Loading...
HomeMy WebLinkAbout6.i. Horseshoe Lake Change Order 3EXECUTIVE SUMMARY City Council Meeting: June 7, 2016 AGENDA ITEM: Approve Change Order No. 3 Horseshoe AGENDA SECTION: Lake Stormwater Lift Station, City Project Consent 466 PREPARED BY: Mitch Hatcher, Project Engineer AGENDA NO. 6.i. ATTACHMENTS: Change Order 3 APPROVED BY: ddj RECOMMENDED ACTION: Motion to approve Change Order No. 3 for Horseshoe Lake Stormwater Lift Station, City Project 466 BACKGROUND As part of the Horseshoe Lake Lift Station project, Dakota Electric, the electric provider, requires the installation of a transformer on a concrete slab. During construction, in working with Northern Natural Gas, who has a high pressure gas distribution line running within its own easement through the project area, required a change to the proposed transformer location. The contractor has submitted the change order for the additional 140 feet of electrical service to the new location. The unit price for the change order work has been reviewed and is reasonable. A copy of Change Order 3 is attached. These contract changes result in a net increase of $5,880.00 to the current contract amount of $656,571.00 for a new total of $662,451.00. All costs associated with Change Order No. 3 will be funded by the Storm Core and Stormwater Utility Funds. SUMMARY Staff recommends Council approval of Change Order No. 3 for the Horseshoe Lake Stormwater Lift Station, City Project 466. I:\\City Clerk\\Agenda Items\\Approved Items\\6.i. Horseshoe Lake Change Order 3.docx CHANGE ORDER NO. 3 HORSESHOE LAKE STORMWATER LIFT STATIONJune 2, 2016 CITY PROJECT NO.: 466 WSB PROJECT NO.: 1928-80 OWNER:CONTRACTOR: Ryan Contracting, Inc. City of Rosemount P.O. Box 246 2875 145th St. W. Elko, MN Rosemount, MN 55068 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: The gas utility required the electrical transformer be moved outside of its utility easement. This change requires the transformer to be moved to a location that requires an additional 140 feet of major sized wiring and conduits to be installed between the transformer and the lift station control panel. IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE. CHANGE IN CONTRACT PRICE:CHANGE IN CONTRACT TIME: ORIGINAL CONTRACT PRICE:$644,000.00ORIGINAL CONTRACT TIME:7/1/2016 $12,571.00 PREVIOUS CHANGE ORDERS: NET CHANGE FROM PREVIOUS CHANGE ORDERS:NONE CONTRACT PRICE PRIOR TO THIS CHANGE ORDER:$656,571.00CONTRACT TIME PRIOR TO THIS CHANGE ORDER:7/1/2016 NET INCREASE/DECREASE OF THIS CHANGE ORDER: $5,880.00NET INCREASE OF CHANGE ORDER:NONE CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS:$662,451.00CONTRACT TIME WITH APPROVED CHANGE ORDERS7/1/2016 RECOMMENDED BY:APPROVED BY: GREG F. JOHNSON, PE, PROJECT MANAGERCONTRACTOR SIGNATURE WSB & ASSOCIATES, INC.RYAN CONTRACTING, INC. ENGINEERCONTRACTOR APPROVED BY: CITY ENGINEERCITY ADMINISTRATOR DATEDATE C:\\Users\\gjohnson\\Desktop\\Projects\\Rosemount\\Horseshoe Lake Stormwater Lift Station\\Construction\\Change Orders\\Change Order No. 3\\Change Order No. 3CO 1 Time & Material Cost Report INVOICE 1050-16-1 PO Box 246; 26350 France Ave., Elko, MN 55020 (952)894-3200 Proiect # & Name: Proiect Owner: Bill To: Description of Work: Date of work Performed: Worksheet # Horseshoe Lake Lift Station City of Rosemount WSB - Greg Johnson Elm= Change in location for electrical service Rate Units 5/31/2016 Due Upon Receipt; 1.5% per month Extension - IV-- LABOR - Supt. HR $110.00 0.00 $0.00 Foreman HR $100.00 0.00 $0,00 Laborer HR $84.00 0.00 $0.00 Operator HR $88.00 0.00 $0.00 EQUIPMENT 349 Excavator HR $250.00 OM $0,00 Cat 962 Loader HR $76.00 0.00 $0.00 HR $0.00 0.00 $0.00 HR $0.00 0.00 $0.00 $0.00 0.00 KOO $0.00 0.00 $0.00 SUBTOTAL L & F MOO MATERIALS & MISC. Lanoux Electric LS $5,600.00 1.00 $5,600.00 5% LS $280.00 1.00 $280.00 $0.00 0.00 $0.00 $0.00 OM $0.00 $0.00 0.00 $0.00 $0.00 0.00 $0.00 $5,880,00 Subtotal $5,880.00 0.00% $0.00 Subtotal $5,880.00, Total Amount Due After you have had a chance to review this request please call with any questions or concerns. Otherwise, we would greatly appreciate payment for the amount requested as soon as possible or added to our current pay estimate. Respectfully submitted, Ryan Contracting Co. Beth R. Tatge CFO LanouxElectric LLC S711Keswick Ave. Bill To: Ryan Contracting RO. Box 246 Elko New Market Minnesota 55020 Date Invoice No. P.O. Number Terms Project 05/09/16 89 5,600.00 5,600.00 Item Description Quantity Rate Amount service Provide and install electric service from the control 5,600.00 5,600.00 panel to the utility connection additional 140 feet. $ 40.00 per foot Total $5,600.00