HomeMy WebLinkAbout8.a. City Projects Update
City Projects Update
Council
City Council Receives
Public Award Assessment Contract Payments %
Project Project NameAuthorizes Plans/Specs Open BidsStart DateContractorSummary
HearingContractHearingAmountTo DateComplete
NumberPlans/SpecsAuthorize Ad
For Bid
E.H. Renner &
416$433,105$380,65888%
Well 1610/01/13N/A11/18/1402/27/1503/17/1505/26/15N/ADrilling of the production well is complete. Final payment was approved at the June 7, 2016 City Council meeting.
Sons, Inc.
145th Street
Easement Agreement recently signed by Canadian Pacific. Agreement already in place with Union Pacific. Railroad work for UP will
Pedestrian UPRR, CPRR,
447
01/02/13N/AN/Abegin soon. An agreement with CP for the track extensions can be established now that the easement agreement has been executed.
Improvements at TBD
Upon execution of the agreement with CP for the track extensions, work will begin. Sidewalk work will begin after railroad work.
RR Crossing
Danbury Way McNamara Construction began in early May and is expected to be completed in August. The existing pavement has been reclaimed, storm sewer
453$1,234,504
07/21/1507/21/1501/19/1602/19/1604/19/16June 201604/19/16
ReconstructionContractinginstallation is underway.
This development includes 28 single-family homes by developer U.S. Home Corporation (Lennar). Lennar is administering the
PRIVATEPRIVATE
464
Bella Vista 3rdN/AN/A08/03/15N/ASR Weidema
contract privately. Base course paving and sidewalks are complete. Wear course paving will be complete in summer 2016.
132nd Street West Council received the feasibility report and assessment agreement on October 6, 2015. This project is on hold until the status of the
465
N/A
ImprovementsDunmore project is determined.
Horseshoe Lake Ryan
466$656,571$439,00067%
05/05/15N/A08/18/1509/04/1509/15/1510/19/15N/AUnderground utilities were completed in November. Electrical work, site work, and restoration will be completed by summer 2016.
Lift StationContracting
Dunmore 1st This development includes 30 single-family homes by developer Copper Creek. Copper Creek is expected to administer the contract
PRIVATEPRIVATE
467
N/A
Additionprivately, but the project is temporarily on hold.
Prestwick Place Douglas Kerr This development includes 31 single-family homes by developer KRB Development I, Inc. KRB is administering the contract privately.
PRIVATEPRIVATE
468
N/AN/AN/A
12thUndergroundBase course paving and sidewalks are complete. Wear course paving will be complete in summer 2016.
This development includes 15 single-family homes by developer U.S. Home Corporation (Lennar). Lennar is administering the
PRIVATEPRIVATE
469
Bella Vista 4thN/AN/AN/ASR Weidemacontract privately. Contractor has completed utility work, street, and base course paving. Sidewalks will be installed later this summer.
Wear course paving will occur in Spring 2017.
The project includes installing a new sidewalk along the north side of 144th Street from Chili Ave to Cameo Ave, installing a trail on
the Shannon Park Elementary property connecting the school with Shannon Parkway, and installing an enhanced pedestrian
Safe Routes to August crosswalk at Evermore Parkway and Creggs Circle. WSB & Associates, Inc. is the engineering consultant for the design and
ENG-180
10/20/1504/05/1606/21/1608/02/16
School2016construction administration. The project is being funded with a combination of Federal and Local funds. All temporary and permanent
easements have been secured for the project. The project ROW certificate is complete and all state and federal authorizations have
been secured. The bid opening is set for June 21. Construction is expected to begin in August and be completed in September 2016.
Wells 4 & 5 Well 4: Waiting for MDH to make a recommendation for the design/method for the conversion of Well 4 to an observation well. Keys
Keys Well
ENG-181$39,250$30,87579%
Sealing, New N/A09/01/1509/29/1511/17/15On HoldN/Awill be providing a quote to do this work. Well 5: Traut will be on site June 16 to drill and cleanout well 5. MDH will then televise
and
Drilling
Observation Wellgamma log the well to determine how to properly seal the well.
Short Elliot
An RFP was distributed to three engineering firms to conduct a utility study for the area of Rosemount east of US52. SEH is the
East Side Utility and
ENG-183$35,505
N/AN/AN/A11/12/15N/A11/23/15N/Aselected engineering consultant for the study. The study is necessary in order to provide adequate service for a possible large
StudyHendrickson
industrial site development, and to use the opportunity to prepare trunk utility facilities for additional future development.
(SEH)
Connemara Park
The Connemara Park parking lot is scheduled for maintenance in 2016. In-house staff is working on the design for the project, which
ENG-186
Parking Lot N/AN/AN/AN/AN/AFall 2016N/A
will include minor curb & gutter enhancements, as well as full pavement replacement.
Maintenance
C:\\Users\\caw\\AppData\\Local\\Temp\\8.a. City Projects Update_362976\\8.a. City Projects UpdateUpdated: 06/16/2016