HomeMy WebLinkAbout6.l. 2016-2020 Dakota County Capital Improvement ProgramI:\City Clerk\Agenda Items\Approved Items\6.l. 2016-2020 Dakota County Capital Improvement Program.docx
EXECUTIVE SUMMARY
City Council Meeting: October 20, 2015
AGENDA ITEM: 2016-2020 Dakota County Capital
Improvement Program
AGENDA SECTION:
Consent
PREPARED BY: Patrick Wrase, PE, Public Works Director
/ City Engineer AGENDA NO. 6.l.
ATTACHMENTS: Resolution; June 9, 2015 Letter to
County; Draft Transportation
Request/Response; Draft Dakota County
2016-2020 CIP; September 24, 2015
Letter from Dakota County
APPROVED BY: ddj
RECOMMENDED ACTION: Motion to Adopt a Resolution Supporting the Dakota County
2016-2020 Transportation Capital Improvement Program
ISSUE:
Dakota County has prepared a draft 2016-2020 Transportation Capital Improvement Program (C.I.P), a
copy of which is attached. Highlighted in the draft CIP are the Dakota County projects programmed
within the City of Rosemount. As in the past, Dakota County is requesting a City resolution of support
for the projects identified in the draft CIP.
BACKGROUND:
On June 9, 2015 a letter was sent on the proposed City projects to be included in the 2016-2020 Dakota
County CIP. At that time, the following projects were identified:
• CSAH 42/TH 52 Interchange Project - continue to support the advancement of this
project as funding sources become available.
• County Road 73 (Akron Avenue) Bonaire Path to Inver Grove Heights – continue to
program the improvement of County Road 73 from Bonaire Path to Inver Grove Heights
with the schedule dependent upon the completion of the Pine Bend Area Arterial
Connector Study and future development.
• CSAH 42/Business Parkway/Biscayne Avenue/149th Street Improvements – the
completed 149th Street will serve as a frontage road connection between Business Parkway
and Biscayne Avenue to facilitate the direction of local future commercial traffic to the
intersection of Biscayne Avenue and CSAH 42, identified to be signalized in the future.
The city requests that a Joint Powers Agreement be developed between Dakota County
and the City for the following:
o Reduction of CSAH 42/Business Parkway access from full to three-quarters;
o Combined with the installation of a signal system on CSAH 42 at Biscayne Avenue;
I:\City Clerk\Agenda Items\Approved Items\6.l. 2016-2020 Dakota County Capital Improvement Program.docx
2
o And, combined with the determination of County funding
participation/reimbursement for a percentage of the City’s cost to construct 149th
Street.
• CSAH 38 / CSAH 31 to TH3 – continue to support the programming of improvements
to CSAH 38 (McAndrews Road) between CSAH 31 (Pilot Knob) and TH 3 to convert the
road from a 2-lane to 3-lane road section with a center left turn lane.
SUMMARY:
Attached for Council consideration is a resolution supporting the Dakota County Draft 2016-2020
Transportation Capital Improvement Program.
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2015 -
A RESOLUTION SUPPORTING THE
DAKOTA COUNTY 2016-2020 TRANSPORTATION CAPITAL IMPROVEMENT PROGRAM
WHEREAS, Dakota County has asked cities and townships for input on the Dakota County 2016-2020
Transportation CIP; and
WHEREAS, the following transportation projects and policies are important to the City of Rosemount:
CSAH 42/TH 52 Interchange Project - continue to support the advancement of this
project as funding sources become available.
County Road 73 (Akron Avenue) Bonaire Path to Inver Grove Heights – continue to
program the improvement of County Road 73 from Bonaire Path to Inver Grove Heights
with the schedule dependent upon the completion of the Pine Bend Area Arterial Connector
Study.
CSAH 42/Business Parkway/Biscayne Avenue/149th Street Improvements – the
completed 149th Street will serve as a frontage road connection between Business Parkway
and Biscayne Avenue to facilitate the direction of local future commercial traffic to the
intersection of Biscayne Avenue and CSAH 42, identified to be signalized in the future. The
city requests that a Joint Powers Agreement be developed between Dakota County and the
City for the following:
o Reduction of CSAH 42/Business Parkway access from full to three-quarters;
o Combined with the installation of a signal system on CSAH 42 at Biscayne Avenue;
o And, combined with the determination of County funding
participation/reimbursement for a percentage of the City’s cost to construct 149th
Street.
CSAH 38 0 CSAH 31 to TH3 – continue to support the programming of improvements to
CSAH 38 (McAndrews Road) between CSAH 31 (Pilot Knob) and TH 3 to convert the road
from a 2-lane to 3-lane road section with a center left turn lane.
WHEREAS, the City of Rosemount intends to participate in costs associated with these projects in
accordance with the applicable county cost sharing policies.
NOW THEREFORE BE IT RESOLVED, the City of Rosemount hereby supports the above-mentioned
projects for inclusion in the Dakota County 2016-2020 Transportation CIP.
ADOPTED this 20th day of October, 2015.
William H. Droste, Mayor
ATTEST:
Clarissa Hadler, City Clerk