EXECUTIVE SUMMARY
City Council Regular Meeting: November 17, 2015
AGENDA ITEM: Approve Change Order No. 1 – Horseshoe
Lake Stormwater Lift Station, City Project
466
AGENDA SECTION:
Consent
PREPARED BY: Mitch Hatcher, Project Engineer AGENDA NO. 6.n.
ATTACHMENTS: Change Order 1 APPROVED BY: ddj
RECOMMENDED ACTION: Motion to approve Change Order No. 1 for Horseshoe Lake
Stormwater Lift Station, City Project 466
BACKGROUND
Due to the existing conditions of the forcemain, a construction change was made to add a 16-inch 22.5°
bend to match the required elevations of the stormwater lift station. A copy of Change Order No. 1 is
attached.
These contract changes result in a net increase of $1,933.00 to the current contract amount of $644,000.00
for a new total of $645,933.00. All costs associated with Change Order No. 1 will be funded by the Storm
Core and Stormwater Utility Funds.
SUMMARY
Staff recommends Council approval of Change Order No. 1 for the Horseshoe Lake Stormwater Lift
Station, City Project 466.