARY Port Authority Meeting Date: October 20, 2015 AGENDA SECTION: AGENDA ITEM : Culvers Site Plan New Business PREPARED BY: AGENDA NO. Kim Lindquist, Deputy Director4.b. ATTACHMENTS: APPROVED BY: Submitted Plans ddj RECOMMENDED ACTION: Information Item ISSUE Attached are the Culvers plans for City Planning review. The item is scheduled for the Planning Commission meeting on October 27, with Council review tentatively scheduled for November 17. BACKGROUND The plans include a site plan of the restaurant with drive-through and associated parking. 10.15.2015 I hereby certify that this plan was prepared by me or licensed architect under the laws of the State of under my direct supervision and that I am a duly Date EXTERIOR ELEVATIONS A4.0 South Robert Trail Rosemount, MN Ryan SchroederRyan Schroeder 952-541-9969 Minnesota 55068 50047 15282 RAS Proect Contact : Phone Number :Owner Review JP Registration : Print History Signature : Checked Name : Proect Drawn 80.8%87.8%88.5%87.3% 11.9% 100%100%100%100% 7.3%7.7%4.5%7.5%7.5%5.2% 4% ---- 1,607.9 s.f. s.f. 1,508.7 s.f.1,988.4 s.f.1,117.9 s.f.1,947.7 s.f.1,034.7 s.f. s.f. s.f. s.f.s.f.s.f.s.f.s.f.s.f.s.f.s.f.s.f.s.f.s.f. 137.2 872.4 137.7 877.7 121.577.3 124.271.2 130.975.2 51.8 221 44 30 MATERIAL AREASMATERIAL AREASMATERIAL AREASMATERIAL AREAS Stone/brick veneer - Stone/brick veneer - Stone/brick veneer - Stone/brick veneer - TotalTotalTotalTotal Windows/Doors -Windows/Doors - Metal/wood - Windows - Metal - Metal - Metal - EIFS - EIFS - EIFS - EIFS - Door - Ryan Schroeder By:DOCSBExtElev15282.dwg G:201515282Culvers Rosemount, MN40CONSTR File: 10/15/2015 1:46 PMPlotted: