EXECUTIVE SUMMARY
City Council Work Session: February 8, 2016
AGENDA ITEM: Update - TH 52/CSAH 42 Interchange,
City Project 461
AGENDA SECTION:
Discussion
PREPARED BY: Patrick Wrase, PE, Director of Public
Works/City Engineer AGENDA NO. 2.a.
ATTACHMENTS: Project Area Map APPROVED BY: ddj
RECOMMENDED ACTION: Discussion regarding the Dakota County project to
reconstruct the interchange at TH 52 and CSAH 42
BACKGROUND
In April of 2015, the City of Rosemount entered into a Joint Powers Agreement with Dakota County for
the reconstruction of the interchange at TH 52 and CSAH 42, including the expansion of CSAH 42 to a 4-
lane highway, replacement of two bridges on TH 52, and the reconstruction of the ramps. Rosemount
will be a cost sharing participant in the project according to the established Dakota County cost sharing
arrangement. Rosemount contributions to the project have been included in the City of Rosemount’s 10-
year Capital Improvement Program.
The project has been awarded $10,205,000 in Federal Funding and recently awarded a MnDOT
Transportation and Economic Development (TED) Grant in the amount of $3,100,000. Rosemount and
County staff have agreed that the TED funds will be utilized to extend the project east to the location of a
proposed company intending to locate east of the TH52/CSAH42 interchange. This is approximately
one-half of a mile east of the originally intended terminus of the project. It is estimated that this extension
will require approximately $1.1 million in additional funding bringing the total project cost to
approximately $19.1 million. Allocation of the $1.1 million to the County Road 42 extension leaves
approximately $2 million in TED Grant funds that will be utilized to reduce the City and County
contributions to the project. Assuming an equal distribution of the grant funds to each party, Dakota
County will fund $3.275 million and Rosemount $2.5 million of the 42/52 project costs.
Design of the 42/52 project has been ongoing for the last several months. A topic of discussion recently
has been the method of traffic routing during the construction of the project. Routing Option 1 would
keep two-way traffic on both 42 and 52 during construction, using cross overs and lane reductions on
TH52 and a single lane in each direction on CSAH42. This option would take more time for total
construction and would require two construction seasons to complete the project. One bridge would be
built the first construction season, a return to full operations during the winter months and then similar
lane reductions the following construction season while the second bridge is rebuilt.. Option 2 would
allow both bridges to be constructed in one season by routing the TH52 traffic along the entrance/exit
ramps and completely closing off CSAH42 within the TH52 corridor. The CSAH42 traffic would be
required to detour to TH52 in order to circumvent the construction area. This may require detouring as
far south as CSAH46 for eastbound 42 traffic and as far north as 117th Street for westbound 42 traffic.
2
Dakota County’s engineering consultant has examined the cost of the two routing options. They have
determined that Option 2 would result in a savings of approximately $800,000 as compared to the two
season Option 1 project. Additionally, the staging options have been presented to the residents and
businesses adjacent to the project area at a meeting held on December 15, 2015. The consensus was that
the project area residents supported Option 2, allowing the project to be completed in one season and
thereby reducing the time of impact. With the significant cost savings of the single season staging option
and the level of approval gained at the December 15 meeting, Dakota County is planning to continue the
development of the project plans to incorporate the design features necessary for the single season Option
2 staging method.
Prior to the ordering of the project by Dakota County, the County will seek municipal consent of the
project and the design features. Dakota County staff is tentatively planning to have the Rosemount City
Council consider a resolution of municipal consent for a March regular meeting of the Council.
SUMMARY
The TH52 and CSAH 42 project has received Grant Funding that will enable the project to be extended
east to the access point of a planned industrial development and will reduce the expenditures of other City
and County funds. The staging plan for the project will include a full closure of CSAH 42 at the
interchange in order to allow for the project to be constructed in a single construction season. Dakota
County will be requesting a resolution of municipal consent at a March meeting of the Rosemount City
Council in order to proceed with final design and bidding of the project. A representative from Dakota
County will be in attendance at the Work Session to offer more information and answer questions about
the project.
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X C
X C
X C
X X X X X X X X X X X X X
X
C
X
C
X
C
X C
X C
X C
X C
X C
X C
X C
X C
X C
X C
X C
X C
X C
X C
X C
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X
X
X
X
X
X
X
X
X
X
X C
X C
X C
X C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
XC XC XC XC XC
X
C
X
C
XC
X
X
X
X
X
X
X
X
X
X
X X X
X C
X
C
X
C
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
C
X
C
X
C
X C
X
C
X C
X C
X C
X
X
XC XC XC
XC XC
X X X X X X X X
X
X
X
X
X
A
R
E
A
U
N
D
E
R
C
O
N
S
T
R
U
C
T
I O
N
A
R
E
A
U
N
D
E
R
C
O
N
S
T
R
U
C
T
I O
N
X
C
X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
X
C
XC
XC
X
C
X
C
X
C
X
C
X
C
X
C
X
C
SSS
S
S
?
?
?
?
?
?
?
?
?
?
S
T
O
C
K
P
I
L
E
?
?
?
MB
MB
MB
MB MB
DI
DI
DI
DI
DI
DI
DI
DI
DIDI
DI
DI
DI
DI
DI
DI
T
T
M
M
M
M
M
M
M
M
M
M
M
W
B
-
6
7
A
A
S
H
T
O
20
1
1 (
U
S)
WB-67
AASHTO 2011 (US)
WB-67
AASHTO 2011 (US)
W B -6 7
A A S H T O 2 0 1 1 (U S )
W B -
6 7
A A S H T O 20 1 1 (U S )
WB-67
AASHTO 2011 (US)
(c) 2015 Transoft Solutions, Inc. All rights reserved.
W
B
-
6
7
A
A
S
H
T
O
2
0
1
1
(
U
S
)
(c) 2015 Transoft Solutions, Inc. All rights reserved.
7
0
7
5
5
3
5
5
2
0
5
2
5
5
3
0
5
4
0
5
4
5
5
5
0
5
2
0
5
2
5
5
3
0
5
4
0
5
4
5
5
5
0
8
0
8
5
1
0
1
5
2
5
2
0
150
135
140
145 155 160
165
170
175
150
135
140
145
155 160
165 170 175 180 185 190 195
6
5
6
0
5
3
5
LOCATION MAP
PROJECT LOCATION
P
r
e
p
a
r
e
d
B
y
R
e
v
i
e
w
e
d
B
y
L
e
v
e
l
1
L
A
Y
O
U
T
A
P
P
R
O
V
A
L
2
0
2
0
2
0
2
0
2
0
R
e
v
i
e
w
e
d
B
y
A
p
p
r
o
v
e
d
B
y
A
p
p
r
o
v
e
d
B
y
S
t
a
t
e
D
e
s
i
g
n
E
n
g
i
n
e
e
r
S
t
a
t
e
G
e
o
m
e
t
r
i
c
s
E
n
g
i
n
e
e
r
P
r
o
g
r
a
m
m
e
d
L
e
t
t
i
n
g
D
a
t
e
R
e
v
i
e
w
e
d
B
y
2
0
D
A
T
E
:
L
I
C
.
N
O
.
:
E
N
G
R
.
:
T
H
E
L
A
W
S
O
F
T
H
E
S
T
A
T
E
O
F
M
I
N
N
E
S
O
T
A
.
S
U
P
E
R
V
I
S
I
O
N
A
N
D
T
H
A
T
I
A
M
A
D
U
L
Y
L
I
C
E
N
S
E
D
P
R
O
F
E
S
S
I
O
N
A
L
E
N
G
I
N
E
E
R
U
N
D
E
R
I
H
E
R
E
B
Y
C
E
R
T
I
F
Y
T
H
A
T
T
H
I
S
L
A
Y
O
U
T
W
A
S
P
R
E
P
A
R
E
D
B
Y
M
E
O
R
U
N
D
E
R
M
Y
D
I
R
E
C
T
R
e
v
i
e
w
e
d
B
y
2
0
M
e
t
r
o
D
i
s
t
r
i
c
t
P
r
e
li
m
i
n
a
r
y
D
e
s
i
g
n
E
n
g
i
n
e
e
r
M
e
t
r
o
D
i
s
t
r
i
c
t
M
a
i
n
t
e
n
a
n
c
e
O
p
e
r
a
t
i
o
n
s
E
n
g
i
n
e
e
r
M
e
t
r
o
D
i
s
t
r
i
c
t
T
r
a
f
f
i
c
E
n
g
i
n
e
e
r
M
e
t
r
o
D
i
s
t
r
i
c
t
E
n
g
i
n
e
e
r
LEGEND
WETLANDS
(TOE OF SLOPE)
PRELIMINARY CONSTRUCTION LIMITS
RAISED MEDIANS & CURBS
PAVED SHOULDERS
BRIDGES & RETAINING WALLS
PROPOSED PONDING LOCATION
EXISTING RIGHT OF WAY
PROPOSED RIGHT OF WAY
2000100
scale in feet
C.S.A.H. 42
N
W R
A
M P
S
W
R
A
M
P
TURN MOVEMENTS
WEST RAMPS
TURN MOVEMENTS
WEST RAMPS
C.S.A.H. 42
N
E
R
A
M
P
S
E
R
A
M P
WB-67
DESIGN VEHICLE
WB-67
DESIGN VEHICLE
WB-67
DESIGN VEHICLE
C.S.A.H. 42
TURN MOVEMENTS
CONLEY AVE.
C
O
N
L
E
Y
A
V
E
.
FUTURE CONSTRUCTION "BY OTHERS"
H
:
\
P
r
o
j
e
c
t
s
\
8
7
4
9
\
C
A
D
_
B
I M
\
L
a
y
o
u
t
\
8
7
4
9
_
S
t
a
f
f
A
p
p
r
o
v
e
d
_
l o
a
.
d
g
n
2
/
1 /
2
0
1
6
-
D
A
T
E
P
L
O
T
T
E
D
T
h
e
a
li
g
n
m
e
n
t
a
n
d
g
r
a
d
e
s
s
h
o
w
n
o
n
t
h
i
s
m
a
p
a
r
e
t
e
n
t
a
t
i
v
e
a
n
d
s
u
b
j
e
c
t
t
o
c
h
a
n
g
e
w
i
t
h
o
u
t
n
o
t
i
c
e
.
S
t
a
f
f
A
p
p
r
o
v
a
l
T
h
e
t
r
a
f
f
i
c
v
o
l u
m
e
s
s
h
o
w
n
a
r
e
B
y
T
.
H
.
V
I
C
I
N
I
T
Y
O
F
5
2
1
6
1
0
0
F
R
O
M
C
o
p
y
T
o
:
F
o
r
:
D
E
S
I G
N
F
I L
E
:
D
A
T
E
:
T
.
H
.
A
.
J
.
P
P
M
S
A
c
t
i
v
i
t
y
0
1
9
-
6
4
2
-
0
5
9
X
X
S
.
P
.
T
.
H
.
A
.
J
.
P
P
M
S
A
c
t
i
v
i
t
y
S
.
P
.
T
.
H
.
A
.
J
.
P
P
M
S
A
c
t
i
v
i
t
y
f
t
.
2
0
P
r
e
p
a
r
e
d
S
c
a
l e
:
H
o
r
.
1
i
n
c
h
=
D
a
t
e
:
C
O
P
Y
N
o
.
L
A
Y
O
U
T
N
o
.
e
s
t
i
m
a
t
e
d
f
o
r
y
e
a
r
P
r
e
p
a
r
e
d
2
0
8
7
0
F
E
E
T
S
O
U
T
H
O
F
C
.
S
.
A
.
H
.
4
2
T
O
7
6
0
F
E
E
T
N
O
R
T
H
O
F
C
.
S
.
A
.
H
.
4
2
AGGREGATE DRIVEWAYS/FIELD ENTRANCES
PAVED ROADWAYS
F
E
B
R
U
A
R
Y
1
6
2
0
3
5
A
u
g
u
s
t
1
5
P
H
A
S
E
I
M
E
M
O
R
A
D
U
M
T
R
A
F
F
I
C
O
P
E
R
A
T
I
O
N
S
A
N
A
L
Y
S
I
S
R
O
S
E
M O
U
N
T
,
M N
1
B
P
R
O
J
E
C
T
D
E
S
C
R
I
P
T
I
O
N
R
E
C
O
N
S
T
R
U
C
T
I
N
T
E
R
C
H
A
N
G
E
LAYOUT HISTORY
TEMPORARY EASEMENT
4
5
0
3
9
0
2
/
0
1
/
2
0
1
6
5
2
S
.
P
.
FOR THE TH 52 BRIDGES AND IMPROVING THE VERTICAL AND HORIZONTAL GEOMETRY OF CSAH 42.
CURRENT OPERATIONAL AND SAFETY CONCERNS BY BUILDING THE NEW BRIDGE PIERS AT THE APPROPRIATE LOCATION
STORM WATER PONDS. THE FIRST PHASE OF THE PROJECT WILL INCLUDE INTERCHANGE IMPROVEMENTS TO ADDRESS THE
AT ALL INTERSECTIONS WITH RAMPS AND DESIGNATED LOCAL ROADS. THE PROJECT ALSO INCLUDES CONSTRUCTION OF
OVER CSAH 42, AND RECONSTRUCTING THE FREEWAY ACCESS RAMPS. PROTECTED TURN LANES WILL BE INCLUDED ON CSAH 42
0.3 MILES WEST OF TH 52 TO 0.5 MILES EAST OF TH 52, RECONSTRUCTING TH 52 AND REPLACING TWO MAINLINE BRIDGES
RECONSTRUCTING CSAH 42 TO A FOUR-LANE DIVIDED COMBINATION URBAN/RURAL ROADWAY SECTION FROM APPROXIMATELY
INCLUDE THE STAGED RECONSTRUCTION OF THE EXISTING SERVICE INTERCHANGE (FULL DIAMOND). THIS PROJECT INCLUDES
THIS PROJECT HAS BEEN BROKEN IN TO TWO PHASES OF WORK. THE FIRST AND CURRENT PHASE OF THE PROJECT WILL
(CLOVERLEAF) INTERCHANGE.
A FUTURE PROPOSED SECOND PHASE OF THE PROJECT WOULD UPGRADE THE SERVICE (DIAMOND) INTERCHANGE WITH A SYSTEM
INTERCHANGE DESIGN HAD BOTH AN APPROVED ENVIRONMENTAL ASSESSMENT (EA) AND GEOMETRIC LAYOUT.
A FOUR-LANE DIVIDED COMBINATION URBAN/RURAL ROADWAY SECTION WITH PROTECTED TURN LANES. THE CLOVERLEAF
TWO TH 52 MAINLINE BRIDGES OVER CSAH 42, NEW FREEWAY ACCESS RAMPS, AND RECONSTRUCTING A PORTION OF CSAH 42 TO
BY THE INTERCHANGE REVIEW COMMITTEE RECOMMENDED A CLOVERLEAF INTERCHANGE WHICH INCLUDES RECONSTRUCTING
THE HIGHWAY 52/42 INTERCHANGE ENVIRONMENTAL ASSESSMENT (STUDY REPORT, FEBRUARY 2004) AND SUBSEQUENT REVIEW
SAFETY, RELIABILITY, AND CONTINUITY FOR THE EAST-WEST THROUGH TRAFFIC.
TO ACCOMMODATE PROJECTED TRAFFIC VOLUMES AT THE INTERCHANGE. THESE IMPROVEMENTS WILL INCREASE THE
LIMITED SIGHT DISTANCE AT THE INTERSECTIONS, CREATING SAFETY AND CAPACITY CONCERNS THAT REQUIRE CORRECTION
UNDERPASS AT THE INTERCHANGE IS LIMITED TO ONE LANE WITH LIMITED TURN LANE SPACE IN EACH DIRECTION AND
SECTION OF TH 55 AND CSAH 42 BE UPGRADED TO A FOUR LANE CONTINUOUS EAST-WEST FACILITY. THE EXISTING
2002), IT WAS RECOMMENDED THAT THE SUB-STANDARD HIGHWAY 52/55 INTERCHANGE BE ELIMINATED AND THE COMMON
PLAN (APRIL 2002), AND HIGHWAY 52/45/55 INTERCHANGE AND HIGHWAY 55 REGIONAL CORRIDOR STUDY (STUDY REPORT, MAY
AS PART OF THE COUNTY HIGHWAY 42 CORRIDOR STUDY (1999), HIGHWAY 52 INTERREGIONAL CORRIDOR (IRC) MANAGEMENT
LAYOUT NO. 1
LAYOUT NO. 1A
TH 52 PROFILES HAVE BEEN UPDATED.
INCORPORATED COMMENTS FROM MNDOT METRO LAYOUT APPROVAL COMMITTEE RECEIVED 11/17/2015.
C
R
A
I
G
H
A
S
S
J
A
N
U
A
R
Y
2
0
1
7
OF THE 2035 TRAFFIC NUMBERS.
THE NW RAMP TURN LENGTHS ARE BASED ON QUEUING NEEDS 5.
IS STOP CONTROL FOR THE EXIT RAMPS.
PROPOSED INTERSECTION CONTROL AT THE CSAH 42 / RAMP INTERSECTIONS4.
INTERSECTION LIGHTING WILL BE USED AT THE RAMP TERMINALS.3.
TH 52 IS AN APPROVED HOUSE MOVING ROUTE.2.
THERE ARE NO DESIGN EXCEPTIONS ON THIS PROJECT.1.
GENERAL NOTES
LAYOUT NO. 1B
GUTTER TO THE RAMP INTERSECTION RADII.
PULLING THE MEDIAN MOSES CLOSER TO TH 52 IN THE INTERCHANGE AREA, AND ADDING CURB AND
WHICH INCLUDED MAINTAINING A CONSTANT MEDIAN WIDTH ON CSAH 42 IN THE INTERCHANGE AREA,
INCORPORATED COMMENTS FROM MNDOT METRO LAYOUT APPROVAL COMMITTEE RECEIVED 1/12/16,
A
R
N
O
L
D
A
V
E
.
A
U
S
T
I
N
C
T
.
ST.
ST.E.
A
K
R
O
N
A
V
E
.
B
L
A
I
N
E
A
V
E
.
A
K R
O
N
A
N
G
U
S B
A
R
B
A
R
A
B
A
B
C
O
C
K
A
U
D
R
E
Y
B
L
A
I
N
E
A
V
E
.
A
V
E
.
A
V
E
.
A V
E .
A
V
E
.
A
V
E
.
ST.
ST.
ST.
E.
E.
E.
ST.E.
E
H
L
E
R'
S
P
A
T
H
PINE BEND TR.
PI
N
E
B
E
N
D
T
R.
C
O
U
R
T
H
O
U
S
E
B
L
V
D.
F
A
H
E
Y
A
V
E
.
E
.
E
.
MINNESOTA ROSEMOUNT RESEARCH CENTER
D
O
N
N E
L
L
Y
A
V
E
.
B
L
A
I
N
E
C T
.
52
52
55
55
42
42
71
81
ROSEMOUNT
COATES
EMPIRE TOWNSHIP
T115N R18W
19 20
2930
1617
20 21
T115N
R18WR19W
18
19
13
24
14
22 23
T115N R19W
15
2627
34 35
T115N R19W
T115N
R18W
30
31
25
36
R19W
35 36
12
T114N R19W
T115N R19W T115N R18W
T114N R18W
31 32
56
T115N R18W
2829
32 33
Pine Bend
34 35
T27N R22W
7
T115N
7
18
12
13
R19W R18W
T27N R22W
T115W R19W
33 34
12
T27N R22W
T115N R19W
32 33
111011
1415
T115N R18W
71
A
S
H E
R
A
V
E
.
ST.E.
D
O
Y
LE
P
A
T
H
ST. E.116th
120th
117th
138th ST. E.
155th
152nd
153rd
145th
140th
164th ST. E.
117th
142nd ST. E.
T
2
T
142nd ST.
160th ST. E.
154th ST. W.
T115N R18W
T115N R19W
23 24
26 25
T115N R19W
U n i o n
P a c i f i c
R a il
r o a d U
ni
o
n
P
a
cifi
c
R
ailr
o
a
d
C
L
A
R
K
R
D
.
C
O
N
L
E
Y
A
V
E
.
46
46 46
C
O
M S
T
O
C
K
A
V
E
.
E
.
B
A R
D
A
V
E
.
AKRON
AVE.
46
A
V
E
.
158th ST. E.
186th ST. E.
Union Pacific Railroad
C
L
A
Y
T
O
N
A
V
E
.
C
L
A
Y
T
O
N
BONAIRE E.
2010 POP. 161
2010 POP. 2,444
2010 POP. 21,874
160th ST. E.
73
73
73
73
AVE.
141st ST. W.
141st ST. E.
A D D I S
O N
A V E .
PATH
E.
B
L
V
D
.
CT. W.
th
W.
Union Pacific Railroad
140th ST. E.
C T .
ADD
I S ON
ABERCORN
PATH
B
L
V
D
.
V
A
L
L
E
Y
125th ST.E.
R
I
C
H
145th ST.E.
42
ST.E.
42
160th ST.E.
E
M
E
R
Y
A
V
E
.
Roseport
A D R I AN
AV
E .
A D R I AN
C T
.
DAKOTA COUNTY
WB-67
AASHTO 2011 (US)
W B -
6 7
A A S H T O 2 0 11
(US )
W
B
-
6
7
A
A
S
H
T
O
20
1
1 (
U
S)
WB-67
AASHTO 2011 (US)
WB-67
AASHTO 2011 (US)
W B -67
AA S H T O 2 0 1 1 (U S )
WB-67
AASHTO 2011 (US)
(c) 2015 Transoft Solutions, Inc. All rights reserved.
W
B
-
6
7
A
A
S
H
T
O
2
0
1
1 (
U
S)
(c) 2015 Transoft Solutions, Inc. All rights reserved.
W
B
-
6
7
A
A
S
H
T
O
2
0
1
1
(
U
S
)
WB-67
AASHTO 2011 (US)
WB-67
AASHTO 2011 (US)
W
B
-
6
7
A
A
S
H
T
O
2
0
1
1
(
U
S
)
W
B
-
6
7
A
A
S
H
T
O
2
0
1
1
(
U
S
)
WB-67
AASHTO 2011 (US)
WB-67
AASHTO 2011 (US)(c) 2015 Transoft Solutions, Inc. All rights reserved.
W B -
67
AA S H T O 20
1
1
(U S )
(c) 2015 Transoft Solutions, Inc. All rights reserved.
{ E.B. C.S.A.H. 42
{ W.B. C.S.A.H. 42
{ NW RAMP
{ NE RAMP
{ SE RAMP
{ N.B. T.H. 52
{ SW RAMP
{ S.B. T.H. 52
{ W.B. C.S.A.H. 42
{ E.B. C.S.A.H. 42
12'
12'
12'
12'
12'X 145' LT. TURN
12'
12'
12'
12'12'
12'
10' SHLD
10' SHLD
12'
12'
12'
12'
12'X 300' RT. TURN
12'
12'
12'
12'
10' SHLD
10' SHLD
10' SHLD
1:15
1:10 1:5
12'
12'
12'
12'
14'X 400' LT. TURN
10' SHLD
10' SHLD
1:58'
14'X 400' LT. TURN
12'
12'
12'
12'
10' SHLD
10' SHLD
10' SHLD
12'
12'
12'
12'
10' SHLD
1:10
12'
12'
12'
12'
10' SHLD
12'X 300' LT. TURN
12'X 300' RT. TURN
12'
12'
12'
12'
10' SHLD
1:15
10' SHLD
12'
12'
10' SHLD
10' SHLD
10' SHLD
12'
12'
L
T
.
T
U
R
N
R
T
.
T
U
R
N
1
:
1
0
1
:
1
0
1
0
'
S
H
L
D1
2
'
1
2
'
1
2
'
2
1
'
2
2
.
6
'
20'
56'
20'R
40'R
10'R
75'R
10'R 10'R
250'R
260'R
10'R
72'R
6'R
6'R
52'R
20'R 20'R
377'R
4' SHLD
EX. 10' SHLD
EX. 12' THRU
EX. 12' THRU
EX. 12' THRU
EX. 12' THRU
EX. 10' SHLD
4' SHLD
4' SHLD
4' SHLD
EX. 10' SHLD
EX. 12' THRU
EX. 12' THRU
EX. 10' SHLD
E
X
.
1
0
'
S
H
L
D
E
X
.
1
2
'
T
H
R
U
E
X
.
1
2
'
T
H
R
U
E
X
.
1
0
'
S
H
L
D
E
X
.
1
2
'
T
H
R
U
E
X
.
1
2
'
T
H
R
U
E
X
.
1
2
'
T
H
R
U
E
X
.
1
2
'
T
H
R
U
E
X
.
1
0
'
S
H
L
D
E
X
.
4
'
S
H
L
D
E
X
.
1
0
'
S
H
L
D
E
X
.
4
'
S
H
L
D
E
X
.
1
0
'
S
H
L
D
E
X
.
1
2
'
T
H
R
U
E
X
.
1
2
'
T
H
R
U
E
X
.
4
'
S
H
L
D
E
X
.
4
'
S
H
L
D
E
X
.
1
2
'
T
H
R
U
E
X
.
1
2
'
T
H
R
U
E
X
.
1
0
'
S
H
L
D
1
2
'
1
2
'
1
0
'
S
H
L
D
4
'
S
H
L
D
1
0
'
S
H
L
D
4
'
S
H
L
D
1
2
'
1
2
'
1
0
'
S
H
L
D
1
0
'
S
H
L
D
1
2
'
1
2
'
1
2
'
1
2
'
4
'
S
H
L
D
4
'
S
H
L
D
E
X .
1
6
'
T
H R
U
E
X
.
1
6
'
T
H
R
U
E
X
.
1
6
'
T
H
R
U E
X
.
1
6
'
T
H R
U
1
:
1
5
1
2
'X
3
0
0
'
R
T
.
T
U R N
1
2
'
T
H R
U /
L
T
.
T
U R
N
1
6
'
1
4
'
6
'
1
6'
1
:
1
5
1
2
'X
5
0
0
'
T
H R
U
/
L
T
.
T
U R
N
1
2
'
R
T
.
T
U R N
8
'
4
'
PROP. BR. NO. 19006
EX. BR. NO. 19002EX. BR. NO. 19001
PROP. BR. NO. 19005
8
'
8
'
4
'
8
'
C.S.A.H. 42
N
W
R
A
M
P
S
W
R
A
M
P
C.S.A.H. 42
N
E
R
A
M
P
S
E
R
A
M
P
DAKOTA COUNTY
DAKOTA COUNTY
CITY OF ROSEMOUNT
CITY OF ROSEMOUNT
S
P
E
E
D
P
O
S
T
E
D
E
X
I
S
T
I
N
G
S
P
E
E
D
L
I
M
I
T
5
5
S
P
E
E
D
P
O
S
T
E
D
E
X
I
S
T
I
N
G
S
P
E
E
D
L
I
M
I
T
5
5
S
P
E
E
D
P
O
S
T
E
D
E
X
I
S
T
I
N
G
S
P
E
E
D
L
I
M
I
T
5
5
S
P
E
E
D
P
O
S
T
E
D
E
X
I
S
T
I
N
G
S
P
E
E
D
L
I
M
I
T
5
5
S
P
E
E
D
P
O
S
T
E
D
E
X
I
S
T
I
N
G
S
P
E
E
D
L
I
M
I
T
6
5
SPEED
POSTED
EXISTING
SPEED
LIMIT
65
S
P
E
E
D
P
O
S
T
E
D
E
X
I
S
T
I
N
G
S
P
E
E
D
L
I
M
I
T
6
5
SPEED
POSTED
EXISTING
SPEED
LIMIT
65
C.S.A.H. 42
C
O
N
L
E
Y
A
V
E
.
209A/203P
10A/,1P
1
A
/
5
P
1
7
A
/
5
9
P
267P/119A
14P/31A
PEAK HOUR TRAFFIC VOLUMES
YEAR 2035
PEAK HOUR TRAFFIC VOLUMES
YEAR 2035
PEAK HOUR TRAFFIC VOLUMES
YEAR 2035
220A/237P
6A/25P
262P/144A
254P/562A
16
P
/
6
A
1 P
/
2
A
10
3
P
/
9
1
A
6A/7P
305A/333P
123P/68A
497P/688A
18
A
/
19
P
0
A
/
0
P
2
2
2
A
/
6
2
3
P
BOTTOM ELEV.=850
BOTTOM ELEV.=847
ELEV.=874
BOTTOM
ELEV.=873
BOTTOM
60'R
40'R
16'
24'
20'
24'
20'
9.75'R
4' SHLD
12' X 300' RT. TURN
12' SHLD1:15
4' SHLD
4' SHLD
(60 MPH)
e = NC
00°32'09" C
(60 MPH)
e = NC
00°28'07" C
(60 MPH)
e = NC
00°30' C
(60 MPH)
e = NC
00°30' C
(60 MPH)
e = NC
00°30' C
(60 MPH)
e = NC
00°30' C
(60 MPH)
e = NC
00°30' C
(30 MPH)
e = NC
2°00' C
2
9
,
0
0
0
Y
E
A
R
2
0
1
2
A
D
T
7
0
M P
H
P
R
O
P
O
S
E
D
D
E
S
I
G
N
S
P
E
E
D
T
.
H
.
5
2
15,000 YEAR 2035 ADT
6,000 YEAR 2015 ADT
60 MPH PROPOSED DESIGN SPEED
C.S.A.H. 42
28,000 YEAR 2035 ADT
12,100 YEAR 2015 ADT
60 MPH PROPOSED DESIGN SPEED
C.S.A.H. 42
3
2
,
5
0
0
Y
E
A
R
2
0
1
2
A
D
T
7
0
M P
H
P
R
O
P
O
S
E
D
D
E
S
I
G
N
S
P
E
E
D
T
.
H
.
5
2
(60 MPH)
e = NC
00°30' C
(AASHTO CASE B2, NO OBSTRUCTIONS, ISD = 926')
SIGHT LINE FOR RIGHT TURN, SE RAMP
(AASHTO CASE B1, NO OBSTRUCTIONS, ISD = 1262')
SIGHT LINE FOR LEFT TURN, NW RAMP
(AASHTO CASE B2, NO OBSTRUCTIONS, ISD = 1262')
SIGHT LINE FOR RIGHT TURN, NW RAMP
(AASHTO CASE B1, NO OBSTRUCTIONS, ISD = 1262')
SIGHT LINE FOR LEFT TURN, SE RAMP
{ CONLEY AVE
(AASHTO CASE B2, NO OBSTRUCTIONS, ISD = 926')
SIGHT LINE FOR RIGHT TURN, CONLEY AVE
(AASHTO CASE B1, NO OBSTRUCTIONS, ISD = 1200')
SIGHT LINE FOR LEFT TURN, CONLEY AVE
75'
75'
60'
105'R
105'R
ROSEMOUNT, MN 55068
3270 145TH ST E
VICTOR & BERNICE WENZEL
ROSEMOUNT, MN 55068
3175 145TH ST E
NEW YORK COMMUNITY BANK
ROSEMOUNT, MN 55068
3205 145TH ST E
JASON JOHNSON
ROSEMOUNT, MN 55068
3151 145TH ST E
DUANE GOULSON
ROSEMOUNT, MN 55068
3155 145TH ST E
ROLLAND & DIANNE SACHS
ROSEMOUNT, MN 55068
3110 140TH ST E
FLINT HILLS RESOURCES PINE BEND LLC
ROSEMOUNT, MN 55068
3275 145TH ST E
PINE BEND LLC
FLINT HILLS RESOURCES
ROSEMOUNT, MN 55068
3337 145TH ST E
KENNETH & BARBARA ANGERMAN
ROSEMOUNT, MN 55068
3381 145TH ST E
TERRENCE NAPPER
ROSEMOUNT, MN 55068
3330 145TH ST E
CAREY & LESLIE RECHTZIGEL
ROSEMOUNT, MN 55068
14727 CLAYTON AVE
MARLIN & JOANN RECHTZIGEL
ROSEMOUNT, MN 55068
3275 145TH ST E
PINE BEND LLC
FLINT HILLS RESOURCES
ROSEMOUNT, MN 55068
3405 145TH ST E
RONALD LAUMBACH
MARLIN & JOANN RECHTZIGEL
CITY OF ROSEMOUNT
MARLIN & JOANN RECHTZIGEL
ROSEMOUNT, MN 55068
4230 145TH ST E
RAYMOND OSTERTAG
HANS ABRAHAMSEN
ROSEMOUNT, MN 55068
4322 145TH ST E
KNOLL FRANK LIVING TRUST
GREAT RIVER ENERGY
ROSEMOUNT, MN 55068
3000 145TH ST E
3CW LLC
VIC'S CRANE AND HEAVY HAUL, INC.
ROSEMOUNT, MN 55068
3615 145TH ST E
CMC PROPERTIES LLC
B & R CATTLE & TRUCKING
ROSEMOUNT, MN 55068
14345 CONLEY AVE
CMC PROPERTIES LLC
WAYNE TRANSPORTS INC.
ROSEMOUNT, MN 55068
3750 140TH ST E
RAHN FAMILY LTD PARTNERSHIP
RICH VALLEY GOLF COURSE
ROSEMOUNT, MN 55068
3855 145TH ST E
RAHN FAMILY LTD PARTNERSHIP
RICH VALLEY GOLF COURSE
1:15
1:15
1:60
52'
179'
LC R/W
GRADE
PROFILE
8.0'8.0'
4.0%2.0%2.0%
4.0%
BERM
6.0'
BERM
6.0'
V
A
R (
1:
4)
(
O
R
F
L
A
T
T
E
R)
VAR (1:4)
(OR FLATTER)
(MOD)
D424 C&G
(MOD)
D424 C&G
DESIGN SPEED = 50 MPH
LC
THRU
12.0'
GRADE
PROFILE
THRU
12.0'
2.0%2.0%
SHLD
10.0'
4.0%
1.5'4.0'
SHLD
1.5'
4.0%
THRU
12.0'
GRADE
PROFILE
THRU
12.0'
2.0%2.0%
SHLD
10.0'
4.0%
4.0'
SHLD
1.5'
4.0%
LC
CLEAR ZONE
1:6
DESIGN SPEED = 70 MPH
1:
4 1:4
VAR.
75.0'
S.B. T.H. 52 N.B. T.H. 52
38.0'
VAR (1:3)
1
:
6
V
A
R (
1:
3)
1.5'
CLEAR ZONE
38.0'
T.H. 52
LC N.B. T.H. 52
THRU
12.0'
GRADE
PROFILE
THRU
12.0'
2.0%2.0%
SHLD
12.0'
2.0%2.0%
6.0'
SHLD
T.H. 52 BRIDGES
2.0%2.0%2.0%2.0%
GRADE
PROFILE
THRU
12.0'
THRU
12.0'6.0'
SHLDSHLD
12.0'
LC S.B. T.H. 52
75.0'
NE RAMP
8.0'
4.0%2.0%2.0%
4.0%
BERM
6.0'
BERM
6.0'
VAR (1:4)
(OR FLATTER)
V
A
R (
1:
4)
(
O
R
F
L
A
T
T
E
R)
DESIGN SPEED = 50 MPH
NW RAMP
(MOD)
D424 C&G
(MOD)
D424 C&G
LCR/W
4.0'12.0'
GRADE
PROFILE
8.0'
THRU/LT TURNRT TURN
80.0'-100.0'80.0'-100.0'
8.0'
4.0%2.0%2.0%
4.0%
BERM
6.0'
BERM
6.0'
V
A
R (
1:
4)
(
O
R
F
L
A
T
T
E
R)
VAR (1:4)
(OR FLATTER)
DESIGN SPEED = 50 MPH
SE RAMP
(MOD)
D424 C&G
(MOD)
D424 C&G
LC R/W
4.0'12.0'
GRADE
PROFILE
8.0'
THRU/LT TURN RT TURN
100.0'
SE RAMPNE RAMPNW RAMPLCR/W
GRADE
PROFILE
100.0'
2.0%2.0%
8.0'
DESIGN SPEED = 50 MPH
SW RAMP
V
A
R (
1:
4)
(
O
R
F
L
A
T
T
E
R)
4.0%
6.0'
BERM
SW RAMP
LC
THRU
12.0'
THRU
12.0'
SHLD
10.0'
4.0%
1.5'4.0'
SHLD
1.5'
4.0%
THRU
12.0'
THRU
12.0'
SHLD
10.0'
4.0%
4.0'
SHLD
1.5'
4.0%
LC
1:
4 1:4
VAR.
75.0'
S.B. T.H. 52 N.B. T.H. 52
1.5'
LC N.B. T.H. 52
2.0%2.0%
THRU
12.0'
THRU
12.0'1'-6"
0'-2"0'-2"
1'-6"
SHLDSHLD
5.33'
LC S.B. T.H. 52
75.0'
5.33'
2.0%
THRU
12.0'
THRU
12.0'1'-6"
0'-2"0'-2"
1'-6"
SHLDSHLD
5.33'5.33'
EXISTING T.H. 52 BRIDGES
EXISTING T.H. 52
VAR.
1.5%1.5%1.5%1.5%
1.5%1.5%1.5%1.5%2.0%
LC
8.0'8.0'
4.0%2.0%2.0%
4.0%
BERM
6.0'
BERM
6.0'
V
A
R (
1:
4)
(
O
R
F
L
A
T
T
E
R)
VAR (1:4)
(OR FLATTER)
(MOD)
D424 C&G
(MOD)
D424 C&G
EXISTING RAMPS
LC
THRU
12.0'
SHLD
10.0'
THRU
12.0'
1.5'
2.0%4.0%
SHLD
10.0'
4.0%2.0%
EX. C.S.A.H. 42
EXISTING C.S.A.H. 42
1.5'
EAST OF T.H. 52
LC
THRU
12.0'
SHLDTHRU
12.0'
2.0%4.0%
SHLD
10.0'
4.0%2.0%
EXISTING C.S.A.H. 42
1.5'
WEST OF T.H. 52
LC
1.5'
4.0'
1
:
6
2.0%4.0%4.0%2.0%
1:6
THRU
12.0'
SHLD THRU
12.0'
SHLD
10.0'
1.5'1.5'4.0'
LC
THRU
12.0'
THRU
12.0'
2.0%4.0%4.0%2.0%
EX. C.S.A.H. 42
VAR.VAR.
10.0' MIN.10.0' MIN.2.5'2.5'
EXISTING C.S.A.H. 42
UNDER T.H. 52 BRIDGES
EX. T.H. 52 RAMPS
VAR.
LC
THRU
12.0'
GRADE
PROFILE
SHLDTHRU
12.0'
2.0%4.0%
SHLD
10.0'
4.0%2.0%
W.B. C.S.A.H. 42
1.5'
1:4
LC
1.5'
4.0'
2.0%4.0%4.0%2.0%
THRU
12.0'
SHLD THRU
12.0'
SHLD
10.0'
1.5'1.5'4.0'
DESIGN SPEED = 60 MPH
C.S.A.H. 42
E.B.. C.S.A.H. 42
EX. W.B. C.S.A.H. 42 EX. E.B. C.S.A.H. 42
1:
4
1:4
LC
THRU
12.0'
GRADE
PROFILE
THRU
12.0'
2.0%
SHLD
10.0'
4.0%2.0%
W.B. C.S.A.H. 42 LC
2.0%4.0%2.0%
THRU
12.0'
THRU
12.0'
SHLD
10.0'
UNDER T.H. 52 BRIDGES
C.S.A.H. 42
E.B.. C.S.A.H. 42
60.0'
2.0%2.0%
14.0'14.0'
LT. TURNLT. TURN
8.0'
MEDIAN
GRADE
PROFILE
B424 C&G B424 C&G
4.0%4.0%
20.0'20.0'
1:2 1:2
CLEARANCE
16'-4" MIN.
EX. BR. NO. 19001 & 19002
PROP. BR. NO. 19005 & 19006
THRU
12.0'
SHLD
10.0'
4.0%2.0%
1.5'
1:4
LC
4.0%
2.0%
THRU
12.0'
SHLD
10.0'
1.5'
C.S.A.H. 42
VAR.
E.B. C.S.A.H. 42
GRADE
PROFILE
(MOD)
D424 C&G
B424 C&GB424 C&G
EAST OF CONLEY AVE
VAR.
V
A
R.
VAR.VA
R.
CL EXISTING C.S.A.H. 42
CL EXISTING C.S.A.H. 42
CL W.B. C.S.A.H. 42
CL EXISTING C.S.A.H. 42
VAR.
DESIGN SPEED = 70 MPH
(MOD)
D424 C&G
8.0'
4.0%
VAR (1:4)
(OR FLATTER)
BERM
6.0'
1:
4
CLEAR ZONE
30.0'
VAR (1:3)V
A
R (
1:
3)
CLEAR ZONE
30.0'
4.0'
8.0'
CLEAR ZONE
30.0'
CLEAR ZONE
30.0'
1:
4
1:3
8.0'
4.0'
1:
3
VAR. (60' MAX.)
2.0%
THRU
0'-12.0'VAR. (28' MAX.)
GRADE
PROFILE
V
A
R.VAR.
VAR.
VAR.
V
A
R (
1:
4)
(
O
R
F
L
A
T
T
E
R)
VAR.
VAR.
VAR (1:4)
(OR FLATTER)
R/W
75'
R/W
75'
R/W
MIN. 63'
R/W
MIN. 63'
18.0'18.0'
2.0%2.0%