Loading...
HomeMy WebLinkAbout2.a. TH 52-CSAH 42 InterchangeI:\City Clerk\Agenda Items\Approved Items\2.a. TH 52-CSAH 42 Interchange.docx EXECUTIVE SUMMARY City Council Work Session: February 8, 2016 AGENDA ITEM: Update - TH 52/CSAH 42 Interchange, City Project 461 AGENDA SECTION: Discussion PREPARED BY: Patrick Wrase, PE, Director of Public Works/City Engineer AGENDA NO. 2.a. ATTACHMENTS: Project Area Map APPROVED BY: ddj RECOMMENDED ACTION: Discussion regarding the Dakota County project to reconstruct the interchange at TH 52 and CSAH 42 BACKGROUND In April of 2015, the City of Rosemount entered into a Joint Powers Agreement with Dakota County for the reconstruction of the interchange at TH 52 and CSAH 42, including the expansion of CSAH 42 to a 4- lane highway, replacement of two bridges on TH 52, and the reconstruction of the ramps. Rosemount will be a cost sharing participant in the project according to the established Dakota County cost sharing arrangement. Rosemount contributions to the project have been included in the City of Rosemount’s 10- year Capital Improvement Program. The project has been awarded $10,205,000 in Federal Funding and recently awarded a MnDOT Transportation and Economic Development (TED) Grant in the amount of $3,100,000. Rosemount and County staff have agreed that the TED funds will be utilized to extend the project east to the location of a proposed company intending to locate east of the TH52/CSAH42 interchange. This is approximately one-half of a mile east of the originally intended terminus of the project. It is estimated that this extension will require approximately $1.1 million in additional funding bringing the total project cost to approximately $19.1 million. Allocation of the $1.1 million to the County Road 42 extension leaves approximately $2 million in TED Grant funds that will be utilized to reduce the City and County contributions to the project. Assuming an equal distribution of the grant funds to each party, Dakota County will fund $3.275 million and Rosemount $2.5 million of the 42/52 project costs. Design of the 42/52 project has been ongoing for the last several months. A topic of discussion recently has been the method of traffic routing during the construction of the project. Routing Option 1 would keep two-way traffic on both 42 and 52 during construction, using cross overs and lane reductions on TH52 and a single lane in each direction on CSAH42. This option would take more time for total construction and would require two construction seasons to complete the project. One bridge would be built the first construction season, a return to full operations during the winter months and then similar lane reductions the following construction season while the second bridge is rebuilt.. Option 2 would allow both bridges to be constructed in one season by routing the TH52 traffic along the entrance/exit ramps and completely closing off CSAH42 within the TH52 corridor. The CSAH42 traffic would be required to detour to TH52 in order to circumvent the construction area. This may require detouring as far south as CSAH46 for eastbound 42 traffic and as far north as 117th Street for westbound 42 traffic. 2 Dakota County’s engineering consultant has examined the cost of the two routing options. They have determined that Option 2 would result in a savings of approximately $800,000 as compared to the two season Option 1 project. Additionally, the staging options have been presented to the residents and businesses adjacent to the project area at a meeting held on December 15, 2015. The consensus was that the project area residents supported Option 2, allowing the project to be completed in one season and thereby reducing the time of impact. With the significant cost savings of the single season staging option and the level of approval gained at the December 15 meeting, Dakota County is planning to continue the development of the project plans to incorporate the design features necessary for the single season Option 2 staging method. Prior to the ordering of the project by Dakota County, the County will seek municipal consent of the project and the design features. Dakota County staff is tentatively planning to have the Rosemount City Council consider a resolution of municipal consent for a March regular meeting of the Council. SUMMARY The TH52 and CSAH 42 project has received Grant Funding that will enable the project to be extended east to the access point of a planned industrial development and will reduce the expenditures of other City and County funds. The staging plan for the project will include a full closure of CSAH 42 at the interchange in order to allow for the project to be constructed in a single construction season. Dakota County will be requesting a resolution of municipal consent at a March meeting of the Rosemount City Council in order to proceed with final design and bidding of the project. A representative from Dakota County will be in attendance at the Work Session to offer more information and answer questions about the project. X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X C X C X C X C X C X C X C X C X C X C X C X C X C X C X C X C X C X C X C X C X C X C X C X C X C X C X C X C X C X C X C X C X C X X X X X X X X X X X X X X C X C X C X C X C X C X C X C X C X C X C X C X C X C X C X C X C X C X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X C X C X C X C X C X C X C X C X C X C X C X C X C XC XC XC XC XC X C X C XC X X X X X X X X X X X X X X C X C X C X X X X X X X X X X X X X X X X X X X X X X X X X X X C X C X C X C X C X C X C X C X X XC XC XC XC XC X X X X X X X X X X X X X A R E A U N D E R C O N S T R U C T I O N A R E A U N D E R C O N S T R U C T I O N X C X X X X X X X X X X X X X X X X X X C X C X C X C X C X C X C X C X C X C X C X C X C X C X C X C X C XC XC X C X C X C X C X C X C X C SSS S S ? ? ? ? ? ? ? ? ? ? S T O C K P I L E ? ? ? MB MB MB MB MB DI DI DI DI DI DI DI DI DIDI DI DI DI DI DI DI T T M M M M M M M M M M M W B - 6 7 A A S H T O 20 1 1 ( U S) WB-67 AASHTO 2011 (US) WB-67 AASHTO 2011 (US) W B -6 7 A A S H T O 2 0 1 1 (U S ) W B - 6 7 A A S H T O 20 1 1 (U S ) WB-67 AASHTO 2011 (US) (c) 2015 Transoft Solutions, Inc. All rights reserved. W B - 6 7 A A S H T O 2 0 1 1 ( U S ) (c) 2015 Transoft Solutions, Inc. All rights reserved. 7 0 7 5 5 3 5 5 2 0 5 2 5 5 3 0 5 4 0 5 4 5 5 5 0 5 2 0 5 2 5 5 3 0 5 4 0 5 4 5 5 5 0 8 0 8 5 1 0 1 5 2 5 2 0 150 135 140 145 155 160 165 170 175 150 135 140 145 155 160 165 170 175 180 185 190 195 6 5 6 0 5 3 5 LOCATION MAP PROJECT LOCATION P r e p a r e d B y R e v i e w e d B y L e v e l 1 L A Y O U T A P P R O V A L 2 0 2 0 2 0 2 0 2 0 R e v i e w e d B y A p p r o v e d B y A p p r o v e d B y S t a t e D e s i g n E n g i n e e r S t a t e G e o m e t r i c s E n g i n e e r P r o g r a m m e d L e t t i n g D a t e R e v i e w e d B y 2 0 D A T E : L I C . N O . : E N G R . : T H E L A W S O F T H E S T A T E O F M I N N E S O T A . S U P E R V I S I O N A N D T H A T I A M A D U L Y L I C E N S E D P R O F E S S I O N A L E N G I N E E R U N D E R I H E R E B Y C E R T I F Y T H A T T H I S L A Y O U T W A S P R E P A R E D B Y M E O R U N D E R M Y D I R E C T R e v i e w e d B y 2 0 M e t r o D i s t r i c t P r e li m i n a r y D e s i g n E n g i n e e r M e t r o D i s t r i c t M a i n t e n a n c e O p e r a t i o n s E n g i n e e r M e t r o D i s t r i c t T r a f f i c E n g i n e e r M e t r o D i s t r i c t E n g i n e e r LEGEND WETLANDS (TOE OF SLOPE) PRELIMINARY CONSTRUCTION LIMITS RAISED MEDIANS & CURBS PAVED SHOULDERS BRIDGES & RETAINING WALLS PROPOSED PONDING LOCATION EXISTING RIGHT OF WAY PROPOSED RIGHT OF WAY 2000100 scale in feet C.S.A.H. 42 N W R A M P S W R A M P TURN MOVEMENTS WEST RAMPS TURN MOVEMENTS WEST RAMPS C.S.A.H. 42 N E R A M P S E R A M P WB-67 DESIGN VEHICLE WB-67 DESIGN VEHICLE WB-67 DESIGN VEHICLE C.S.A.H. 42 TURN MOVEMENTS CONLEY AVE. C O N L E Y A V E . FUTURE CONSTRUCTION "BY OTHERS" H : \ P r o j e c t s \ 8 7 4 9 \ C A D _ B I M \ L a y o u t \ 8 7 4 9 _ S t a f f A p p r o v e d _ l o a . d g n 2 / 1 / 2 0 1 6 - D A T E P L O T T E D T h e a li g n m e n t a n d g r a d e s s h o w n o n t h i s m a p a r e t e n t a t i v e a n d s u b j e c t t o c h a n g e w i t h o u t n o t i c e . S t a f f A p p r o v a l T h e t r a f f i c v o l u m e s s h o w n a r e B y T . H . V I C I N I T Y O F 5 2 1 6 1 0 0 F R O M C o p y T o : F o r : D E S I G N F I L E : D A T E : T . H . A . J . P P M S A c t i v i t y 0 1 9 - 6 4 2 - 0 5 9 X X S . P . T . H . A . J . P P M S A c t i v i t y S . P . T . H . A . J . P P M S A c t i v i t y f t . 2 0 P r e p a r e d S c a l e : H o r . 1 i n c h = D a t e : C O P Y N o . L A Y O U T N o . e s t i m a t e d f o r y e a r P r e p a r e d 2 0 8 7 0 F E E T S O U T H O F C . S . A . H . 4 2 T O 7 6 0 F E E T N O R T H O F C . S . A . H . 4 2 AGGREGATE DRIVEWAYS/FIELD ENTRANCES PAVED ROADWAYS F E B R U A R Y 1 6 2 0 3 5 A u g u s t 1 5 P H A S E I M E M O R A D U M T R A F F I C O P E R A T I O N S A N A L Y S I S R O S E M O U N T , M N 1 B P R O J E C T D E S C R I P T I O N R E C O N S T R U C T I N T E R C H A N G E LAYOUT HISTORY TEMPORARY EASEMENT 4 5 0 3 9 0 2 / 0 1 / 2 0 1 6 5 2 S . P . FOR THE TH 52 BRIDGES AND IMPROVING THE VERTICAL AND HORIZONTAL GEOMETRY OF CSAH 42. CURRENT OPERATIONAL AND SAFETY CONCERNS BY BUILDING THE NEW BRIDGE PIERS AT THE APPROPRIATE LOCATION STORM WATER PONDS. THE FIRST PHASE OF THE PROJECT WILL INCLUDE INTERCHANGE IMPROVEMENTS TO ADDRESS THE AT ALL INTERSECTIONS WITH RAMPS AND DESIGNATED LOCAL ROADS. THE PROJECT ALSO INCLUDES CONSTRUCTION OF OVER CSAH 42, AND RECONSTRUCTING THE FREEWAY ACCESS RAMPS. PROTECTED TURN LANES WILL BE INCLUDED ON CSAH 42 0.3 MILES WEST OF TH 52 TO 0.5 MILES EAST OF TH 52, RECONSTRUCTING TH 52 AND REPLACING TWO MAINLINE BRIDGES RECONSTRUCTING CSAH 42 TO A FOUR-LANE DIVIDED COMBINATION URBAN/RURAL ROADWAY SECTION FROM APPROXIMATELY INCLUDE THE STAGED RECONSTRUCTION OF THE EXISTING SERVICE INTERCHANGE (FULL DIAMOND). THIS PROJECT INCLUDES THIS PROJECT HAS BEEN BROKEN IN TO TWO PHASES OF WORK. THE FIRST AND CURRENT PHASE OF THE PROJECT WILL (CLOVERLEAF) INTERCHANGE. A FUTURE PROPOSED SECOND PHASE OF THE PROJECT WOULD UPGRADE THE SERVICE (DIAMOND) INTERCHANGE WITH A SYSTEM INTERCHANGE DESIGN HAD BOTH AN APPROVED ENVIRONMENTAL ASSESSMENT (EA) AND GEOMETRIC LAYOUT. A FOUR-LANE DIVIDED COMBINATION URBAN/RURAL ROADWAY SECTION WITH PROTECTED TURN LANES. THE CLOVERLEAF TWO TH 52 MAINLINE BRIDGES OVER CSAH 42, NEW FREEWAY ACCESS RAMPS, AND RECONSTRUCTING A PORTION OF CSAH 42 TO BY THE INTERCHANGE REVIEW COMMITTEE RECOMMENDED A CLOVERLEAF INTERCHANGE WHICH INCLUDES RECONSTRUCTING THE HIGHWAY 52/42 INTERCHANGE ENVIRONMENTAL ASSESSMENT (STUDY REPORT, FEBRUARY 2004) AND SUBSEQUENT REVIEW SAFETY, RELIABILITY, AND CONTINUITY FOR THE EAST-WEST THROUGH TRAFFIC. TO ACCOMMODATE PROJECTED TRAFFIC VOLUMES AT THE INTERCHANGE. THESE IMPROVEMENTS WILL INCREASE THE LIMITED SIGHT DISTANCE AT THE INTERSECTIONS, CREATING SAFETY AND CAPACITY CONCERNS THAT REQUIRE CORRECTION UNDERPASS AT THE INTERCHANGE IS LIMITED TO ONE LANE WITH LIMITED TURN LANE SPACE IN EACH DIRECTION AND SECTION OF TH 55 AND CSAH 42 BE UPGRADED TO A FOUR LANE CONTINUOUS EAST-WEST FACILITY. THE EXISTING 2002), IT WAS RECOMMENDED THAT THE SUB-STANDARD HIGHWAY 52/55 INTERCHANGE BE ELIMINATED AND THE COMMON PLAN (APRIL 2002), AND HIGHWAY 52/45/55 INTERCHANGE AND HIGHWAY 55 REGIONAL CORRIDOR STUDY (STUDY REPORT, MAY AS PART OF THE COUNTY HIGHWAY 42 CORRIDOR STUDY (1999), HIGHWAY 52 INTERREGIONAL CORRIDOR (IRC) MANAGEMENT LAYOUT NO. 1 LAYOUT NO. 1A TH 52 PROFILES HAVE BEEN UPDATED. INCORPORATED COMMENTS FROM MNDOT METRO LAYOUT APPROVAL COMMITTEE RECEIVED 11/17/2015. C R A I G H A S S J A N U A R Y 2 0 1 7 OF THE 2035 TRAFFIC NUMBERS. THE NW RAMP TURN LENGTHS ARE BASED ON QUEUING NEEDS 5. IS STOP CONTROL FOR THE EXIT RAMPS. PROPOSED INTERSECTION CONTROL AT THE CSAH 42 / RAMP INTERSECTIONS4. INTERSECTION LIGHTING WILL BE USED AT THE RAMP TERMINALS.3. TH 52 IS AN APPROVED HOUSE MOVING ROUTE.2. THERE ARE NO DESIGN EXCEPTIONS ON THIS PROJECT.1. GENERAL NOTES LAYOUT NO. 1B GUTTER TO THE RAMP INTERSECTION RADII. PULLING THE MEDIAN MOSES CLOSER TO TH 52 IN THE INTERCHANGE AREA, AND ADDING CURB AND WHICH INCLUDED MAINTAINING A CONSTANT MEDIAN WIDTH ON CSAH 42 IN THE INTERCHANGE AREA, INCORPORATED COMMENTS FROM MNDOT METRO LAYOUT APPROVAL COMMITTEE RECEIVED 1/12/16, A R N O L D A V E . A U S T I N C T . ST. ST.E. A K R O N A V E . B L A I N E A V E . A K R O N A N G U S B A R B A R A B A B C O C K A U D R E Y B L A I N E A V E . A V E . A V E . A V E . A V E . A V E . ST. ST. ST. E. E. E. ST.E. E H L E R' S P A T H PINE BEND TR. PI N E B E N D T R. C O U R T H O U S E B L V D. F A H E Y A V E . E . E . MINNESOTA ROSEMOUNT RESEARCH CENTER D O N N E L L Y A V E . B L A I N E C T . 52 52 55 55 42 42 71 81 ROSEMOUNT COATES EMPIRE TOWNSHIP T115N R18W 19 20 2930 1617 20 21 T115N R18WR19W 18 19 13 24 14 22 23 T115N R19W 15 2627 34 35 T115N R19W T115N R18W 30 31 25 36 R19W 35 36 12 T114N R19W T115N R19W T115N R18W T114N R18W 31 32 56 T115N R18W 2829 32 33 Pine Bend 34 35 T27N R22W 7 T115N 7 18 12 13 R19W R18W T27N R22W T115W R19W 33 34 12 T27N R22W T115N R19W 32 33 111011 1415 T115N R18W 71 A S H E R A V E . ST.E. D O Y LE P A T H ST. E.116th 120th 117th 138th ST. E. 155th 152nd 153rd 145th 140th 164th ST. E. 117th 142nd ST. E. T 2 T 142nd ST. 160th ST. E. 154th ST. W. T115N R18W T115N R19W 23 24 26 25 T115N R19W U n i o n P a c i f i c R a il r o a d U ni o n P a cifi c R ailr o a d C L A R K R D . C O N L E Y A V E . 46 46 46 C O M S T O C K A V E . E . B A R D A V E . AKRON AVE. 46 A V E . 158th ST. E. 186th ST. E. Union Pacific Railroad C L A Y T O N A V E . C L A Y T O N BONAIRE E. 2010 POP. 161 2010 POP. 2,444 2010 POP. 21,874 160th ST. E. 73 73 73 73 AVE. 141st ST. W. 141st ST. E. A D D I S O N A V E . PATH E. B L V D . CT. W. th W. Union Pacific Railroad 140th ST. E. C T . ADD I S ON ABERCORN PATH B L V D . V A L L E Y 125th ST.E. R I C H 145th ST.E. 42 ST.E. 42 160th ST.E. E M E R Y A V E . Roseport A D R I AN AV E . A D R I AN C T . DAKOTA COUNTY WB-67 AASHTO 2011 (US) W B - 6 7 A A S H T O 2 0 11 (US ) W B - 6 7 A A S H T O 20 1 1 ( U S) WB-67 AASHTO 2011 (US) WB-67 AASHTO 2011 (US) W B -67 AA S H T O 2 0 1 1 (U S ) WB-67 AASHTO 2011 (US) (c) 2015 Transoft Solutions, Inc. All rights reserved. W B - 6 7 A A S H T O 2 0 1 1 ( U S) (c) 2015 Transoft Solutions, Inc. All rights reserved. W B - 6 7 A A S H T O 2 0 1 1 ( U S ) WB-67 AASHTO 2011 (US) WB-67 AASHTO 2011 (US) W B - 6 7 A A S H T O 2 0 1 1 ( U S ) W B - 6 7 A A S H T O 2 0 1 1 ( U S ) WB-67 AASHTO 2011 (US) WB-67 AASHTO 2011 (US)(c) 2015 Transoft Solutions, Inc. All rights reserved. W B - 67 AA S H T O 20 1 1 (U S ) (c) 2015 Transoft Solutions, Inc. All rights reserved. { E.B. C.S.A.H. 42 { W.B. C.S.A.H. 42 { NW RAMP { NE RAMP { SE RAMP { N.B. T.H. 52 { SW RAMP { S.B. T.H. 52 { W.B. C.S.A.H. 42 { E.B. C.S.A.H. 42 12' 12' 12' 12' 12'X 145' LT. TURN 12' 12' 12' 12'12' 12' 10' SHLD 10' SHLD 12' 12' 12' 12' 12'X 300' RT. TURN 12' 12' 12' 12' 10' SHLD 10' SHLD 10' SHLD 1:15 1:10 1:5 12' 12' 12' 12' 14'X 400' LT. TURN 10' SHLD 10' SHLD 1:58' 14'X 400' LT. TURN 12' 12' 12' 12' 10' SHLD 10' SHLD 10' SHLD 12' 12' 12' 12' 10' SHLD 1:10 12' 12' 12' 12' 10' SHLD 12'X 300' LT. TURN 12'X 300' RT. TURN 12' 12' 12' 12' 10' SHLD 1:15 10' SHLD 12' 12' 10' SHLD 10' SHLD 10' SHLD 12' 12' L T . T U R N R T . T U R N 1 : 1 0 1 : 1 0 1 0 ' S H L D1 2 ' 1 2 ' 1 2 ' 2 1 ' 2 2 . 6 ' 20' 56' 20'R 40'R 10'R 75'R 10'R 10'R 250'R 260'R 10'R 72'R 6'R 6'R 52'R 20'R 20'R 377'R 4' SHLD EX. 10' SHLD EX. 12' THRU EX. 12' THRU EX. 12' THRU EX. 12' THRU EX. 10' SHLD 4' SHLD 4' SHLD 4' SHLD EX. 10' SHLD EX. 12' THRU EX. 12' THRU EX. 10' SHLD E X . 1 0 ' S H L D E X . 1 2 ' T H R U E X . 1 2 ' T H R U E X . 1 0 ' S H L D E X . 1 2 ' T H R U E X . 1 2 ' T H R U E X . 1 2 ' T H R U E X . 1 2 ' T H R U E X . 1 0 ' S H L D E X . 4 ' S H L D E X . 1 0 ' S H L D E X . 4 ' S H L D E X . 1 0 ' S H L D E X . 1 2 ' T H R U E X . 1 2 ' T H R U E X . 4 ' S H L D E X . 4 ' S H L D E X . 1 2 ' T H R U E X . 1 2 ' T H R U E X . 1 0 ' S H L D 1 2 ' 1 2 ' 1 0 ' S H L D 4 ' S H L D 1 0 ' S H L D 4 ' S H L D 1 2 ' 1 2 ' 1 0 ' S H L D 1 0 ' S H L D 1 2 ' 1 2 ' 1 2 ' 1 2 ' 4 ' S H L D 4 ' S H L D E X . 1 6 ' T H R U E X . 1 6 ' T H R U E X . 1 6 ' T H R U E X . 1 6 ' T H R U 1 : 1 5 1 2 'X 3 0 0 ' R T . T U R N 1 2 ' T H R U / L T . T U R N 1 6 ' 1 4 ' 6 ' 1 6' 1 : 1 5 1 2 'X 5 0 0 ' T H R U / L T . T U R N 1 2 ' R T . T U R N 8 ' 4 ' PROP. BR. NO. 19006 EX. BR. NO. 19002EX. BR. NO. 19001 PROP. BR. NO. 19005 8 ' 8 ' 4 ' 8 ' C.S.A.H. 42 N W R A M P S W R A M P C.S.A.H. 42 N E R A M P S E R A M P DAKOTA COUNTY DAKOTA COUNTY CITY OF ROSEMOUNT CITY OF ROSEMOUNT S P E E D P O S T E D E X I S T I N G S P E E D L I M I T 5 5 S P E E D P O S T E D E X I S T I N G S P E E D L I M I T 5 5 S P E E D P O S T E D E X I S T I N G S P E E D L I M I T 5 5 S P E E D P O S T E D E X I S T I N G S P E E D L I M I T 5 5 S P E E D P O S T E D E X I S T I N G S P E E D L I M I T 6 5 SPEED POSTED EXISTING SPEED LIMIT 65 S P E E D P O S T E D E X I S T I N G S P E E D L I M I T 6 5 SPEED POSTED EXISTING SPEED LIMIT 65 C.S.A.H. 42 C O N L E Y A V E . 209A/203P 10A/,1P 1 A / 5 P 1 7 A / 5 9 P 267P/119A 14P/31A PEAK HOUR TRAFFIC VOLUMES YEAR 2035 PEAK HOUR TRAFFIC VOLUMES YEAR 2035 PEAK HOUR TRAFFIC VOLUMES YEAR 2035 220A/237P 6A/25P 262P/144A 254P/562A 16 P / 6 A 1 P / 2 A 10 3 P / 9 1 A 6A/7P 305A/333P 123P/68A 497P/688A 18 A / 19 P 0 A / 0 P 2 2 2 A / 6 2 3 P BOTTOM ELEV.=850 BOTTOM ELEV.=847 ELEV.=874 BOTTOM ELEV.=873 BOTTOM 60'R 40'R 16' 24' 20' 24' 20' 9.75'R 4' SHLD 12' X 300' RT. TURN 12' SHLD1:15 4' SHLD 4' SHLD (60 MPH) e = NC 00°32'09" C (60 MPH) e = NC 00°28'07" C (60 MPH) e = NC 00°30' C (60 MPH) e = NC 00°30' C (60 MPH) e = NC 00°30' C (60 MPH) e = NC 00°30' C (60 MPH) e = NC 00°30' C (30 MPH) e = NC 2°00' C 2 9 , 0 0 0 Y E A R 2 0 1 2 A D T 7 0 M P H P R O P O S E D D E S I G N S P E E D T . H . 5 2 15,000 YEAR 2035 ADT 6,000 YEAR 2015 ADT 60 MPH PROPOSED DESIGN SPEED C.S.A.H. 42 28,000 YEAR 2035 ADT 12,100 YEAR 2015 ADT 60 MPH PROPOSED DESIGN SPEED C.S.A.H. 42 3 2 , 5 0 0 Y E A R 2 0 1 2 A D T 7 0 M P H P R O P O S E D D E S I G N S P E E D T . H . 5 2 (60 MPH) e = NC 00°30' C (AASHTO CASE B2, NO OBSTRUCTIONS, ISD = 926') SIGHT LINE FOR RIGHT TURN, SE RAMP (AASHTO CASE B1, NO OBSTRUCTIONS, ISD = 1262') SIGHT LINE FOR LEFT TURN, NW RAMP (AASHTO CASE B2, NO OBSTRUCTIONS, ISD = 1262') SIGHT LINE FOR RIGHT TURN, NW RAMP (AASHTO CASE B1, NO OBSTRUCTIONS, ISD = 1262') SIGHT LINE FOR LEFT TURN, SE RAMP { CONLEY AVE (AASHTO CASE B2, NO OBSTRUCTIONS, ISD = 926') SIGHT LINE FOR RIGHT TURN, CONLEY AVE (AASHTO CASE B1, NO OBSTRUCTIONS, ISD = 1200') SIGHT LINE FOR LEFT TURN, CONLEY AVE 75' 75' 60' 105'R 105'R ROSEMOUNT, MN 55068 3270 145TH ST E VICTOR & BERNICE WENZEL ROSEMOUNT, MN 55068 3175 145TH ST E NEW YORK COMMUNITY BANK ROSEMOUNT, MN 55068 3205 145TH ST E JASON JOHNSON ROSEMOUNT, MN 55068 3151 145TH ST E DUANE GOULSON ROSEMOUNT, MN 55068 3155 145TH ST E ROLLAND & DIANNE SACHS ROSEMOUNT, MN 55068 3110 140TH ST E FLINT HILLS RESOURCES PINE BEND LLC ROSEMOUNT, MN 55068 3275 145TH ST E PINE BEND LLC FLINT HILLS RESOURCES ROSEMOUNT, MN 55068 3337 145TH ST E KENNETH & BARBARA ANGERMAN ROSEMOUNT, MN 55068 3381 145TH ST E TERRENCE NAPPER ROSEMOUNT, MN 55068 3330 145TH ST E CAREY & LESLIE RECHTZIGEL ROSEMOUNT, MN 55068 14727 CLAYTON AVE MARLIN & JOANN RECHTZIGEL ROSEMOUNT, MN 55068 3275 145TH ST E PINE BEND LLC FLINT HILLS RESOURCES ROSEMOUNT, MN 55068 3405 145TH ST E RONALD LAUMBACH MARLIN & JOANN RECHTZIGEL CITY OF ROSEMOUNT MARLIN & JOANN RECHTZIGEL ROSEMOUNT, MN 55068 4230 145TH ST E RAYMOND OSTERTAG HANS ABRAHAMSEN ROSEMOUNT, MN 55068 4322 145TH ST E KNOLL FRANK LIVING TRUST GREAT RIVER ENERGY ROSEMOUNT, MN 55068 3000 145TH ST E 3CW LLC VIC'S CRANE AND HEAVY HAUL, INC. ROSEMOUNT, MN 55068 3615 145TH ST E CMC PROPERTIES LLC B & R CATTLE & TRUCKING ROSEMOUNT, MN 55068 14345 CONLEY AVE CMC PROPERTIES LLC WAYNE TRANSPORTS INC. ROSEMOUNT, MN 55068 3750 140TH ST E RAHN FAMILY LTD PARTNERSHIP RICH VALLEY GOLF COURSE ROSEMOUNT, MN 55068 3855 145TH ST E RAHN FAMILY LTD PARTNERSHIP RICH VALLEY GOLF COURSE 1:15 1:15 1:60 52' 179' LC R/W GRADE PROFILE 8.0'8.0' 4.0%2.0%2.0% 4.0% BERM 6.0' BERM 6.0' V A R ( 1: 4) ( O R F L A T T E R) VAR (1:4) (OR FLATTER) (MOD) D424 C&G (MOD) D424 C&G DESIGN SPEED = 50 MPH LC THRU 12.0' GRADE PROFILE THRU 12.0' 2.0%2.0% SHLD 10.0' 4.0% 1.5'4.0' SHLD 1.5' 4.0% THRU 12.0' GRADE PROFILE THRU 12.0' 2.0%2.0% SHLD 10.0' 4.0% 4.0' SHLD 1.5' 4.0% LC CLEAR ZONE 1:6 DESIGN SPEED = 70 MPH 1: 4 1:4 VAR. 75.0' S.B. T.H. 52 N.B. T.H. 52 38.0' VAR (1:3) 1 : 6 V A R ( 1: 3) 1.5' CLEAR ZONE 38.0' T.H. 52 LC N.B. T.H. 52 THRU 12.0' GRADE PROFILE THRU 12.0' 2.0%2.0% SHLD 12.0' 2.0%2.0% 6.0' SHLD T.H. 52 BRIDGES 2.0%2.0%2.0%2.0% GRADE PROFILE THRU 12.0' THRU 12.0'6.0' SHLDSHLD 12.0' LC S.B. T.H. 52 75.0' NE RAMP 8.0' 4.0%2.0%2.0% 4.0% BERM 6.0' BERM 6.0' VAR (1:4) (OR FLATTER) V A R ( 1: 4) ( O R F L A T T E R) DESIGN SPEED = 50 MPH NW RAMP (MOD) D424 C&G (MOD) D424 C&G LCR/W 4.0'12.0' GRADE PROFILE 8.0' THRU/LT TURNRT TURN 80.0'-100.0'80.0'-100.0' 8.0' 4.0%2.0%2.0% 4.0% BERM 6.0' BERM 6.0' V A R ( 1: 4) ( O R F L A T T E R) VAR (1:4) (OR FLATTER) DESIGN SPEED = 50 MPH SE RAMP (MOD) D424 C&G (MOD) D424 C&G LC R/W 4.0'12.0' GRADE PROFILE 8.0' THRU/LT TURN RT TURN 100.0' SE RAMPNE RAMPNW RAMPLCR/W GRADE PROFILE 100.0' 2.0%2.0% 8.0' DESIGN SPEED = 50 MPH SW RAMP V A R ( 1: 4) ( O R F L A T T E R) 4.0% 6.0' BERM SW RAMP LC THRU 12.0' THRU 12.0' SHLD 10.0' 4.0% 1.5'4.0' SHLD 1.5' 4.0% THRU 12.0' THRU 12.0' SHLD 10.0' 4.0% 4.0' SHLD 1.5' 4.0% LC 1: 4 1:4 VAR. 75.0' S.B. T.H. 52 N.B. T.H. 52 1.5' LC N.B. T.H. 52 2.0%2.0% THRU 12.0' THRU 12.0'1'-6" 0'-2"0'-2" 1'-6" SHLDSHLD 5.33' LC S.B. T.H. 52 75.0' 5.33' 2.0% THRU 12.0' THRU 12.0'1'-6" 0'-2"0'-2" 1'-6" SHLDSHLD 5.33'5.33' EXISTING T.H. 52 BRIDGES EXISTING T.H. 52 VAR. 1.5%1.5%1.5%1.5% 1.5%1.5%1.5%1.5%2.0% LC 8.0'8.0' 4.0%2.0%2.0% 4.0% BERM 6.0' BERM 6.0' V A R ( 1: 4) ( O R F L A T T E R) VAR (1:4) (OR FLATTER) (MOD) D424 C&G (MOD) D424 C&G EXISTING RAMPS LC THRU 12.0' SHLD 10.0' THRU 12.0' 1.5' 2.0%4.0% SHLD 10.0' 4.0%2.0% EX. C.S.A.H. 42 EXISTING C.S.A.H. 42 1.5' EAST OF T.H. 52 LC THRU 12.0' SHLDTHRU 12.0' 2.0%4.0% SHLD 10.0' 4.0%2.0% EXISTING C.S.A.H. 42 1.5' WEST OF T.H. 52 LC 1.5' 4.0' 1 : 6 2.0%4.0%4.0%2.0% 1:6 THRU 12.0' SHLD THRU 12.0' SHLD 10.0' 1.5'1.5'4.0' LC THRU 12.0' THRU 12.0' 2.0%4.0%4.0%2.0% EX. C.S.A.H. 42 VAR.VAR. 10.0' MIN.10.0' MIN.2.5'2.5' EXISTING C.S.A.H. 42 UNDER T.H. 52 BRIDGES EX. T.H. 52 RAMPS VAR. LC THRU 12.0' GRADE PROFILE SHLDTHRU 12.0' 2.0%4.0% SHLD 10.0' 4.0%2.0% W.B. C.S.A.H. 42 1.5' 1:4 LC 1.5' 4.0' 2.0%4.0%4.0%2.0% THRU 12.0' SHLD THRU 12.0' SHLD 10.0' 1.5'1.5'4.0' DESIGN SPEED = 60 MPH C.S.A.H. 42 E.B.. C.S.A.H. 42 EX. W.B. C.S.A.H. 42 EX. E.B. C.S.A.H. 42 1: 4 1:4 LC THRU 12.0' GRADE PROFILE THRU 12.0' 2.0% SHLD 10.0' 4.0%2.0% W.B. C.S.A.H. 42 LC 2.0%4.0%2.0% THRU 12.0' THRU 12.0' SHLD 10.0' UNDER T.H. 52 BRIDGES C.S.A.H. 42 E.B.. C.S.A.H. 42 60.0' 2.0%2.0% 14.0'14.0' LT. TURNLT. TURN 8.0' MEDIAN GRADE PROFILE B424 C&G B424 C&G 4.0%4.0% 20.0'20.0' 1:2 1:2 CLEARANCE 16'-4" MIN. EX. BR. NO. 19001 & 19002 PROP. BR. NO. 19005 & 19006 THRU 12.0' SHLD 10.0' 4.0%2.0% 1.5' 1:4 LC 4.0% 2.0% THRU 12.0' SHLD 10.0' 1.5' C.S.A.H. 42 VAR. E.B. C.S.A.H. 42 GRADE PROFILE (MOD) D424 C&G B424 C&GB424 C&G EAST OF CONLEY AVE VAR. V A R. VAR.VA R. CL EXISTING C.S.A.H. 42 CL EXISTING C.S.A.H. 42 CL W.B. C.S.A.H. 42 CL EXISTING C.S.A.H. 42 VAR. DESIGN SPEED = 70 MPH (MOD) D424 C&G 8.0' 4.0% VAR (1:4) (OR FLATTER) BERM 6.0' 1: 4 CLEAR ZONE 30.0' VAR (1:3)V A R ( 1: 3) CLEAR ZONE 30.0' 4.0' 8.0' CLEAR ZONE 30.0' CLEAR ZONE 30.0' 1: 4 1:3 8.0' 4.0' 1: 3 VAR. (60' MAX.) 2.0% THRU 0'-12.0'VAR. (28' MAX.) GRADE PROFILE V A R.VAR. VAR. VAR. V A R ( 1: 4) ( O R F L A T T E R) VAR. VAR. VAR (1:4) (OR FLATTER) R/W 75' R/W 75' R/W MIN. 63' R/W MIN. 63' 18.0'18.0' 2.0%2.0%