Loading...
HomeMy WebLinkAbout6.g. Payment 12 & Final – Bacardi Avenue ImprovementsI:\City Clerk\Agenda Items\Approved Items\6.g. 20151201 CC Payment 12 & Final Bacardi.docx EXECUTIVE SUMMARY City Council Meeting: December 1, 2015 AGENDA ITEM: Payment 12 & Final – Bacardi Avenue Improvements, City Project 452 AGENDA SECTION: Consent PREPARED BY: Patrick Wrase, PE, Public Works Director / City Engineer AGENDA NO. 6.g. ATTACHMENTS: Payment Voucher, Map APPROVED BY: ddj RECOMMENDED ACTION: Motion to Approve Payment 12 and Final to Ryan Contracting for Bacardi Avenue Improvements, City Project 452 and Accepting it for Perpetual Maintenance BACKGROUND: This item is on the agenda to request Payment 12 and Final to Ryan Contracting for Bacardi Avenue Street and Utility Improvements, City Project 452. The final construction amount of $3,020,170.70 is 13.47% greater than the original contract amount of $2,661,604.50. SUMMARY: Staff recommends that Council approve Payment 12 and Final for the Bacardi Avenue Improvements project and accept the project for perpetual maintenance subject to the following conditions. 1. Satisfactorily showing that the contractor has complied with the provisions of Minnesota Statutes 290.92 requiring withholding state income tax. 2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the contract have been fully paid or satisfactorily secured. 3. Consent of Surety to Final Payment certification from the contractor’s surety. 4. Two-year Maintenance Bond. ?§A@ S R O B E R T T R B I S C A Y N E A V E S R O B E R T T R L (S T H 3 ) B A C A R D I A V E BONAIRE PATH W CONN T R L B I S C A Y N E A V E CONNEMARA TRL E M A R A B E N G A L A V E W 130T H W A Y A Z A L E A A V E 125TH ST W 138TH A U T U M N C T B A N Y A N 132ND CT W A U T U M NWOOD A U G U S TA WAY 130TH ST W A U B U R N A V E 1 3 6 T H S T W 1 2 6 T H S T W B R ASS PKWY BONAIRE PATH W B I R C H W O O D A V E B E L M O N T T R L B E L F A S T S T W 128TH B O L I V I A A V E W 138TH ST W BIRCH B U N R A T T Y A V E B R I L L I A N T U. 138TH ST W B R I A N B O R U A V E A U T U M N W O O DC T A V E ATRIU M AVE B L A N C A A V E W 1 3 9 T H S T W L. 138TH ST W AVE B E L F A S T 124THST W BELMONT AUT U M N W O O D S T W ST W A T W O O D C I R BIRDSONG PATH TRL BLOOMF I E L D B U N D O R A N A V EBURGUNDY A V E A P P A L A C H I A N T R L BIRDSONG CT B R O U G H S H A N E A V E A U T U M N W O O D W A Y A T W O O D A V E C T A UDOBA N W A Y TRL B L A N C A A V E W B L A N C A A V E W A U T U M N 1 2 8 T H T R L A T W O O D C T B I R M I N G H A M C T BELVIDERE CT 142NDST W 132ND ST W B E L L EC T 1 4 2 N D C T W B R E M E N A V E 1 3 5 T H S T W 1 3 3 R D S T B R I C K P A T H B R A S S P K W Y G E M A V E B L A N C A C T BLARNEYCT P A T H B R O N Z ECT ATWOOD A T W A T E R P A T H ATWOODAVE AVE ATRIUM ATHENA CT A T W A T E R C T ATHENA B L A N C A WAY B L O O M F I ELD PATH CT B I R N A M W O O D B I R C H W O O D A V E139TH ST W CT A V A L O N PATH L N ST W BELMONT TR 1 4 0 T H ST W A U B U R N A V E 140TH ST W A V E B R O C K B R I C K P A T H 140TH CIR B U R G U N D Y C T BURGUNDY WAY ST W CARBURY WA Y 136TH ST W 140TH ST W W A Y A V E 1 3 5 T H S T W 133RD ST BRONZE PKWY B U T T E R F L Y P A T H 1 3 4 T H S T B R O N Z E P K W Y AVANTI ABBEYFIELD CT AIL E S B U R Y A V E A I L E S B U R Y C TERICKSON PO N D MARE POND KEEGANLAKE MAREPOND KEEGANLAKE MCMENOMYPOND M e a d o w s P a r k BirchPark B l o o m f i e l d P a r k EricksonPark BrockwayPark BrockwayPark T:/GIS/City/Maps/Departmental Maps/Engineering/Chris/Location map - 452 Bacardi Avenue Improvements June 2013­0 1,100 2,200 3,300 4,400550Feet City Project 452