Loading...
HomeMy WebLinkAbout2.c. City Hall Parking Lot ImprovementsEXECUTIVE SUMMARY City Council Work Session: June 13, 2016 AGENDA ITEM: City HallParking Lot Improvements, AGENDA SECTION: ENG0174Discussion PREPARED BY: Patrick Wrase,PE,City Engineer/Public AGENDA NO. 2.c. Works Director ATTACHMENTS: Parking Lot DesignOptionsAPPROVED BY: ddj RECOMMENDED ACTION: Discussion ISSUE Staff will presentdesign options for the proposed parking lot improvements for Council consideration and direction. BACKGROUND The lower City Hall parking lot is 29 years old and generally constructed with 3.5 inches of pavement and 6 inches of aggregate base. It is believed that the subgrade in some areas in the parking lot are poor, based on staff knowledge from when the parking lot was constructed. The west one-third of the parking lot was reconstructed 20 years ago and is generally constructed with 5 inches of pavement and 8 inches of aggregate base. The basic project at the lower City Hall parking lot includes removing the existing pavement and installing 4 inches of new pavement. Four regular parking stalls will be lost due to a change in requirements for larger ADA stalls. The project cost for this work is approximately $200,000. Below are several options for upgrading the existing parking lot based on feedback from the police department and public works staff. The costs provided are in addition to the cost for replacing the pavement in the parking lot. A figure has been provided to illustrate theoptions. Option 1: Dedicated police entrance: $115,000 Install median within parking lot to establish police entrance 6 new parking stalls are created Install storm sewer to address drainage changes caused by median Install metal railing along the median to restrict pedestrians from walking near garage entrance Option 1 will require the police phone to be relocated to the lower entrance. This is proposed to be completed as a separate project and the cost is unknown at this time. The proposed cost does not address removing or repairing the brick retaining walls on the west and south side of the building. G:\\Pavement Management\\Parking Lots\\2016\\Council Items\\20160613 CCWS Parking Lot Improvements (2).docx Option 2: Sidewalk Repair: $18,000 Replace sidewalk panels and add ADA compliant ramp near lower doors to City Hall Add ADA compliant pedestrian ramps to the existing sidewalk surrounding the parking lot Option 3: Improve drainage along north side of City Hall: $15,000 Install a new catch basin at the northwest corner of the building Grade grass area north of City Hall to direct drainage to the new catch basin Option 4: Additional Parking: $79,000 Install 23 new regular stalls and relocate 2 ADA stalls to the north end of the parking lot. Relocate the dumpster to east side of parking lot, north of City Hall. The total cost to replace the pavement in the parking lot and include Option 1, 2, 3, & 4is $425,000. Pavement replacement can be delayed for several years if Council is comfortable with current condition of the pavement in the parking lot. Delaying the project will not increase the project cost with the exception of construction inflation. Funding for the parking lot improvements is proposed from the Parking Lot Maintenance fund. The current balance of the assigned funds in the Parking Lot Maintenance Fund is approximately $729,000. Of this amount, $400,000 is reserved for the improvements of the Community Center Parking Lot in a joint project with the National Guard. The remaining $329,000 could be utilized for the City Hall Lot along with Option 1 with a total estimated cost of $315,000. The additional three options for the City Hall Lot, totaling $112,000, could be funded with balances available in the Building CIP. SUMMARY Staff is requesting Council review and consideration for proceeding with the development of plans and specifications for the City Hall parking lot and trail improvements. I:\\City Clerk\\Agenda Items\\Approved Items\\2.c. City Hall Parking Lot Improvements.docx 2 U N Mo f\fcl F- H N 'nZ Z H W w Z w > > w > � � O O a a Of a w � J C7 C7 W Q Q Z U 3: Z Y :j w Q K [ifQ a uo o a N M V O O O O F— F— H F— a a a 3- 0 O O O O I1,, 1111 1 111;1,,v11 I, 1,111 11, 11,1v,III ,II 1,v1,11' I, -11h „11 I I f 1,1,11 ,111,1 „11,1 1 111111 I I Ifllll � ,11111 I lllflf I 1 f I J I I I I l 1 1 1 I \ II I i I I f ( 1 I I I I I f \ 11 I I 1 a7F—I I\ 11 I 11 I =_ 1 - v" -- I