Loading...
HomeMy WebLinkAbout6.b. 1.5MG Ground Storage Tank and Booster EXECUTIVE SUMMARY Utility Commission Meeting: December 14, 2015 AGENDA SECTION: AGENDA ITEM: 1.5 MG Ground Storage Tank Plan Review New Business PREPARED BY: AGENDA NO. Patrick Wrase, PE, Director of Public Works / City Engineer6.b. ATTACHMENTS: APPROVED BY: Preliminary Water Treatment Plant Site Plan RECOMMENDED ACTION: Discussion BACKGROUND On September 1, 2015 the City Council approved the proposal from WSB & Associates, Inc. to provide design, construction management and startup services for a 1.5 MG Ground Storage Tank and Booster Station, to be located on the City property between Fire Station 2 and the Bacardi Water Tower. A copy of the plans, which are 90% complete, is attached for Utility Commission review. The construction of the 1.5MG reservoir is expected to be completed in 2016 to coordinate with the completion of Well 16. The construction of this facility is intended to accommodate future growth and help mitigate potential issues with increased radium levels at Well 16. The most recent cost estimate for the project is $4,138,000 including contingencies and engineering costs. SUMMARY Staff is inviting Utility Commission input regarding the plans. The full plan set will be available for review at the meeting. Comments will be passed on to WSB & Associates, Inc. to be incorporated into the final plans. C:\\Users\\klk\\AppData\\Local\\Temp\\20151214 UC 1.5MG GST Plan Review_338195\\20151214 UC 1.5MG GST Plan Review.docx