Loading...
HomeMy WebLinkAbout6.n. Approve Change Order No. 1 – Horseshoe Lake Stormwater Lift StationI:\City Clerk\Agenda Items\Approved Items\6.n. Approve Change Order No. 1 – Horseshoe Lake Stormwater Lift Station.docx EXECUTIVE SUMMARY City Council Regular Meeting: November 17, 2015 AGENDA ITEM: Approve Change Order No. 1 – Horseshoe Lake Stormwater Lift Station, City Project 466 AGENDA SECTION: Consent PREPARED BY: Mitch Hatcher, Project Engineer AGENDA NO. 6.n. ATTACHMENTS: Change Order 1 APPROVED BY: ddj RECOMMENDED ACTION: Motion to approve Change Order No. 1 for Horseshoe Lake Stormwater Lift Station, City Project 466 BACKGROUND Due to the existing conditions of the forcemain, a construction change was made to add a 16-inch 22.5° bend to match the required elevations of the stormwater lift station. A copy of Change Order No. 1 is attached. These contract changes result in a net increase of $1,933.00 to the current contract amount of $644,000.00 for a new total of $645,933.00. All costs associated with Change Order No. 1 will be funded by the Storm Core and Stormwater Utility Funds. SUMMARY Staff recommends Council approval of Change Order No. 1 for the Horseshoe Lake Stormwater Lift Station, City Project 466.