Loading...
HomeMy WebLinkAbout8.a. City Projects Update City Projects Update Council City Council Receives Public Award Assessment Contract Payments % Project Project NameAuthorizes Plans/Specs Open BidsStart DateContractorSummary HearingContractHearingAmountTo DateComplete NumberPlans/SpecsAuthorize Ad For Bid E.H. Renner & 416$433,105$380,65888% Well 1610/01/13N/A11/18/1402/27/1503/17/1505/26/15N/ADrilling of the production well is complete. Final payment was approved at the June 7, 2016 City Council meeting. Sons, Inc. 145th Street Easement Agreement recently signed by Canadian Pacific. Agreement already in place with Union Pacific. Railroad work for UP will Pedestrian UPRR, CPRR, 447 01/02/13N/AN/Abegin soon. An agreement with CP for the track extensions can be established now that the easement agreement has been executed. Improvements at TBD Upon execution of the agreement with CP for the track extensions, work will begin. Sidewalk work will begin after railroad work. RR Crossing Danbury Way McNamara Construction began in early May and is expected to be completed in August. The existing pavement has been reclaimed, storm sewer 453$1,234,504 07/21/1507/21/1501/19/1602/19/1604/19/16June 201604/19/16 ReconstructionContractinginstallation is underway. This development includes 28 single-family homes by developer U.S. Home Corporation (Lennar). Lennar is administering the PRIVATEPRIVATE 464 Bella Vista 3rdN/AN/A08/03/15N/ASR Weidema contract privately. Base course paving and sidewalks are complete. Wear course paving will be complete in summer 2016. 132nd Street West Council received the feasibility report and assessment agreement on October 6, 2015. This project is on hold until the status of the 465 N/A ImprovementsDunmore project is determined. Horseshoe Lake Ryan 466$656,571$439,00067% 05/05/15N/A08/18/1509/04/1509/15/1510/19/15N/AUnderground utilities were completed in November. Electrical work, site work, and restoration will be completed by summer 2016. Lift StationContracting Dunmore 1st This development includes 30 single-family homes by developer Copper Creek. Copper Creek is expected to administer the contract PRIVATEPRIVATE 467 N/A Additionprivately, but the project is temporarily on hold. Prestwick Place Douglas Kerr This development includes 31 single-family homes by developer KRB Development I, Inc. KRB is administering the contract privately. PRIVATEPRIVATE 468 N/AN/AN/A 12thUndergroundBase course paving and sidewalks are complete. Wear course paving will be complete in summer 2016. This development includes 15 single-family homes by developer U.S. Home Corporation (Lennar). Lennar is administering the PRIVATEPRIVATE 469 Bella Vista 4thN/AN/AN/ASR Weidemacontract privately. Contractor has completed utility work, street, and base course paving. Sidewalks will be installed later this summer. Wear course paving will occur in Spring 2017. The project includes installing a new sidewalk along the north side of 144th Street from Chili Ave to Cameo Ave, installing a trail on the Shannon Park Elementary property connecting the school with Shannon Parkway, and installing an enhanced pedestrian Safe Routes to August crosswalk at Evermore Parkway and Creggs Circle. WSB & Associates, Inc. is the engineering consultant for the design and ENG-180 10/20/1504/05/1606/21/1608/02/16 School2016construction administration. The project is being funded with a combination of Federal and Local funds. All temporary and permanent easements have been secured for the project. The project ROW certificate is complete and all state and federal authorizations have been secured. The bid opening is set for June 21. Construction is expected to begin in August and be completed in September 2016. Wells 4 & 5 Well 4: Waiting for MDH to make a recommendation for the design/method for the conversion of Well 4 to an observation well. Keys Keys Well ENG-181$39,250$30,87579% Sealing, New N/A09/01/1509/29/1511/17/15On HoldN/Awill be providing a quote to do this work. Well 5: Traut will be on site June 16 to drill and cleanout well 5. MDH will then televise and Drilling Observation Wellgamma log the well to determine how to properly seal the well. Short Elliot An RFP was distributed to three engineering firms to conduct a utility study for the area of Rosemount east of US52. SEH is the East Side Utility and ENG-183$35,505 N/AN/AN/A11/12/15N/A11/23/15N/Aselected engineering consultant for the study. The study is necessary in order to provide adequate service for a possible large StudyHendrickson industrial site development, and to use the opportunity to prepare trunk utility facilities for additional future development. (SEH) Connemara Park The Connemara Park parking lot is scheduled for maintenance in 2016. In-house staff is working on the design for the project, which ENG-186 Parking Lot N/AN/AN/AN/AN/AFall 2016N/A will include minor curb & gutter enhancements, as well as full pavement replacement. Maintenance C:\\Users\\caw\\AppData\\Local\\Temp\\8.a. City Projects Update_362976\\8.a. City Projects UpdateUpdated: 06/16/2016