Loading...
HomeMy WebLinkAbout8.a. Project Update City Projects Update Council City Council Receives Public Award Assessment Contract Payments % Project Project NameAuthorizes Open BidsStart DateContractorSummary Plans/Specs HearingContractHearingAmountTo DateComplete NumberPlans/Specs Authorize Ad For Bid E.H. Renner & 416$433,424$346,01580% Well 1610/01/13N/A11/18/1402/27/1503/17/1505/26/15N/ADrilling of the production well is complete. Test pumping is expected to occur in the next few weeks. Sons, Inc. 145th Street Easement Agreement recently signed by Canadian Pacific. Agreement already in place with Union Pacific. Railroad work for UP will Pedestrian UPRR, CPRR, 447 01/02/13N/AN/Abegin soon. An agreement with CP for the track extensions can be established now that the easement agreement has been executed. Improvements at TBD Upon execution of the agreement with CP for the track extensions, work will begin. Sidewalk work will begin after railroad work. RR Crossing Danbury Way Plans & Specs have been received by Council. The bid opening is scheduled for February 19, 2016 and the contract is expected to be 453 07/21/1507/21/1501/19/1602/19/1604/19/16June 201604/19/16 Reconstructionawarded April 19, 2016. This development includes 47 single-family homes by developer Ryland Homes. Ryland Homes is administering the contract Nodland PRIVATEPRIVATE 462 Greystone 4thN/AN/A04/13/15N/Aprivately. Base course paving, temporary cul-de-sac, sidewalk, trail and utilities are installed. Wear course paving will occur in Construction summer 2016. Prestwick Place Nodland This development includes 34 single-family homes by developer U.S. Home Corporation (Lennar). Lennar is administering the PRIVATEPRIVATE 463 N/AN/A05/18/15N/A 11thConstructioncontract privately. This project is substantially complete. Wear course paving will occur in summer 2016. This development includes 28 single-family homes by developer U.S. Home Corporation (Lennar). Lennar is administering the PRIVATEPRIVATE 464 Bella Vista 3rdN/AN/A08/03/15N/ASR Weidema contract privately. Base course paving is complete. Sidewalks and wear course paving will be complete in summer 2016. 132nd Street West Council received the feasibility report and assessment agreement on October 6, 2015. This project is on hold until the status of the 465 N/A ImprovementsDunmore project is determined. Horseshoe Lake Ryan 466$645,933$405,93363% 05/05/15N/A08/18/1509/04/1509/15/1510/19/15N/AUnderground utilities were completed in November. Electrical work, site work, and restoration will be completed by summer 2016. Lift StationContracting Dunmore 1st 467 N/AThis development includes 30 single-family homes by developer Copper Creek. This project is on hold by the developer. Addition Prestwick Place This development includes 31 single-family homes by developer KRB Development I, Inc. KRB is administering the contract privately. PRIVATEPRIVATE 468 N/AN/ATBDN/ATBD 12thBase course paving is complete. Sidewalks and wear course paving will be completed in summer 2016. This development includes 14 single-family homes by developer U.S. Home Corporation (Lennar). Lennar is expected to administer PRIVATEPRIVATE 469 Bella Vista 4thN/AN/AN/A the contract privately. Construction is expected to begin in spring 2016. Northern Air ENG-176$144,530$144,530100% City Hall GeneratorN/A06/16/1507/10/1507/21/1507/27/15N/AThis project is complete. The generator has been tested under full load and is fully functional. Corporation WSB & Associates, Inc. is the engineering consultant for the design and construction administration of the tank and booster station. 1.5MG Ground Due to a significant increase in the overall cost estimate for the project ($4.14 million vs. $6.03 million), the plans and specs have ENG-179 09/01/15N/A12/15/1502/05/16N/A Storage Tankbeen reviewed by an alternate engineering firm. Bids were opened February 5, 2016 but the award of the contract is on hold pending the result of the peer review. Bids were opened September 29, 2015 and a contact was to be awarded October 6, 2015. The low bidder, Keys Well Drilling, was the original contractor for Well 5 construction in 1963. The contractor produced construction records for Well 5 that have complicated the Wells 4 & 5 sealing project. Further investigation with the MDH has resulted in the need for adjustments in the abandonment method for Well 5; Keys Well ENG-181$39,250 Sealing, New N/A09/01/1509/29/1511/17/15On HoldN/Atherefore, the contract has been awarded for Well 4 only, with a plan to seal Well 4 or convert it to an obersation well, if possible. A Drilling Observation Wellseparate contract will be awarded in the future to seal Well 5, and to construct a new observation well if Well 4 is not able to be converted with the original contract. The cleaning out of Well 4 is complete. The MDH will televise and inspect the well in the next few weeks to determine the next course of action. Short Elliot An RFP was distributed to three engineering fiirms to conduct a utility study for the area of Rosemount east of US52. SEH is the East Side Utility and ENG-183$35,505 N/AN/AN/A11/12/15N/A11/23/15N/Aselected engineering consultant for the study. The study is necessary in order to provide adequate service for a possible large StudyHendrickson industrial site development, and to use the opportunity to prepare trunk utility facilities for additional future development. (SEH) C:\\Users\\klk\\AppData\\Local\\Temp\\8.a. Project Update_347695\\8.a. Project UpdateUpdated: 02/17/2016