Loading...
HomeMy WebLinkAbout2.a. Arterial Connector Study – Pine Bend AreaG:\ENGPROJ\ENG 0168 - Pine Bend Area Corridor Study\City Council Items\20151012 r1 CWS Dakota County Pine Bend Study Update.docx EXECUTIVE SUMMARY City Council Work Session: March 9, 2016 AGENDA ITEM: Arterial Connector Study – Pine Bend Area (CP 97-111), ENG0168 AGENDA SECTION: Discussion PREPARED BY: Patrick Wrase, PE, Director of Public Works/City Engineer AGENDA NO. 2.a. ATTACHMENTS: Interim Options and Long-Term Options project maps APPROVED BY: ddj RECOMMENDED ACTION: Presentation and Discussion BACKGROUND The Pine Bend Area Arterial Connector Study has been underway since August of 2014. The purpose of the study is to look at the transportation needs in the Pine Bend Area over a 20-30 year term and develop a shared vision for the transportation improvements necessary to serve anticipated population growth. The study area is within the cities of Inver Grove Heights and Rosemount. The specific roadways of concern within Rosemount are County Road 73 (Akron Avenue) and County Road 71 (Blaine Avenue). Since the start of the study, County representatives have hosted numerous Project Management Team meetings, Open Houses, Council Workshops and neighborhood Outreach meetings. The most recent update to the Rosemount City Council occurred at the October 12, 2015 Work Session. At that meeting the current status of the design options was presented as well as a draft schedule for the approval of the Study Report. Since that time, County officials have held an additional Neighborhood Outreach meeting and have extended the schedule to consider the recommendations of project area residents. The County design team has refined the alignments, impacts and cost estimates for the Scenario B and D alignments. They have also reviewed and examined the alignment recommended by the neighborhood stakeholders. At this time, they are prepared to make a recommendation to 1) improve County Road 73 as a paved 2-lane road from Bonaire Path to Cliff Road in the Short Term and 2) to construct County Road 73 as a 4-lane road from County Road 42 to a future extension of County Road 32 (Cliff Road) in the Long Term, only after traffic volumes warrant the need. With the study process now complete, Kristi Sebastian and Brian Sorenson with Dakota County will be in attendance at the meeting to present the Pine Bend Area implementation recommendations. The presentation will cover the project purpose, needs, system scenarios, stakeholder coordination, cost implications, and the schedule for implementation. SUMMARY No action is required at this time. The City Council will be requested to adopt the final document in April or May of 2016.