Loading...
HomeMy WebLinkAbout6.i. Consider Resolution to Reject Bids for 1.5 Million Gallon Ground Storage Reservoir and Booster StationG:\ENGPROJ\ENG 0179 - 1.5MG GST and Booster\Council Items\20160516 CC 1 5MG Reject Bids.docx EXECUTIVE SUMMARY City Council Regular Meeting: May 16, 2016 AGENDA ITEM: Consider Resolution to Reject Bids for 1.5 Million Gallon Ground Storage Reservoir and Booster Station, Engineering Project 179 AGENDA SECTION: Consent PREPARED BY: Patrick Wrase, PE, Director of Public Works / City Engineer AGENDA NO. 6.i. ATTACHMENTS: Bid Tabulation, Resolution APPROVED BY: ddj RECOMMENDED ACTIONS: Approve of a Resolution to Reject the Bids for the 1.5 Million Gallon Ground Storage Reservoir and Booster Station, Engineering Project 179 BACKGROUND: At the December 15, 2015 meeting the Council received the plans and specifications and authorized the advertisement for bids for the 1.5 Million Gallon Ground Storage Reservoir and Booster Station project (“project”), with bids scheduled to be received on January 21, 2016. Revised estimates prepared with the final bid documents indicated that the anticipated cost of the project had increased from $4,138,000 projected in the April 2015 preliminary estimates to $6,028,281. With the significant cost increase for the project a review of the project was conducted by a third party engineering consultant. The review recommended that the project could be delayed without adversely impacting the water system operation and that several cost savings opportunities could be examined in the ensuing time. Bids were received for the project on January 21, 2016 and ranged from $5,393,600 to $7,397,000 for the preferred project alternate. Due to the increased project cost, reduced urgency and potential future cost savings opportunities, Staff is recommending that the Council reject the bids for the project at this time. A system wide water facilities plan will be prepared to determine the most appropriate course of action for implementing water supply, treatment and storage additions. SUMMARY: Staff recommends that the 1.5 Million Gallon Ground Storage Reservoir and Booster Station be delayed and that bids be rejected at this time. CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2016 - A RESOLUTION REJECTING ALL BIDS FOR THE 1.5 MILLION GALLON RESERVOIR AND BOOSTER STATION ENGINEERING PROJECT 179 WHEREAS, the City Council of the City of Rosemount had ordered the Advertisement for Bids for the 1.5MG Ground Storage Tank and Booster Station, Engineering Project 179 and such bids were opened and read aloud on January 21, 2016; and WHEREAS, due to increased project cost, reduced urgency and potential future cost savings opportunities, the Council has determined that it is in the public interest to reject all bids at this time. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota: 1. All bids for the 1.5 MG Ground Storage Tank and Booster Station are hereby rejected. ADOPTED this 16th day of May, 2016. William H. Droste, Mayor ATTEST: Clarissa Hadler, City Clerk BIDTABULATION 1.5 MG GROUNDSTORAGE RESERVOIR AND BOOSTER STATION CITYOFROSEMOUNT PROJECT NO. ENG179 PROJECTCONSULTANT:OWNER:BIDSUBMITTALTIME: WSB & Associates, Inc.CityofRosemountTime: 10:00AM 477TemperanceStreet2875145thStreetWestDate: February5, 2016 St. Paul, MN55101Rosemount, MN55068 WSBProjectNo. 3206-00 Denotes CorrectedFigure ENGINEERS ESTIMATEMagney Construction, IncGridor Construction, Inc.RiceLake Const. GroupLS Black Constructors, Inc. No.ItemUnitsQtyUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price BidScheduleA - BaseBid 5,798,000.005,522,000.00$5,522,000.00$6,097,000.00$6,097,000.006,375,600.00$6,375,600.00$7,350,000.00$7,350,000.00LS1 TOTALBIDSCHEDULE A 5,798,000.00$5,522,000.00$6,097,000.00$6,375,600.00$7,350,000.00 BidScheduleB - BaseBid Imported selectgranularbackfill consistingofsands havingnomorethan5% (byweight) passingtheNo. 1 CY1000$ 10.00$ 20.00$20,000.00$10.50$10,500.0010.00$10,000.00$10.00$10,000.00200sieveandnomorethan40% (byweight) passingtheNo. 40sieve. Dispose ofunsuitable materialswherereplacedby2 CY1000$ 10.00$ 6.00$6,000.00$6.00$6,000.008.00$8,000.00$12.00$12,000.00importedselectgranularbackfill. TOTALBIDSCHEDULEB 20,000.00$26,000.00$16,500.00$18,000.00$22,000.00 5,548,000.00$6,113,500.00$6,393,600.00$7,372,000.00TOTALBIDSCHEDULEA + B BidAlternateA (8' sidewallheight) 755,000.00)$ (755,000.00) -210,000.00-$210,000.00-$380,000.00-$380,000.00-300,000.00-$300,000.00-$265,000.00-$265,000.00LS1 BidAlternateB (2' sidewallheight) 655,000.00)$ (655,000.00) -337,000.00-$337,000.00-$505,000.00-$505,000.00-110,000.00-$110,000.00-$370,000.00-$370,000.00LS1 BidAlternateC (extendscheduletoSpring2017) 100,000.00)$ (100,000.00) -115,000.00-$115,000.00-$250,000.00-$250,000.00-1,000,000.00-$1,000,000.00$25,000.00$25,000.00LS1 Iherebycertifythatthisisanexactreproductionofbidsreceived. Certifiedby: LicenseNo. 26430 Date:January5, 2016 Page1 C:\\Users\\klk\\AppData\\Local\\Temp\\201602053206-00Bid Tabulation_358335\\201602053206-00BidTabulation ENGINEERS ESTIMATEMagney Construction, IncGridor Construction, Inc.RiceLake Const. GroupLS Black Constructors, Inc. No.ItemUnitsQtyUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price BIDSUMMARYFOR - 1.5MGGROUND STORAGERESERVOIR ANDBOOSTER STATION 5,548,000.00$6,113,500.00$6,393,600.00$7,372,000.00BASEBID (SCHEDULEA + SCHEDULEB)$ 5,733,500.00$6,093,600.00$7,107,000.00BaseBid + AlternateA$ (755,000.00)$ 5,063,000.00$5,338,000.00 5,608,500.00$6,283,600.00$7,002,000.00BaseBid + AlternateB$ (655,000.00)$ 5,163,000.00$5,211,000.00 5,863,500.00$5,393,600.00$7,397,000.00BaseBid + AlternateC$ (100,000.00)$ 5,718,000.00$5,433,000.00 5,483,500.00$5,093,600.00$7,132,000.00BaseBid + AlternateA & C$ (855,000.00)$ 4,963,000.00$5,223,000.00 5,358,500.00$5,283,600.00$7,027,000.00BaseBid + AlternateB & C$ (755,000.00)$ 5,063,000.00$5,096,000.00 Page2 C:\\Users\\klk\\AppData\\Local\\Temp\\201602053206-00Bid Tabulation_358335\\201602053206-00BidTabulation