Loading...
HomeMy WebLinkAbout6.s. Amendment of Scope of Services for Safe Routes to School Shannon Parkway and 144th StreetG:\ENGPROJ\ENG 0180 - SRTS Shannon Parkway and 144th Street\Council Information\20151020 CC Authorize Scope of Services SRTS.docx EXECUTIVE SUMMARY City Council Meeting: December 15, 2015 AGENDA ITEM: Amendment of Scope of Services for Safe Routes to School (SRTS) Shannon Parkway and 144th Street, ENG-0180 AGENDA SECTION: Consent PREPARED BY: Patrick Wrase, PE, Director of Public Works / City Engineer AGENDA NO. 6.s. ATTACHMENTS: Project Area Maps, Email from WSB and Associates, Inc APPROVED BY: RECOMMENDED ACTION: Motion to Authorize the Amendment to the WSB and Associates, Inc. Proposal for Professional Services for Safe Routes to School (SRTS) Improvements at Shannon Park Elementary and 144th Street West, ENG-081 ISSUE Staff is requesting City Council authorization to amend the contract with WSB and Associates, Inc. for professional services for Safe Routes to School (SRTS) Improvements at Shannon Park Elementary and 144th Street West, adding $26,750 for additional easement acquisition work. BACKGROUND At the October 20, 2015 City council Meeting, the Council approved of a professional services contract with WSB and Associates, Inc. (WSB) to provide design and construction management and Federal Aid project management services for the Safe Routes to School (SRTS) improvements at Shannon Park Elementary and 144th Street West. The contract in the amount of $138,434 is a “not to exceed” amount for all professional services necessary to deliver the project through completion. With the detailed design for the project now completed, it has been determined that additional easements are necessary for the project beyond those anticipated with the original WSB proposal. WSB had originally anticipated that easements would need to be obtained from five (5) individual properties in order to construct the project; one at Shannon Park Elementary, one at Rosemount Elementary School and 3 for the single-family residential properties immediately east of Rosemount Elementary School. The detailed design work has made it clear that additional temporary construction easements are necessary from ten (10) additional properties: eight (8) for the reconstruction of driveways on the homes on 144th Street West between Chili and Cantata; one (1) for St. John’s Lutheran Church in order to properly align the sidewalks at the Canada Avenue crossing; and one (1) additional easement at Shannon Park Elementary, as this property contains two parcels. The obtaining of formal legal easements is a strict requirement for any project utilizing Federal funding as is the case on this project. While it is unfortunate that the additional easements were not identified during WSB’s initial project scoping, it is not uncommon for such occurrences once more-detailed designs have been developed. The original WSB cost estimate for the added easement work was $33,650. WSB has offered to provide the additional easement work at a reduced cost of $26,750 bringing the total cost for the easement work from $27,700 to $54,450. On a per-easement basis, the original 5 easements would 2 have cost $5,540 per-parcel, while the per-parcel cost for the total of 15 easements is $3,630 each. As a comparison, the costs for the easements on the eight parcels associated with the recently-completed Bacardi Avenue project were $6,375 each. The project cost will be split 80% / 20% between Federal and City funding. The City portion of the additional easement costs will be $5,350. The estimated total cost of the project, including the additional easements, is $533,748 with the City’s portion being $106,750. SUMMARY Staff is requesting City Council authorization to amend the contract with WSB and Associates, Inc. for professional services for Safe Routes to School (SRTS) Improvements at Shannon Park Elementary and 144th Street West, adding $26,750 for additional easement acquisition work. S51'4' h<5> X SHANNONPARK ELEMENTARY 4Q\ srr PARCEL 1: PE = 69 SQ FT A TE = 257 SQ FT 25 5° 0 Qe w, 4 , p V d c ' - a.- k i_— S fk PARCEL 2: W PE = 4,716 SQ FT TE = 10,696 SQ FT a.m.: , . .a,. , t;. g ry L g o- V . 2 y w 2 \` LEGEND w.r r . _ n PERMANENT EASEMENT TEMPORARY EASEMENT PRELIMINARY RW LAYOUT NOVEMBER 19, 2015 SHANNON PARK ELEMENTARY - FIGURE 8e SAFE ROUTES TO SCHOOL ROS MOL_.1 Rosemount, MN MINNESOTA N 1` Q` L. Z Z r Q W W N Q Q W W W ZZ J W Q o U IZ p O il W dH a F J s,; WClO F a n s QW a. t w a a 1 fA N JU p W v II z oz r I i : w. JU I jr a ^ Q ' 1I F k d — X,,,. . F— 4. ` a, MJ t Ud F— s s . d r w p O I 1 Q J ' O i r I Z W w,. W F— _ R,,. ar• a O Z 3 4 0 x nN ndi iH J = w m w Qo a o w., a M : w w f" Q Q W Q N w w Z r Z k w ¢ Z ¢ O O a w w w A. J a ~ i w i «. n v i tc. O I 7r s r O x . nN nd eidiN w w fr woz v a r T i • „ t' * oa 4 i 7'+"—; w v U W Q,.' Q W m • , m- T f H J W O o w`- r ".. v a ii t. . Q O q ` Z w Q z c I— p c o 9 l 89 2 d M ri = w r f° w v c n E, Q z z F r°*" O w w N 0 W h.,.: aW } Z TI1VnI Z Z y. U W Q o ` I Z Q a.. w d w w i J a ~ wV /0w E UN nnQww i - s , m r f l Z 2V y A I Ii I I 1 nN nd dadNd J w o0 a , , Q I— F— J fA 1 O LL LL A c C J cfl p W W U i Q c Z O 2 w w a. (( 0 x d w w a; O W W Q n s Y m" Q Q W R. W w Z Z Z Z o Z Q O M w a p i J w ya 4,. w N Y. Q; O ti rr s aa z r Is nn nN nd o wd S oNpj a, r e wm M; 1" s H . O lL L , r a"' r""'" it J 00N 3 U r C £§ , s - r h v 4, , i f— I r „ q r,-+ 1t i : t I J u. r: r–II II J Q L1J W _ ai, aa . ti,. w f I fr Q U I-' ` J O n Cn Z J r-- r- W Q m ' n n " z - O I w d H J = W N r - W v e Q..' Q O t From: Andy Brotzler To: Wrase. Patrick Cc: Nicholas Hentaes; Ben Barker; Mitch Hatcher Subject: Updated ROW Fee for SRTS Project Date: Monday,November 30,2015 11:17:57 AM Attachments: imageb33630.JPG Pat— As discussed last week, we are providing an updated scope and fee for the additional parcels which temporary construction easements will be required from for the project. As you know our original fee was based on acquiring permanent easements from S parcels. With the development of preliminary plans and additional detail for the project, it was identified that temporary easements will be required from 10 parcels, specifically at driveways to accommodate matching existing driveway grades. Below is a summary of our original scope and fee along with the proposed updated scope and fee: Original Scope and Fee Easement acquisition for 5 parcels WSB Fee - $19,000 Sub-consultant Fees - $8,700 Total Fee - $27,700 Average Per Parcel Fee - $5,540/parcel Updated Scope and Fee Easement acquisition for 15 parcels WSB Fee - $39,250 Sub-consultant Fees - $ $15,200 Total Updated Fee - $54,450 Average Per Parcel Fee - $3,630/parcel Notes: 1. The revised estimate assumes 17 parcels for title commitments and 15 parcels for acquisition work. Three parcels are owned by ISD 196 and it is assumed ISD 196 will be donating the easements needed for the project. 2. Appraisals and appraisal review work is based on 4 parcels with the assumption that the ISD 196 parcels will be donated. 3. Sub-consultant services for title commitments, appraisals, and appraisal review work will be coordinated by WSB. Invoices for sub-consultants will be submitted to WSB and included with WSB's invoices to the City. 4. Acquisition services are proposed through title and possession date. Any services required beyond that date will be billed at WSB's standard hourly rates. 5. Minimum damage acquisition (MDA) reports will be prepared for temporary construction easements. Please let us know if the above updated scope and fee is acceptable and we will proceed with activities immediately. Thanks, Andy Andy Brotzler, PE Municipal Senior Project Manager, Principai d 763-287-7191 c 612-360-1291 WSB&Associates, Inc. 701 Xenia Avenue South. Suite 300 Minneapolis, MN 55416 L This email.and any files transmifted with it is confidenEial and is inteaded so/ery for the use of!he addressea(f you are not the addrsssee.please delete rh,is 2mail from your system Any use o1 t!?is emad by unin[2nded recipients rs stnctly prohibited. WSB deas nof acc2pt liabiliry for any?rrors or om ssions vvhich anse as a result of elec!ronic transmission If venfrcation is required p/ease request a hard copy