Loading...
HomeMy WebLinkAbout6.k. Approve Change Order No. 2 – Horseshoe Lake Stormwater Lift StationI:\City Clerk\Agenda Items\Approved Items\6.k. Approve Change Order No. 2 – Horseshoe Lake Stormwater Lift Station.docx EXECUTIVE SUMMARY City Council Regular Meeting: May 3, 2016 AGENDA ITEM: Approve Change Order No. 2 – Horseshoe Lake Stormwater Lift Station, City Project 466 AGENDA SECTION: Consent PREPARED BY: Mitch Hatcher, Project Engineer AGENDA NO. 6.k. ATTACHMENTS: Change Order 2 APPROVED BY: ddj RECOMMENDED ACTION: Motion to approve Change Order No. 2 for Horseshoe Lake Stormwater Lift Station, City Project 466 BACKGROUND During construction of the forcemain as part of the Horseshoe Lake Lift Station project, when connecting the existing 10” and 16” forcemain installed with the Bella Vista 3rd Addition, it was found that the forcemain was not installed at the location and elevation assumed during design. The contractor performed work to realign the forcemain and make the proper connection to install the forcemain and lift station. The amount for Change Order 2 included time and materials for the work performed by the contractor. A copy of Change order 2 is attached. These contract changes result in a net increase of $10,638.00 to the current contract amount of $645,933.00 for a new total of $656,571.00. All costs associated with Change Order No. 2 will be funded by the Storm Core and Stormwater Utility Funds. SUMMARY Staff recommends Council approval of Change Order No. 2 for the Horseshoe Lake Stormwater Lift Station, City Project 466.